Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹69,714.09Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹70,064.41+₹350.32 (0.50%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹70,000
EMD Value
₹1,400
Closing Date
17 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER REW KISHTWAR
HALL NO. 4 O/O EXECUTIVE ENGINEER REW KISHTWAR
Refer BoQ
2026_RDPR_318601_34
e-NIT No 67 of REW KISHTWAR 2026-27 Dated. 30.07.2026
Open Tender
Civil Works
Percentage
30 days
Kishtwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹1,400
31 Aug 2026
30 Jul 2026
18 Aug 2026
30 Jul 2026
17 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of GI Pipes from nearest source to road side of work by Mechanical Transport for an av. Distance 240 km of including loading unloading and stacking. | 0.55 | MT | 2,154.19 | ₹1,184.8 |
| 2 | Carriage of GI pipes from road side to site of work by manual labor for an average distance of by Head Load 400m. | - | MT | - | - |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits, and the like not exceeding 10 sqm on plan , depth up to 1.5mtr including disposal of excavated earth up to 1 mtr from cutting edge , disposed earth is to be leveled and neatly dressed. 70% and 30% | - | CUM | 1 | - |
| 4 | Providing and fixing G.I. pipes complete with G.I. fittings excluding
trenching and refilling etc. (external work)150 mm dia. nominal bore | - | kg | - | - |
| 5 | Returning/Refilling the available excavated soil as required in Layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming ,watering etc | 1 | sqm | 1 | ₹1 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in Position and applying a priming coat of approved steel primer all complete.WELDED | - | kg | 1 | - |
| 7 | add cost of cib | - | NOS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_1051622.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .