| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.5 L+₹12,830.64 (3.85%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.6 L+₹31,765.17 (9.53%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.7 L+₹34,879.41 (10.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.0 L+₹68,762.26 (20.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹6.2 L
EMD Value
₹12,460
Closing Date
24 Jan 2026, 6:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA POKARAN
Construction of interlocking tiles Road at MAHESHWARI SAMAJ SHAMSHAN
2026_DLB_529258_1
RO NO 5448 WORK NO 14
Open Tender
Civil Works
Percentage
60 days
POKARAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
E.O NAGAR PALIKA POKARAN
₹12,460
17 Feb 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
24 Jan 2026
19 Jan 2026
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m
Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
Providing and fixing of precast concrete interlocking tiles of desired shape of M 30 grade manufactured from fully computerized automatic stationery hydraulic vibrio pressed machine and fully computerized automatic batching plant of class A1/A2 as per BS 6717:2001. The CC interlocking paving blocks be laid on average 50mm. thick bed of coarse sand and the joint is to be filled with fine sand. Laying procedure on compacted sub-base as defined. Complete job is to be executed as per the instruction of Engineer in-charge. The rates to be inclusive of all lead & Lifts etc. complete as per specifications. Tensile splitting strength, abrasion and braking load etc. as per BS 6717:2001, Grey cement. 80mm thick
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in-charge. Internal work - Exposed on wall 25 mm nominal outer dia .Pipe
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
Provisions.pdf
Tender Documents • 0.27 MB
BOQ_943947.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .