Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹43,496.00Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹46,214.50+₹2,718.50 (6.25%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹54,000
EMD Value
₹1,080
Closing Date
18 Aug 2026, 6:00 pmClosed
EXEN REW SRINAGAR
OFFICE OF THE EXECUTIVE ENGINEER REW SRINAGAR
Upgradation of culvert near Shahi Hamdan Mohalla via Ab Majeed Malik at Panzinara-B
2026_RDPR_320743_6
ENIT18/REW SGR 2026-27
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹1,080
20 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
18 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.Bituminous road. | - | Sqm | 1 | - |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level .1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1 | Cum | 1 | ₹1 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete (TMT Bars).Qty.vide item No.2 @ 1 Qtl/cum | - | kg | - | - |
| 4 | P/Fixing of formwork including removal of same. | - | Sqm | - | - |
| 5 | Engagement of labourers for clearance of Drain by way of removing mulba,debris,weed,unwanted plants etc.including disposal of the same outside the Municipal limits. | - | No | - | - |
| 6 | Add provision for cost of signboard photographs and other unforeseen items etc. (STA) | - | No | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1067438.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .