Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC NO 32 BAJANAI KOIL STREET PUDUPADI POST KILAMBADI VILLAGE ARCOT | ARCOT | RANIPET | TAMIL NADU | ₹11.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.7 LRejected-AOC 204 4 KATHIRKUPPAM VILLAGE MUGUNDARAYAPURAM POST RANIPET WALAJA TALUK VELLORE 632 405 | VELLORE | VELLORE | TAMIL NADU | 632405 | ₹12.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹13.1 LRejected-AOC | ₹13.1 L | L3 | Rejected-AOC L3 |
| 4 | L4₹14.2 LRejected-AOC | ₹14.2 L | L4 | Rejected-AOC L4 |
| 5 | L5₹14.7 LRejected-AOC | ₹14.7 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | G.Dhanasekar(Pavi Traders/Magizhan Infra) L5 | Selvam L3 | M/S RK CONSTRUCTIONS L1 | M/S ASL ENTERPRISE L4 | Manigandan L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 116.33 | cum | 246.52 ₹28,677.67 | 221.5 ₹25,767.1 | 87.7 ₹10,202.14 Lowest | 227.52 ₹26,467.4 | 246.52 ₹28,677.67 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 11.63 | cum | 5,500.66 ₹63,972.68 | 4,632.68 ₹53,878.07 | 4,158 ₹48,357.54 | 979.78 ₹11,394.84 Lowest | 5,156.02 ₹59,964.51 |
| 3.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete | 253.8 | cum | 514.5 ₹1,30,580.1 | 462.28 ₹1,17,326.66 | 421.58 ₹1,06,997 | 242.16 ₹61,460.21 Lowest | 300 ₹76,140 |
| 4.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 129.02 | Sqm | 5,890.55 ₹7,59,998.76 | 5,292.66 ₹6,82,858.99 | 4,736.96 ₹6,11,162.58 Lowest | 8,072.75 ₹10,41,546.21 | 5,050.55 ₹6,51,621.96 |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 38.42 | cum | 6,761.09 ₹2,59,761.08 | 6,074.84 ₹2,33,395.35 | 4,736.96 ₹1,81,994 | 1,711.5 ₹65,755.83 Lowest | 6,761.09 ₹2,59,761.08 |
| 6.00 | GST 18% | 1 | No | 2,23,738.25 ₹2,23,738.25 | 2,00,380.71 ₹2,00,380.71 | 1,72,568.39 ₹1,72,568.39 Lowest | 2,17,192.41 ₹2,17,192.41 | 1,93,709.74 ₹1,93,709.74 |
Tender Value
Refer Docs
EMD Value
₹14,820
Closing Date
30 Jun 2026, 3:00 pmClosed
The Block development officer(BP), walajah block.
The Block development office, walajah block.
Construction Retaining wall at Seekarajpuram Mottur near Kailasanathar murugan kovil H/O Seekarajapuram Panchayat
2026_RDTN_680816_1
A2/1661/2025
Open Tender
Civil Works
Works
90 days
The Block development office, walajah block.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,820
10 Jul 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 116.33 | cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 11.63 | cum | - | - |
| 3 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete | 253.8 | cum | - | - |
| 4 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 129.02 | Sqm | - | - |
| 5 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 38.42 | cum | - | - |
| 6 | GST 18% | 1 | No | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_818159.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_818159.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].