Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.8 L
Closing Date
10 Nov 2021, 4:00 pmClosed
Er Rajesh Sumbria
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2021_PWDJK_145446_8
e-NIT No.55 of 2021-22 dated 27-10-2021
Open Tender
Civil Works
Item Rate
60 days
Basohli
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Yes
Detail of Treasury Challan as per NIT
Exempted
Executive Engineer PWD R and B Division Basohli
12 Nov 2021
28 Oct 2021
11 Nov 2021
29 Oct 2021
10 Nov 2021
31 Oct 2021
30 Oct 2021
Amount
Earthwork in bulk excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth as directed by Engineer-in-charge, including all leads and lift. a) All Kind of soil.
Providing and laying cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: a) 1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate 40mm nominal size) (including all leads and lifts carriages of material by MT/HL).
Providing and laying cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: a) 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) (including all leads and lifts carriages of material by MT/HL).
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring ,shuttering, finishing and reinforcement. All work upto plinth level with: a) 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size) (including all leads and lifts carriages of material by MT/HL).
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttreses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centring shuttering, finishing and reinforcement. a) 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size) (including all leads and lifts carriages of material by MT/HL).
Centring and shuttering including strutting, propping etc.and removal of form work for :
a) Foundation, footings, bases of columns etc. for mass concrete
b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Hand packing stones in wire crates of B.A. wire 4mm & mesh of size 10cm x 10 cm including cost of stones & wire crates. The wire crates length should not exceed 6.00 mtr. (including all leads and lifts carriages of material by MT/HL).
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. a) Cold twisted bars.
Carriage of the following materials by Mechanical Transport from source to site of work incl. loading, unloading and stacking complete :- a) Sand from Billawar crusher for an average lead of 35.00 Km. by M.T. b) Stone aggregate 40mm nominal size & above from Billawar crusher for an average lead of 35.00 Km. by M.T. c) Stone aggregate (Crusher bajree) below 20mm nominal size Billawar crusher for an average lead of 35.00 Km. by M.T. d) Stones / boulders from Behani nallah for an average lead of 8.00 Km. by M.T.
Omesh Sharma
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .