Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAdmitted-Finance | ₹19.4 L | L1 | Admitted-Finance |
| 2 | L1₹19.4 LAdmitted-Finance 39 F NEW REVENUE COLONY ACHALPUR KADIPUR SADAR PRATAPGARH | PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹19.4 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shiv Enterprises L1 | M/S Kanchan and Company L1 |
|---|---|---|---|---|---|
| 0.00FIXED MONTHLY CHARGES | |||||
| 1.00 | Manning & Fuelling of Dept. Van.
Monthly charges for providing:
1. Skilled Operator: (Diploma/ITI) for testing.
2. Commercial Driver: For Dept. Vehicle.
3. Fuel: Diesel for vehicle movement within Circle.
4. Custody: Safekeeping & Cleaning of Van with minor maintenance. (Availability: 24x7) | 12 | Month | 48,000 ₹5.8 L | 48,000 ₹5.8 L |
| 2.00VARIABLE EXECUTION CHARGES (LABOUR) | |||||
| 3.0033 KV Cable Fault (Labour) | |||||
| 3.01 | Assistance Basis: Rectification of 33 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling& levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | 30 | Job/Fault | 2,799 ₹83,970 | 2,800 ₹84,000 |
| 3.02 | Assistance Basis: Replacement of 33 KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal. | 20 | Job/Fault | 2,500 ₹50,000 | 2,500 ₹50,000 |
| 3.03 | Full Execution Basis: Rectification of 33 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work | 30 | Job/Fault | 6,501 ₹2.0 L | 6,500 ₹1.9 L |
| 3.04 | Full Execution Basis: Replacement of 33 KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution. | 25 | Job/Fault | 4,000 ₹1 L | 4,000 ₹1 L |
| 4.0011 KV Cable Fault (Labour) | |||||
| 4.01 | Assistance Basis: Rectification of 11KVUG fault using store-issued Straight-Through Joint (STJ), where jointing/ installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | 30 | Job/Fault | 2,399 ₹71,970 | 2,400 ₹72,000 |
Updated dates
Tender Value
₹19.6 L
EMD Value
₹19,550
Closing Date
25 Mar 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2026_PVVNV_1120741_1
57/SE/EUDC-I-Pra/2025-26
Open Tender
Electrical Works
365 days
EUDC-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Account Number-0012002100504911
₹19,550
1 Apr 2026
27 Feb 2026
25 Mar 2026
27 Feb 2026
25 Mar 2026
27 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Superintending Engineer, E.U.D.C.-I, Prayagraj
Name of Work: Finding & Repairing of 33 KV, 11 KV and L.T. Cable faults with the help of Departmental Fault locator machine, under E.U.D.D., Rambagh, Naini, Kalyani Devi & Karelabagh, Prayagraj
Contract No : 57/SE/EUDC-I-Pra/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Work Description Item Code / Make Quantity Unit Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0 FIXED MONTHLY CHARGES
1 Manning & Fuelling of Dept. Van. Monthly charges for providing: 1. Skilled Operator: (Diploma/ITI) for testing. 2. Commercial Driver: For Dept. Vehicle. 3. Fuel: Diesel for vehicle movement within Circle. 4. Custody: Safekeeping & Cleaning of Van with minor maintenance. (Availability: 24x7) Month Excess(+) Full Conversion INR
2 VARIABLE EXECUTION CHARGES (LABOUR)
3 33 KV Cable Fault (Labour)
3.01 Assistance Basis: Rectification of 33 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling& levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. Job/Fault Excess(+) Full Conversion INR
3.02 Assistance Basis: Replacement of 33 KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal. Job/Fault Excess(+) Full Conversion INR
3.03 Full Execution Basis: Rectification of 33 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work Job/Fault Excess(+) Full Conversion INR
3.04 Full Execution Basis: Replacement of 33 KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution. Job/Fault Excess(+) Full Conversion INR
4 11 KV Cable Fault (Labour)
4.01 Assistance Basis: Rectification of 11KVUG fault using store-issued Straight-Through Joint (STJ), where jointing/ installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. 30 Job/Fault Excess(+) Full Conversion INR
4.02 Assistance Basis: Replacement of 11KVIndoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal 30 Job/Fault Excess(+) Full Conversion INR
4.03 Full Execution Basis: Rectification of 11 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/ installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work. 40 Job/Fault Excess(+) Full Conversion INR
4.04 Full Execution Basis:Replacement of 11 KV Indoor/ Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution. 40 Job/Fault Excess(+) Full Conversion INR
LT Cable Fault (Labour)
Assistance Basis: Rectification ofLTUG fault using store-issued Straight-Through Joint (STJ), where jointing/ installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. 20 Job/Fault Excess(+) Full Conversion INR
Assistance Basis:Replacement of LT Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal 20 Job/Fault Excess(+) Full Conversion INR
Full Execution Basis: Rectification of LTUG fault using store-issued Straight-Through Joint (STJ), where jointing/ installation is NOT in the scope of the Supplier Firm.The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work 20 Job/Fault Excess(+) Full Conversion INR
Full Execution Basis: Replacement of LT Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution. 20 Job/Fault Excess(+) Full Conversion INR
6 Supply of 33 KV Heat Shrinkable type Cable Termination Kits XLPE Cable conforming to VDE-0278/1EEE-48-1975/IS–13573-1992 and ESI STD. 09-13 and all other relevant standards complete with all accessories for following type & size :-
6.01 Outdoor/Indoor size 3 x 300 sq mm. 8 No. Excess(+) Full Conversion INR
6.02 Straight through 3 x 300 sq mm. 8 No. Excess(+) Full Conversion INR
Supply of 11 KV Heat Shrinkable type Cable Termination Kits XLPE Cable conforming to VDE-0278/1EEE-48-1975/ IS–13573-1992 and ESI STD. 09-13 and all other relevant standards complete with all accessories for following type & size :-
Outdoor size 3 x 185 sq mm. 8 No. Excess(+) Full Conversion INR
Indoor size 3 x 185 sq mm. 8 No. Excess(+) Full Conversion INR
Straight through size 3 x 185 sq mm. 8 No. Excess(+) Full Conversion INR
Attending to Underground (UG) Consumer Service Cable fault. Scope includes excavation to expose the faulty joint, repairing and sealing the cable using HT Tape, and backfilling/leveling the road to its original condition. The rate is inclusive of all labor, materials (including HT tape), Tools & Plants (T&P), and consumables required for the completion of work.
Single Phase Connection 20 Job Excess(+) Full Conversion INR
Three Phase Connection 20 Job Excess(+) Full Conversion INR
Extra Charges & Reimbursement of Outstation Duty (If required)
Fuel Charges 200 Km Excess(+) Full Conversion INR
Outstation Charges 20 Job/Fault Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_2084873.xls
BOQ • 0.30 MB
T57.rar
Tender Documents • 0.13 MB
Download all tender documents and submit your bid