Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-Finance | ₹35.5 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹38.4 L+₹2.9 L (8.14%)Rejected-Finance NAU PUKHRI ROAD MILLAN PALLY BYE LANE 2 NEAR GOYAL PALACE PO DISTT TINSUKIA ASSAM 786125 | TINSUKIA | ASSAM | 786125 | ₹38.4 L+₹2.9 L (8.14%) | L2 | Rejected-Finance High Rates |
| 3 | L3₹39.0 L+₹3.5 L (9.83%)Rejected-Finance COLLEGE ROAD CHABUA PO CHABUA DIST DIBRUGARH ASSAM 786184 | DIBRUGARH | ASSAM | 786184 | ₹39.0 L+₹3.5 L (9.83%) | L3 | Rejected-Finance High rates |
| 4 | L4₹39.7 L+₹4.2 L (11.9%)Rejected-Finance KUSHAL KONWAR PATH PROFESSOR COLONY RANGAGORA ROAD TINSUKIA ASSAM | TINSUKIA | TINSUKIA | ASSAM | 786125 | ₹39.7 L+₹4.2 L (11.9%) | L4 | Rejected-Finance High rates |
| 5 | L5₹40.6 L+₹5.1 L (14.4%)Rejected-Finance A 153 HQ CE EC KOLKATA LEKHAPANI POST TINSUKIA DIST ASSAM STATE | ₹40.6 L+₹5.1 L (14.4%) | L5 | Rejected-Finance High rates |
| Sl No | Description | Qty | Unit | M/s Singh enterprises L5 | M/S N K SAI TRADING L1 | M/S A K BROTHERS L8 | ADNEEDS ENTERPRISE L9 | M/s PRABIR ENTERPRISE L3 | M/s Sashi Enterprise L7 | M/S A K ENTERPRISE L6 | MAA COMMUNICATION L2 | ASTRA INFRACON L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling asbestos cement sheet, ridge (corrugated, semicorrugated, plain etc.) in roof covering,wall etc or of similar types complete all as specified and directed. | 256 | Sqm | 30 ₹7,680 | 22 ₹5,632 | 22 ₹5,632 | 33 ₹8,448 | 38 ₹9,728 | 27 ₹6,912 | 28 ₹7,168 | 20 ₹5,120 Lowest | 27 ₹6,912 |
| 2.00 | Dismantling of timber scantlings 40 sqcm & over in section framed work complete all as specified and directed. | 4 | Cum | 1,371 ₹5,484 | 680 ₹2,720 Lowest | 1,293 ₹5,172 | 1,125 ₹4,500 | 1,337 ₹5,348 | 1,280 ₹5,120 | 1,155 ₹4,620 | 1,200 ₹4,800 | 1,350 ₹5,400 |
| 3.00 | Taking down chowkhats or frames with shutters without taking off shutters from the frames not exceeding 1.5 Sqm each complete all as specified and directed. | 23 | Each | 285 ₹6,555 | 125 ₹2,875 Lowest | 269 ₹6,187 | 295 ₹6,785 | 312 ₹7,176 | 259 ₹5,957 | 241 ₹5,543 | 200 ₹4,600 | 240 ₹5,520 |
| 4.00 | Taking down chowkhats or frames with shutters (without taking off shutters from the frame) exc 1.5 sqm and n.exc 4 sqm each, complete in all respect as specified and directed. | 3 | Each | 385 ₹1,155 | 220 ₹660 Lowest | 362 ₹1,086 | 315 ₹945 | 330 ₹990 | 350 ₹1,050 | 324 ₹972 | 300 ₹900 | 378 ₹1,134 |
| 5.00 | Demolition of cement concrete (unreinforced) in ground floors of any description (below or above ground level) complete all as specified and directed. | 2 | Cum | 1,255 ₹2,510 | 899 ₹1,798 Lowest | 1,625 ₹3,250 | 1,492 ₹2,984 | 1,605 ₹3,210 | 1,105 ₹2,210 | 1,342 ₹2,684 | 1,500 ₹3,000 | 1,380 ₹2,760 |
| 6.00 | Taking down cement plaster of any thickness and description on brick/concrete/stone walls, ceilings, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. | 100 | Sqm | 35 ₹3,500 | 62 ₹6,200 | 30 ₹3,000 | 37 ₹3,700 | 42 ₹4,200 | 32 ₹3,200 | 29 ₹2,900 Lowest | 35 ₹3,500 | 32 ₹3,200 |
| 7.00 | Taking down plastering on lathing (other than wire-netting), without removing lathing, in cement mortar (one side only measured in cases where both sides are plastered complete all as specified and directed. | 95 | Sqm | 45 ₹4,275 | 42 ₹3,990 | 29 ₹2,755 Lowest | 46 ₹4,370 | 30 ₹2,850 | 42 ₹3,990 | 50 ₹4,750 | 35 ₹3,325 | 40 ₹3,800 |
| 8.00 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar complete all as specified and directed. | 0.3 | Cum | 1,177 ₹353.1 | 650 ₹195 Lowest | 1,371 ₹411.3 | 1,185 ₹355.5 | 1,070 ₹321 | 1,354 ₹406.2 | 1,254 ₹376.2 | 1,000 ₹300 | 1,080 ₹324 |
| 9.00 | Dismantling wooden weather boarding of any description fixed in any position with nails/ screws complete all as specified and directed. | 18 | Sqm | 36 ₹648 | 22 ₹396 Lowest | 41 ₹738 | 37 ₹666 | 33 ₹594 | 39 ₹702 | 36 ₹648 | 30 ₹540 | 33 ₹594 |
| 10.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish offt the premises complete all as specified and directed. | 65 | Sqm | 98 ₹6,370 | 42 ₹2,730 Lowest | 100 ₹6,500 | 106 ₹6,890 | 97 ₹6,305 | 107 ₹6,955 | 98 ₹6,370 | 90 ₹5,850 | 98 ₹6,370 |
Tender Value
₹38.0 L
EMD Value
₹76,000
Closing Date
28 Jul 2026, 6:00 pmClosed
GE Dinjan No 2
GE Dinjan No 2 Post Dinjan Dist Tinsukia Assam Pin 786 189
ADDITION/ALTERATION TO BLDG NO. T-182 AT FSD PANITOLA UNDER GE DINJAN NO.2
2026_MES_773952_2
8961/E8
Open Tender
Civil Works
Item Rate
180 days
As per NIT
Pls Refer Tender Documents
9 documents required · 9 mandatory
₹500
GE Dinjan No 2
₹76,000
Yes
17 Sept 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
28 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling asbestos cement sheet, ridge (corrugated, semicorrugated, plain etc.) in roof covering,wall etc or of similar types complete all as specified and directed. | 256 | Sqm | - | - |
| - | Dismantling of timber scantlings 40 sqcm & over in section framed work complete all as specified and directed. | 4 | Cum | - | - |
| - | Taking down chowkhats or frames with shutters without taking off shutters from the frames not exceeding 1.5 Sqm each complete all as specified and directed. | 23 | Each | - | - |
| - | Taking down chowkhats or frames with shutters (without taking off shutters from the frame) exc 1.5 sqm and n.exc 4 sqm each, complete in all respect as specified and directed. | 3 | Each | - | - |
| - | Demolition of cement concrete (unreinforced) in ground floors of any description (below or above ground level) complete all as specified and directed. | 2 | Cum | - | - |
| - | Taking down cement plaster of any thickness and description on brick/concrete/stone walls, ceilings, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. | 100 | Sqm | - | - |
| - | Taking down plastering on lathing (other than wire-netting), without removing lathing, in cement mortar (one side only measured in cases where both sides are plastered complete all as specified and directed. | 95 | Sqm | - | - |
| - | Demolition of brickwork or stone/ boulder masonry, built in cement mortar complete all as specified and directed. | 0.3 | Cum | - | - |
| - | Dismantling wooden weather boarding of any description fixed in any position with nails/ screws complete all as specified and directed. | 18 | Sqm | - | - |
| - | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish offt the premises complete all as specified and directed. | 65 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_871631.xls
BOQ • 10.87 MB
TENDER1.pdf
Tender Documents • 1.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .