| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance DHOBANI P O ALAKUSHA CHAS BOKARO | BOKARO | JHARKHAND | 825102 | ₹2.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.2 Cr+₹5.0 L (2.30%)Rejected-Finance DHANBAD MUNICIPAL CORPORATION DHANBAD | ₹2.2 Cr+₹5.0 L (2.30%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.2 Cr+₹5.3 L (2.42%)Rejected-Finance | ₹2.2 Cr+₹5.3 L (2.42%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.3 Cr+₹8.2 L (3.75%)Rejected-Finance 00 BILAUTI BILAUTI SHAHPUR BHOJPUR BHOJPUR BIHAR 802154 | BHOJPUR | BIHAR | 802154 | ₹2.3 Cr+₹8.2 L (3.75%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.3 Cr+₹11.9 L (5.42%)Rejected-Finance DUGDA BASTI BRAHMAN TOLA DUGDSA COAL WASHERY KARMATAND BOKARO | BOKARO | JHARKHAND | 825102 | ₹2.3 Cr+₹11.9 L (5.42%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | UMESH KUMAR SINGH L2 | M/s Sidhi vinayak construction L6 | LALITA ENTERPRISES L3 | M/s B.D.M.S Construction L5 | M/s Subhendu Narayan Shekhar L7 | B.P.ENTERPRISES L1 | M/S JAI MATA DI ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 516.94 | Cum | 120 ₹62,033.16 | 120 ₹62,033.16 | 130 ₹67,202.59 | 150 ₹77,541.45 | 150 ₹77,541.45 | 110 ₹56,863.73 Lowest | 120 ₹62,033.16 |
| 2.00 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 493.81 | Cum | 50 ₹24,690.75 | 45 ₹22,221.68 | 100 ₹49,381.5 | 55 ₹27,159.83 | 55 ₹27,159.83 | 45 ₹22,221.68 | 42 ₹20,740.23 Lowest |
| 3.00 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 36.3 | Cum | 150 ₹5,445.75 | 105 ₹3,812.03 | 100 ₹3,630.5 | 55 ₹1,996.78 | 55 ₹1,996.78 | 45 ₹1,633.73 Lowest | 100 ₹3,630.5 |
| 4.00 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 43.35 | Cum | 500 ₹21,674 | 500 ₹21,674 | 380 ₹16,472.24 Lowest | 590 ₹25,575.32 | 590 ₹25,575.32 | 500 ₹21,674 | 460 ₹19,940.08 |
| 5.00 | Providing designation 75B brick work in C.M (1:6 ) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I. | 43.63 | Cum | 4,100 ₹1,78,903.5 | 4,200 ₹1,83,267 | 300 ₹13,090.5 Lowest | 550 ₹23,999.25 | 550 ₹23,999.25 | 450 ₹19,635.75 | 4,000 ₹1,74,540 |
| 6.00 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 6.6 | Sqm | 715 ₹4,719 | 750 ₹4,950 | 600 ₹3,960 | 5,500 ₹36,300 | 5,500 ₹36,300 | 4,900 ₹32,340 | 550 ₹3,630 Lowest |
| 7.00 | Extra for brick work for each consecutive floor above first floor including watering and scaffolding, all complete as per direction of E/I. | 195.72 | Cum | 180 ₹35,230.5 | 110 ₹21,529.75 | 550 ₹1,07,648.75 | 600 ₹1,17,435 | 600 ₹1,17,435 | 500 ₹97,862.5 | 100 ₹19,572.5 Lowest |
| 8.00 | Providing designation 100 A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9"x4.5"x3") in C.M. (1:6) in foundation and plinth with approved uality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 222.84 | Cum | 3,700 ₹8,24,526.5 | 4,200 ₹9,35,949 | 3,800 ₹8,46,811 | 800 ₹1,78,276 | 800 ₹1,78,276 | 700 ₹1,55,991.5 Lowest | 3,500 ₹7,79,957.5 |
| 9.00 | Providing designation 112mm thick reinforcement designtion 100 A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9"x4.5"x3") in C.M. (1:4) in supertructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including cost of screening materials scaffoliding raking out joints to 15mm depth curing taxesand royalty ( but excluding theb cost of reinforcement) all complete as per building specification and direction of E/I. | 1,191.58 | Sqm | 350 ₹4,17,054.05 Lowest | 475 ₹5,66,001.93 | 500 ₹5,95,791.5 | 650 ₹7,74,528.95 | 700 ₹8,34,108.1 | 700 ₹8,34,108.1 | 440 ₹5,24,296.52 |
| 10.00 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | 37.21 | Cum | 1,100 ₹40,927.7 Lowest | 3,600 ₹1,33,945.2 | 3,800 ₹1,41,386.6 | 4,200 ₹1,56,269.4 | 4,200 ₹1,56,269.4 | 3,600 ₹1,33,945.2 | 3,500 ₹1,30,224.5 |
Tender Value
₹2.9 Cr
EMD Value
₹2.9 L
Closing Date
2 Jun 2026, 11:00 amClosed
E.E., BCD, Building Division, Bokaro
E.E., BCD, Building Division, Bokaro
Proposed Construction of New Hostel Building (100 Bedded) at ITI Bokaro, Chas, Jharkhand
2026_BCD_114433_1
03/2026-27/EE/BCD/BOKARO
Open Tender
Civil Works - Buildings
Works
330 days
Bokaro
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.9 L
6 Jul 2026
23 May 2026
3 Jun 2026
23 May 2026
2 Jun 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 0.2 | Cum | - | - |
| 2 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 1 | Cum | - | - |
| 3 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 1 | Cum | - | - |
| 4 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 1 | Cum | - | - |
| 5 | Providing designation 75B brick work in C.M (1:6 ) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I. | 1 | Cum | - | - |
| 6 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 1 | Sqm | - | - |
| 7 | Extra for brick work for each consecutive floor above first floor including watering and scaffolding, all complete as per direction of E/I. | 1 | Cum | - | - |
| 8 | Providing designation 100 A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9"x4.5"x3") in C.M. (1:6) in foundation and plinth with approved uality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 1 | Cum | - | - |
| 9 | Providing designation 112mm thick reinforcement designtion 100 A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9"x4.5"x3") in C.M. (1:4) in supertructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including cost of screening materials scaffoliding raking out joints to 15mm depth curing taxesand royalty ( but excluding theb cost of reinforcement) all complete as per building specification and direction of E/I. | 0.2 | Sqm | - | - |
| 10Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level. 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
SBD-01.pdf
Tender Documents • 4.87 MB
BOQ_154640.xls
BOQ • 0.36 MB
Corrigendum.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .