Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-Finance MISSION COMPOUND BOLPUR BIRBHUM 731204 | BOLPUR | BIRBHUM | WEST BENGAL | 731204 | L1 | Accepted-Finance Accept | |
| 2 | L2₹3.1 L+₹446.93 (0.14%)Rejected-Finance PAIKAR BIRBHUM | BIRBHUM | WEST BENGAL | L2 | Rejected-Finance Reject | |
| 3 | L3₹3.1 L+₹1,787.70 (0.58%)Rejected-Finance SCHOOL BAGAN BOLPUR BIRBHUM | BOLPUR | BIRBHUM | L3 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
24 Mar 2023, 2:00 pmClosed
ASSISTANT ENGINEER-III, CMD, SURI
OFFICE OF THE ASSISTANT ENGINEER-III, CMD, PHED, GOLMARKET, 1ST FLOOR, SURI, BITBHUM, 731101
Dehydration and Filtration of transformer on Outdoor Sub-station for Pachiara and other water supply scheme under Bolpur Mechanical Division PHE Dte
2023_PHED_492079_1
PHED/20/AE-III/2022-23
Open Tender
MECHANICAL
Item Rate
20 days
Pachiara
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,500
18 Apr 2023
14 Mar 2023
27 Mar 2023
14 Mar 2023
24 Mar 2023
14 Mar 2023
Amount
Carrying charges of the above filter machine from workshop to work site and back after completion of the work including loading and unloading complete the job as per direction of EIC. (i) Dubrajpur W/S Scheme. (ii) Dubrajpur Augmentation W/S Scheme. (iii) Pachiara W/S Scheme. (iv) Rajnagar W/S Scheme. (v) Karidhya W/S Scheme.
Drain out the upto 250 KVA Transformer oil from the tank of the transformer oil after disconnection of H.V power line by isolator as per direction of EIC.
Supply and filling of 50 KV grade tested transformer oil conforming to IS:335/983 in a seal container for toping up of oil in 250 KVA transformer (Approved make)
Supply and fitting fixing of suitable size gasket for tank top cover conservator, bushings, vent, pipe etc.(Approved make)
Supply of silica gel breather. (Approved make)
Dehydration and filtration of transformer oil after connection of both suction and delivery hose pipe with centrifugal type filter machine having capacity not less than 1000 Ltr./hr. to raise the dielectric strength at least 50 KV RMS for 1 minute with earth protection of all electrical accessories as per direction of EIC. Filter machine and breakdown voltage machine to be provided by the agency. Breakdown voltage to be measured during filtration and dehydration after every 1 hour internal with 2.5 mm electrode gap will be not less than 50KV RMS.[Test report must be submitted]
Add: GST @ 18% on sum of Item No: 1 to 6
Add Cess @1% on sum of Item No. 07
SUNIL RABIDAS
S.K. ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .