| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 CrAccepted-AOC | ₹9.8 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹9.9 Cr+₹5.4 L (0.55%)Rejected-Finance 100 FEET ROAD NEAR POWER HOUSE ROAD CHOWK BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹9.9 Cr+₹5.4 L (0.55%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹12.4 Cr+₹2.6 Cr (26.3%)Rejected-Finance | ₹12.4 Cr+₹2.6 Cr (26.3%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹14.2 Cr+₹4.3 Cr (44.3%)Rejected-Finance H NO 282 GREEN CITY II BATHINDA | BATHINDA | PUNJAB | 151001 | ₹14.2 Cr+₹4.3 Cr (44.3%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹16.5 Cr+₹6.7 Cr (68.1%)Rejected-Finance | ₹16.5 Cr+₹6.7 Cr (68.1%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | JB Infrastructure L2 | M/S RAJINDER SINGH L1 | H S Sandhu Builders Pvt Ltd L5 | M/s Azure Infrastructure Construction Co. L4 | M/S VISHVAS BUILDERS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in any type of soil including cutting of grass, roots, bushes if any and all grass/roots removing from site complete all as specified and as directed. | 20,420 | Sqm | 5 ₹1,02,100 Lowest | 15 ₹3,06,300 | 50 ₹10,21,000 | 20 ₹4,08,400 | 10 ₹2,04,200 |
| 2.00 | Rolling consolidation formation surfaces in cutting and filling by exc 8 tonne and not exc 12 tonne power roller complete all as specified and as directed. | 3,190 | 10 Sqm | 100 ₹3,19,000 | 35 ₹1,11,650 Lowest | 80 ₹2,55,200 | 50 ₹1,59,500 | 100 ₹3,19,000 |
| 3.00 | Material and labour for supplying approved earth from outside MOD land (irrespective of any lead) and Forming Embankments incl raising (or lowering) earth, spreading in layers not exceeding 30 cm thick, watering, ramming and finishing to required size, shape not exceeding 1.5 metre high from base complete all as specified and as directed.
Note :- (i) Only consolidated thickness of earth will be measured and paid.
(ii) Qty of earthwork shall be decided by BOO convened by CWE at the time of execution of work as per taking initial and final level after rolling. (iii) Cost for rough excavation, loading, unloading, transportation, spreading, taking levels etc shall deemed to be included in the unit rate quoted , nothing extra shall be paid on this account.
(iv) Consolidated Rolling shall be measured and paid separately under respective item of BOQ) | 12,000 | Cum | 60 ₹7,20,000 Lowest | 320 ₹38,40,000 | 550 ₹66,00,000 | 350 ₹42,00,000 | 442 ₹53,04,000 |
| 4.00 | Dismantling/demolition of complete existing black top surface or bitumen macadam surface in any area exceeding 400 Sqm and depth exceeding 50mm but not exceeding 100mm (average depth 75mm) as per requirement in single pass with suitable cold milling machine fitted with loading convey or for loading the milled material directly on the trucks and stacking where directed complete all as specified and as directed.
Note :- Stacked/milled material removing from site to any lead at contractor site (out side MOD land) after completion of road work or as directed by GE being contractor property (as per credit Sch) cost for the same shall deemed to be included in the quoted unit rate nothing extra shall be paid on this account. | 3,496 | XSqm | 100 ₹3,49,600 Lowest | 500 ₹17,48,000 | 2,000 ₹69,92,000 | 1,000 ₹34,96,000 | 300 ₹10,48,800 |
| 5.00 | Material and labour forLaying and compacting of granular sub base (GSB) as filter-cum-drainage layer, 150mm thick (compacted thickness) by providing grading V material as per Table 400-1 of MORTH specifications for Road and Bridge (Fifth revision published by IRC, 2013 Edition), mixing in a mechanical mix plant at optimum moisture content, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density complete all as specified and as directed. | 4,800 | 10 Sqm | 2,050 ₹98,40,000 Lowest | 2,650 ₹1,27,20,000 | 4,300 ₹2,06,40,000 | 3,500 ₹1,68,00,000 | 3,500 ₹1,68,00,000 |
| 6.00 | Material and labour for laying and compacting 100 mm thick (compacted thickness) Wet Mix Macadam (WMM), grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradien and camber complete all as specified and as directed. | 4,800 | 10 Sqm | 2,020 ₹96,96,000 | 1,650 ₹79,20,000 Lowest | 3,700 ₹1,77,60,000 | 3,000 ₹1,44,00,000 | 2,500 ₹1,20,00,000 |
| 7.00 | Material and labour for laying and compacting 125 mm thick (compacted thickness) Wet Mix Macadam (WMM), grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradien and camber complete all as specified and as directed. | 8,050 | 10 Sqm | 2,400 ₹1,93,20,000 | 1,750 ₹1,40,87,500 Lowest | 4,300 ₹3,46,15,000 | 3,500 ₹2,81,75,000 | 3,125 ₹2,51,56,250 |
| 8.00 | Material & labour for Preparing surfaces of WMM by brushing with wire brushes for removing caked mud etc. sweeping with brooms & finally fanning the cleaned surfaces with air pressure to remove all loose dirt etc. complete all as specified and as directed. | 6,171 | 10 Sqm | 10 ₹61,710 Lowest | 25 ₹1,54,275 | 200 ₹12,34,200 | 100 ₹6,17,100 | 50 ₹3,08,550 |
| 9.00 | Material and labour for applying evenly a prime coat of cationic bitumen emulsion SS1 conforming to IS: 8887 @ 7-10 kg/10 Sqm on surfaces of WMM as specified in Table 500-3 of MORTH specifications for road and bridge works 2013, using mechanical sprayer, complete all as specified and as directed. | 6,171 | 10 Sqm | 280 ₹17,27,880 | 265 ₹16,35,315 | 210 ₹12,95,910 | 200 ₹12,34,200 Lowest | 300 ₹18,51,300 |
| 10.00 | Material & labour for Preparing surfaces of DBM/bituminous surfaces with air pressure to remove all loose dirt etc. from DBM and existing black top surface complete all as specified and as directed. | 6,171 | 10 Sqm | 10 ₹61,710 Lowest | 20 ₹1,23,420 | 110 ₹6,78,810 | 100 ₹6,17,100 | 25 ₹1,54,275 |
Tender Value
₹10.3 Cr
EMD Value
₹8.4 L
Closing Date
16 Aug 2025, 6:00 pmClosed
CE Bathinda Zone
HQ CE Bathinda Zone, Bathinda Mil Stn-151004
PROVN FOR WIDENING OF ROAD AND PROVN OF CONNECTING ROAD AT BATHINDA UNDER GE (P) BATHINDA
2025_MES_719858_1
84523 CE BTZ/BKN/TOKEN-29 OF 2025-26
Open Tender
Civil Works
Item Rate
152 days
Bathinda
As per tender condition
9 documents required · 9 mandatory
₹3,000
GE (P) Bathinda
₹8.4 L
Yes
9 Sept 2025
11 Jul 2025
18 Aug 2025
11 Jul 2025
16 Aug 2025
2 Aug 2025
11 Jul 2025 - 27 Jul 2025
Amount
Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in any type of soil including cutting of grass, roots, bushes if any and all grass/roots removing from site complete all as specified and as directed.
Rolling consolidation formation surfaces in cutting and filling by exc 8 tonne and not exc 12 tonne power roller complete all as specified and as directed.
Material and labour for supplying approved earth from outside MOD land (irrespective of any lead) and Forming Embankments incl raising (or lowering) earth, spreading in layers not exceeding 30 cm thick, watering, ramming and finishing to required size, shape not exceeding 1.5 metre high from base complete all as specified and as directed. Note :- (i) Only consolidated thickness of earth will be measured and paid. (ii) Qty of earthwork shall be decided by BOO convened by CWE at the time of execution of work as per taking initial and final level after rolling. (iii) Cost for rough excavation, loading, unloading, transportation, spreading, taking levels etc shall deemed to be included in the unit rate quoted , nothing extra shall be paid on this account. (iv) Consolidated Rolling shall be measured and paid separately under respective item of BOQ)
Dismantling/demolition of complete existing black top surface or bitumen macadam surface in any area exceeding 400 Sqm and depth exceeding 50mm but not exceeding 100mm (average depth 75mm) as per requirement in single pass with suitable cold milling machine fitted with loading convey or for loading the milled material directly on the trucks and stacking where directed complete all as specified and as directed. Note :- Stacked/milled material removing from site to any lead at contractor site (out side MOD land) after completion of road work or as directed by GE being contractor property (as per credit Sch) cost for the same shall deemed to be included in the quoted unit rate nothing extra shall be paid on this account.
Material and labour forLaying and compacting of granular sub base (GSB) as filter-cum-drainage layer, 150mm thick (compacted thickness) by providing grading V material as per Table 400-1 of MORTH specifications for Road and Bridge (Fifth revision published by IRC, 2013 Edition), mixing in a mechanical mix plant at optimum moisture content, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density complete all as specified and as directed.
Material and labour for laying and compacting 100 mm thick (compacted thickness) Wet Mix Macadam (WMM), grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradien and camber complete all as specified and as directed.
Material and labour for laying and compacting 125 mm thick (compacted thickness) Wet Mix Macadam (WMM), grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradien and camber complete all as specified and as directed.
Material & labour for Preparing surfaces of WMM by brushing with wire brushes for removing caked mud etc. sweeping with brooms & finally fanning the cleaned surfaces with air pressure to remove all loose dirt etc. complete all as specified and as directed.
Material and labour for applying evenly a prime coat of cationic bitumen emulsion SS1 conforming to IS: 8887 @ 7-10 kg/10 Sqm on surfaces of WMM as specified in Table 500-3 of MORTH specifications for road and bridge works 2013, using mechanical sprayer, complete all as specified and as directed.
Material & labour for Preparing surfaces of DBM/bituminous surfaces with air pressure to remove all loose dirt etc. from DBM and existing black top surface complete all as specified and as directed.
Material & labour for applying evenly a tack coat of cationic bitumen emulsion (RS-1) conforming to IS: 8887 @ 3 to 3.5 kg/10 sqm on DBM/bituminous surfaces as specified in Table 500-5 of MORTH specifications for road and bridge works 2013, using mechanical sprayer, complete all as specified and as directed.
Material & labour for providing and laying Dense bituminous macadam of compacted thickness 50mm, using paving bitumen binder of grade VG-30 @ and binder content of 4.5 % by weight of total mix with mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type Hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic sensor paver, rolle d and compacted to required gradient and camber with smooth wheeled, vibratory and tandem roller, complete all as per clause 505 MORTH (5th revision) specification and as directed. Note :- (i) The contractor shall quote the rate against item considering 4.5 % VG-30 bitumen content, Job mix formula as per clause No. 505.3.3 of MORTH ( 5th revision) for BM shall be worked out from any Govt Lab/Govt Engg college/CTL for obtaining optimum binder content (OBC) by the contractor and same shall be submit for approval of Accepting Officer through GE before execution. The cost thereof shall be deemed to be included in quoted unit rate. Any variation in binder content on minus side shall be adjusted @ 50/kg of binder and NO adjustment shall be made on plus side. (ii) The BM shall be covered with top layer/wearing course within a maximum of 48 hours. If there is to be any delay by the contractor, course shall be covered by seal coat to the requirement of clause 512 of MORTH (5th revision) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. (iii) The contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorpoation of the same in the work. (iv) Paver shall not be compulsory in case of patch work using BM. (v) Payment shall be made after conducting bitumen extraction test after every laying every 500 units and cost is deemed to be included in the quoted rates. For any variation in bitumen contents the re-testing to be got done by contractor at without any extra cost. (vi) Repair to pot holes shall be carried out as directed by Engineer-in-charge under this item and not measured separately, cost is deemed to be included in the quoted rates.
Material & labour for laying Premix bituminous concrete 40mm consolidated thickness with 5.4% paving bitumen binder of grade VG-30, content by weight of total mix and crushed aggregates of grading 2 with mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type Hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic sensor paver, rolled and compacted to required gradient and camber with smooth wheeled, vibratory and tandem roller, complete all as per clause 507 MORTH (5th revision) specification and as directed. Note :- (i) The contractor shall quote the rate against item considering 5.4% VG-30 bitumen content, Job mix formula as per clause No. 505.3.3 of MORTH ( 5th revision) for BC shall be worked out from any Govt Lab/Govt Engg college/CTL for obtaining optimum binder content (OBC) by the contractor and same shall be submit for approval of Accepting Officer through GE before execution. The cost thereof shall be deemed to be included in quoted unit rate. Any variation in binder content on minus side shall be adjusted @ Rs 50/kg of binder and NO adjustment shall be made on plus side. (ii) Cost of filler i.e. cement (OPC) is deemed to be included in quoted unit rate. (iii) After spreading of mix as as per clause 507.4.7 MORTH (5th revision) entire surface during the operation shall be rolled with road roller 8-10 tonne (smooth wheeled) followed with vibratory road roller of 8-10 tonne static weight , followed by finished rolling 6 to 8 tonne smooth wheel tendom roller as per clause No 507.4.8 MORTH (5th revision) and cost of the same is deemed to be included in quoted rates. (iii) The contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorpoation of the same in the work. (iv) Payment shall be made after conducting bitumen extraction test after every laying every 500 units and cost is deemed to be included in the quoted rates. For any variation in bitumen contents the re-testing to be got done by contractor at without any extra cost. (v) Top of road surface shall be broomed on next day after completion of rolling and cost of the same is deemed to be included in quoted rates.
Demolition of brick work as in road edging laid dry including removing from the site complete all as specified and as directed by Engineer-in-charge.
Supply and fixing two way (dual direction) reflective road stud ABS body (cat eye) of size 100mmx 100mm x 18.5 mm, with amber/red/yellow reflective panels and fixing on road surface by applying approximately 100 gm Epoxy mixture and placing the cat eye without applying exessive pressure and fixed with zinc plated steel nail of size 8mm dia 120mm long at the centre of cat eye complete all as specified and as directed. Note :- Make shall be approved by Accepting Officer before placement of order
Supply and fixing 600mm long dual directional Delineator made out of MS rectangular pipe of size 68x25mm/75x25mm, 16 gauge duly powder coated and Head made out of ABS plastic rectangular moulded with flat face provided with high intensity prismatic reflector of colour (white/yellow/red) of size 100x125mm with additional two Nos reflective radium strip of size 25mm wide, Delineator shall be fixed/embedding in PCC (1:2:4, type B1) block of size 300x300x350mm including necessary earthwork and form work complete all as specified and as directed. Note :- Make shall be approved by Accepting Officer before placement of order.
Material and labour for preparing bituminous new surfaces of road and marking thermo plastic reflective paint 2mm thick as in centre lines, side lines, stop lines, dashes, arrows etc. and the like (in any colour as directed like white, golden, yellow, orange black etc.) on road surface to be carried out mechanically with hot application of material (painting material @ 5kg/Sqm and glass beads @ 250gm/Sqm conforming to MORTH clause No 803-4) complete all as specified and as directed.
Supply and fixing convex mirror of 800 mm dia made from long life poly carbonate with strong impact resistant and shatter proof fitted with a sun shield or protective hood of colour as approved by GE, provided with 60mm dia SS pipe (1.5 m height excluding embedded portion), including embedding in PCC (1:2:4, type B1) block of size 450x450x450mm including necessary earthwork complete all as specified and as directed. Note :- Make shall be approved by Accepting Officer before placement of order
Material and labour for construction and laying kerb stone of size as directed directly on the road construction site with automatic kerb casting machine (kerb/divider making/laying machine, Highway Engineering), using M-25 grade cement concrete laid in position to the required line, level and curvature, kerb stone cast continuous and making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) at a distance as directed, including making drainage opening wherever required, including necessary excavation/earth work and making good disturbed surface complete all as specified and as directed by Engineer-in-Charge.
Supply & laying RCC pipe 300mm dia class NP3 laid and jointed complete including laying pipes level or to falls in trenches etc on concrete bed or directly on hard ground as directed and making joints complete all as specified and as directed. (Note : Excavation, earth work as required the same shall deemed to be included in the unit rate quoted , nothing extra shall be paid on this account.
Material and labour for cement concrete (1:3:6), type C2 using 40mm graded stone aggregate as in bed of drain pipe of size 300mm dia including packing under and haunching against the sides of pipes after they are laid and tested complete all as specified and as directed by Engineer-in- charge.
JB Infrastructure (BID ID -3387926)
M/S VISHVAS BUILDERS (BID ID -3395923)
M/s Azure Infrastructure Construction Co. (BID ID -3388410)
H S Sandhu Builders Pvt Ltd (BID ID -3396057)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_805881.xls
BOQ • 0.29 MB
175430562.pdf
Tender Documents • 0.14 MB
175430564.html
Tender Documents • 0.06 MB
176877457.pdf
Tender Documents • 0.01 MB
TenderDocT29of2526.pdf
Tender Documents • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .