Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-Finance | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.6 L+₹500 (0.32%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹1.6 L+₹1,300 (0.83%)Accepted-Finance | 3 | Accepted-Finance Found Eligible |
Tender Value
₹1.6 L
EMD Value
₹3,150
Closing Date
20 Feb 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair of 40 HP three phase induction motor no.2 at LIS Mukeri and Repair of 50 HP three phase induction motors no.2,strengthening/replacement of suction pipes at LIS Bal
2025_IFC_271986_1
MID/AN/111
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
Mukeri and Bal
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹3,150
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
24 Feb 2025
7 Feb 2025
21 Feb 2025
7 Feb 2025
20 Feb 2025
9 Feb 2025
8 Feb 2025
1 Repair to 40 HP 3 phase induction motor of pumping unit no.02 installed at LIS Mukeri. The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport . Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process.. Assembling of the motor . Shifting the motor back to LIS . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles,transportation charges. 01 Complete Job 2 Strengthening/Replacement of 150 mm dia Suction lines of pumping unit no. 01&02 installed at LIS Bal . The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Strengthening of suction pipes by welding at leaking portions along with the replacement of damaged flanges. The supporting structure for the suction pipes shall be fabricated using M.S angles. Connecting of suction pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. 01 Complete job in all respects. 3 Repair to 50 HP 3 phase induction motor of pumping unit no.02 installed at LIS Bal. The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport . Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process.. Assembling of the motor . Shifting the motor back to LIS . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles,transportation charges. 01 Complete Job
PERFECT ELECTRICAL WORKS (BID ID -2333984)
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS (BID ID -2334321)
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .