Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.3 L+₹7,499.84 (5.88%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹1.3 L+₹7,499.84 (5.88%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.5 L+₹22,000.02 (17.3%)Admitted-Fee/PreQual/Technical/Finance | -0.33% | ₹1.5 L+₹22,000.02 (17.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.5 L+₹22,484.51 (17.6%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹1.5 L+₹22,484.51 (17.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,500
Closing Date
8 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CONSTRUCTION OF CONCRETE LANE FROM MAIN ROAD TO AZIZ MEMORIAL BLOCK VESSU
2026_RDPR_323185_17
ENIT103of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,500
10 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
8 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Engagement of manual labour for site clearance and removing unduations | - | no | - | - |
| 0.0 | providing and laying of dry stome solling/rbm inc. all carriages | 1 | cum | - | - |
| 0.0 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) all work upto plinth level | - | Cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns | - | sqm | - | - |
| 0.0 | carriage of materials by MT | - | - | - | - |
| 0.0 | sand /crushed stoen aggregates for an avg lead of 10kms by mt(sta) | - | cum | - | - |
| 0.0 | Provision for Signboard, Photograph. | - | Job | - | - |
| 0.0 | Unforseen items | - | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_1087103.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .