Tender Value
₹28.0 Cr
EMD Value
₹28.0 L
Closing Date
3 Oct 2026, 5:00 pm
Chief Engineer Buildings and Bridges
O/o of the EIC Rural Works Odisha Bhubaneswar
Construction of H.L. bridge over river IB on Bhagapali to Gangpurgarh road
2026_CERWI_140996_1
Online- 03/2026-27 (Bridges)
National Competitive Bid
Civil Works - Bridges
Percentage
730 days
Sundergarh
2 documents required · 2 mandatory
₹10,000
₹28.0 L
Yes
11 Sept 2026
11 Sept 2026
5 Oct 2026
11 Sept 2026
3 Oct 2026
11 Sept 2026
11 Sept 2026 - 1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of in all kinds of soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and direction of Engineer -in -charge. | 325.87 | cum | 259.6 | ₹84,595.59 |
| 2 | Earthwork in excavation in foundation in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm andlaying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. | 494.44 | cum | 360.15 | ₹1,78,072.57 |
| 3 | Labour of sinking single circular well caission/ cribwell of specified external diameter in all kinds of soil to lines levels & plumb by scooping out from inside the well & below the steining including cost of dredging & plants ,supply & work of pumps, dredgers & compressors, derrick, winches, cranes etc. balling out of water & dredging, removing all materials & obstacles from inside the wells inclusive of hire & running charges of all such machinery including materials & labour charges for providing kentledge loading if necessary & sinking to the required depth by loading with proper designed & preapproved weight & taking precautions adequately against tilting & shifting & dispiosal of the dredged materials away from the wells as per the direction of Engineer-in charge with all leads & lifts in all repects including all incidental charges like temporary sand filling, top pluging of well etc. for safety of the structure during execution as directed by the Enginer-in charge. (Payment will only be made for sinking of the well & other items required for the well sinking operation is only incidental & no payment will be made for such items) A) In all kinds of Soil (upto 10m depth) i) For 7.5m dia abutment wells | 9 | rm | 28,422.79 | ₹2,55,805.11 |
| 4 | ii) For 7.0m dia. pier wells | 14.08 | rm | 25,920.61 | ₹3,64,832.59 |
| 5 | Sinking of R.C.C well sinking in soft rock (Non coring)/ Boulder/ Hard Soil )(wherein SPT>100) to lines levels & plum by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-Charge. i) For 7.5m dia abutment wells | 6 | rm | 1,25,849.05 | ₹7,55,094.3 |
| 6 | ii) For 7.0m dia. pier wells | 23 | rm | 1,09,628.5 | ₹25,21,455.55 |
| 7 | Construction of R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-Charges. i) For 7.5m dia abutment wells | 4.72 | rm | 3,43,960.47 | ₹16,23,493.42 |
| 8 | ii) For 7.0m dia. pier wells | 24.96 | rm | 2,99,627.79 | ₹74,78,709.64 |
| 9 | Construction of R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-Charges. i) For 7.5m dia abutment wells | 1.2 | rm | 6,86,618.59 | ₹8,23,942.31 |
| 10 | ii) For 7.0m dia. pier wells | 6 | rm | 5,98,121.09 | ₹35,88,726.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.04 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_609621.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .