Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹2.0 L+₹6,716.56 (3.53%)Rejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L2 | Rejected-Finance TC Recommendation | |
| 3 | L3₹2.0 L+₹10,834.76 (5.70%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC Recommendation |
Tender Value
₹1.9 L
EMD Value
₹2,400
Closing Date
15 Mar 2024, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Reinforcement, fabrication and fitting of chute over 10 No Tippler Belt for strata bunker in RVIII B1 seam of Shyamsundarpur Colliery under Bankola Area..
2024_ECL_303844_1
ECL/GM/BA/E TENDER/23-24/EnM/386 Dt. 05.03.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹2,400
9 May 2024
5 Mar 2024
16 Mar 2024
5 Mar 2024
15 Mar 2024
5 Mar 2024
5 Mar 2024 - 9 Mar 2024
Amount
Item Description/ Heading
Transportation of MS joist (200 x 100mm) of 6mtr length from surface to No.10 strata bunker in RVIII B1 seam (Through incline manually)
Transportation of 8mm MS plate (5 mtrs x 1.2mtrs) from surface to no.10 strata bunker in RVIII B1 seam (Through incline manually)
Transportation of MS joist (250 x 150mm) of 4mtrs length from surface to no.10 strata bunker in RVIII B1 seam (Through incline manually)
Transportation of welding m/c from LHD section (pit no 3) to strata bunker (pit no-3)
Dismantling of bunker chute by gas cutting the fixing nut-Bolts.
Reinforcement of bunker by Gas cutting, welding and fixing of extra MS joist with the existing structure.
Fabrication of new chute by gas cutting welding etc.
Fitting the new chute to the bunker with additional supper by fixing nut- Bolt, welding etc.
Total impact of GST for the purpose of CTC
BABLU SINHA
SABIR CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .