Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Fee/PreQual/Technical/Finance DHARNIDHAR KA PURA ATRAMPUR PRAYAGRAJ | -0.07% | ₹8.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.5 L+₹338.17 (0.04%)Admitted-Fee/PreQual/Technical/Finance 5 361 AWAS VIKAS MAINPURI | MAINPURI | UTTAR PRADESH | 205001 | -0.03% | ₹8.5 L+₹338.17 (0.04%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.5 L+₹507.25 (0.06%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹8.5 L+₹507.25 (0.06%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.0 L
EMD Value
₹19,960
Closing Date
14 Jul 2026, 12:00 pmClosed
B.D.O. DEOKALI GHAZIPUR
OFFICE B.D.O. DEOKALI GHAZIPUR
DEVKALI BLOCK PARISAR ME SABHAGAR KAKSH KA NIRMAN KARYA
2026_RDUP_1165761_35
376 date 30.06.2026
Open Tender
Civil Works
Percentage
90 days
DEOKALI GHAZIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
B.D.O. DEOKALI GHAZIPUR
₹19,960
Yes
14 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of material as directed by engineer in charge within a distance of 60m si no. 694 | 21.6 | Cum | 845 | ₹18,252 |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by engineer in charge within a distance of 60meter SI No. 692 | 53.39 | Cum | 380 | ₹20,288.2 |
| 3 | Excavation in foundation in ordinary soil i/c lift up to 1.5m and lead 30m i/c all complete | 47.29 | Cum | 130 | ₹6,147.7 |
| 4 | concrete with 4cm gauge brick ballast and fine sand and cement mortar 1:5:10 in foundation i/c all complet of work | 5.82 | Cum | 4,400 | ₹25,608 |
| 5 | RCC work with cement coarse sand and 2cm gauge stone rite in the proportion 1:2:4 i/c all complete work. AS PER si No. 284 | 8.35 | Cum | 8,750 | ₹73,062.5 |
| 6 | RCC work with cement coarse sand and 2cm gauge stone rite in the proportion 1:2:4 i/c all complete work. AS PER si No. 284 | 3.48 | Cum | 8,750 | ₹30,450 |
| 7 | M-150 brick work in 1:6 cement and fine sand mortar in foundation and plinth i/c all compete of work. SI No. 303 | 17.86 | Cum | 5,250 | ₹93,765 |
| 8 | RCC work with cement coarse sand and 2cm gauge stone rite in the proportion 1:2:4 i/c all complete work. AS PER si No. 284 | 2.28 | Cum | 8,750 | ₹19,950 |
| 9 | e/w in cutting or in embankment in ordinary soil excavation to be in the from of regualr pits not exceeding 1/2 meter (20") in depth and earth work in embankment to be in 20 cm (8") layers including ramming and dressing the surface the required levels and slopes. as per SI No No. 253 | 84.37 | Cum | 115 | ₹9,702.55 |
| 10 | RCC work with cement approved coarse sand and 2cm gauge approved stone ballast in the proportion of 1:1.5:3 for RCC T beam and slab exluding its. SI No. 288b | 28.69 | Cum | 10,100 | ₹2,89,769 |
stage.html
html • 0.02 MB
finance_2187060.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_2187060.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .