| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.0 CrAccepted-AOC 33 GURU ILLAM V T PANDIAN NAGAR 4TH STREET KARIAPATTI 626 106 | VIRUDHUNAGAR | TAMIL NADU | 626106 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹67.3 Cr+₹3.2 Cr (5.01%)Rejected-Finance 15A2 1 INTUC 5 SANKARANKOVIL ROAD RAJAPALAYAM TALUK VIRUDHUNAGAR DISTRICT 626 117 | VIRUDHUNAGAR | TAMIL NADU | 626117 | L2 | Rejected-Finance High Quoted | |
| 3 | L2₹67.3 Cr+₹3.2 Cr (5.01%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | MADURAI | TAMIL NADU | 625020 | L2 | Rejected-Finance High Quoted |
Tender Value
₹64.1 Cr
EMD Value
₹32.2 L
Closing Date
7 Feb 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of the Superintending Engineer Highways C and M Tirunelveli AR Line Road Palayamkottai
Widening from Two lane to Four lane and strengthening at Km 53 4 61 8 and 65 4-69 0 of Srivilliputhur Sivakasi Virudhunagar Aruppukottai Thiruchuli Narikudi Parthibanoor road SH42 including Reconstruction of CD works, Widening of CD works, Construct
2026_HWAY_646149_1
T N No. 40 2025-226 HDO Dated 19.01.2026
Open Tender
Civil Works - Highways
Percentage
360 days
Aruppukottai
Average Annual Turnover
Completed Contracts
Minimum quantities of works in 1yr during the last 5yrs
Personnel capabilities
Equipment capabilities
Financial position
Audited balance sheet for the last 5yrs
Litigation history
Bid capacity
9 documents required · 9 mandatory
₹0
₹32.2 L
23 Mar 2026
23 Jan 2026
7 Feb 2026
23 Jan 2026
7 Feb 2026
27 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking 5cm to 10cm old metalled surface and sectioning 1Sqm
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., | - | - | - | - |
| 2 | Road A | 21,178 | Square meter | 23.36 | ₹4,94,718.08 |
| 3 | Earthwork excavation in all classes of soils except hard rock requiring blasting, and depositing on bank with all leads and lifts as per SS20B; including cost of all labour charges, materials, tools, equipment and all incidental charges; including compacting with power roller, watering; including all hire and fuel charges for all tools and plants; removal of other deleterious matter and obstructions; trimming of bottom of excavation; backfilling; clearing up the site and disposal of all surplus materials etc., complete as per standard specification. a) Box cutting for widening portion | - | - | - | - |
| 4 | Road A | 27,447 | Cubic Metre | 131.89 | ₹36,19,984.83 |
| 5 | Road A (Branch road Improvements) | 991.74 | Cubic Metre | 131.89 | ₹1,30,800.59 |
| 6 | Providing compaction of berms using the box cut earth including all hire and fuel charges for power roller for compaction,water sprinkler,including all labour charges for laying spreading, watering etc., complete as directed by the departmental engineers for making up of low berms | - | - | - | - |
| 7 | Road A | 27,447 | Cubic Metre | 28.17 | ₹7,73,181.99 |
| 8 | Providing and laying of gravel including cost and conveyance of the same to worksite from approved quarry, including stacking the same to departmental gauge for pre-measurement; including all labour charges for laying, spreading, including all hire and fuel charges for power roller for compaction, etc., complete and as directed by the departmental engineers for making up of low berms. B) Formation of embankment | - | - | - | - |
| 9 | Road A | 62,210 | Cubic Metre | 519.66 | ₹3,23,28,048.6 |
| 10 | GRANULAR SUB BASE - Grade -V
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
PB.pdf
Tender Documents • 0.97 MB
PQ.pdf
Additional Documents • 0.50 MB
BOQ_774518.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .