| 1 | L1₹28.5 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.5 L+₹1.0 L (3.58%)Rejected-Finance 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L1 | RAJ ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Repairing & rewinding of 300 KVA, 11KV/550v GEC make Power Transformer GEC make Power Transformer at Kendra 02 No Pit Sub-station under Pandaveswar Colliery . (Inclusive of EPF/CMPF) | |||||
| 1.01 | Dismantling of core & widing from transformer tank | 1 | No | 1,000 ₹1,000 Lowest | 1,035.8 ₹1,035.8 |
| 1.02 | Supply of new electrolyte grade copper strips for primary coils | 180 | Kg | 500 ₹90,000 Lowest | 517.9 ₹93,222 |
| 1.03 | Cleaning of copper strips of secondary coils with removal of old insulation | 140 | Kg | 10 ₹1,400 Lowest | 10.36 ₹1,450.12 |
| 1.04 | Re-insulation cost of primary & secondary coils with removal of old insulation(Material Cost) | 320 | Kg | 90 ₹28,800 Lowest | 93.22 ₹29,831.04 |
| 1.05 | Re-insulation cost of primary & secondary coils with removal of old insulation(Labour Cost) | 320 | Kg | 25 ₹8,000 Lowest | 25.9 ₹8,286.4 |
| 1.06 | Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc | 1 | No | 15,000 ₹15,000 Lowest | 15,537 ₹15,537 |
| 1.07 | Re-formation of primary and secondry coils (barrel type). | 320 | Kg | 40 ₹12,800 Lowest | 41.43 ₹13,258.24 |
| 1.08 | Supply of wooden forma for formation of primary and secondary coils(material Cost) | 1 | Set | 2,000 ₹2,000 Lowest | 2,071.6 ₹2,071.6 |
| 1.09 | Supply of wooden forma for formation of primary and secondary coils(Labour Cost) | 1 | Set | 1,000 ₹1,000 Lowest | 1,035.8 ₹1,035.8 |
Tender Value
₹28.5 L
EMD Value
₹35,700
Closing Date
29 Jul 2025, 5:00 pmClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Repairing and rewinding of transformer, TSU, motor, fabrication and erection of 440V OH line, tower lights and supply and fitting of MCCB, Cable Joint of different mines at Pandaveswar Area
2025_ECL_339928_1
GM-PND/EandM/25-26/96/420 dated 16/07/2025
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Pandaveswar Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹35,700
5 Sept 2025
19 Jul 2025
30 Jul 2025
19 Jul 2025
29 Jul 2025
19 Jul 2025
19 Jul 2025 - 22 Jul 2025
Amount
Repairing & rewinding of 300 KVA, 11KV/550v GEC make Power Transformer GEC make Power Transformer at Kendra 02 No Pit Sub-station under Pandaveswar Colliery . (Inclusive of EPF/CMPF)
Dismantling of core & widing from transformer tank
Supply of new electrolyte grade copper strips for primary coils
Cleaning of copper strips of secondary coils with removal of old insulation
Re-insulation cost of primary & secondary coils with removal of old insulation(Material Cost)
Re-insulation cost of primary & secondary coils with removal of old insulation(Labour Cost)
Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc
Re-formation of primary and secondry coils (barrel type).
Supply of wooden forma for formation of primary and secondary coils(material Cost)
Supply of wooden forma for formation of primary and secondary coils(Labour Cost)
Cost of F-Class Varnish
Cost of thiner
Re-assembly of new coil with inter connection with copper blazzing, backing/heating properly to improve (Material Cost)
Re-assembly of new coil with inter connection with copper blazzing, backing/heating properly to improve (Labour Cost)
Repairing of tap changer switch(Material Cost)
Repairing of tap changer switch(Labour Cost)
Testing charge of transformer
Filtration of transformer oil to increase the insulation level up to the required level at site oil capacity 640 ltr
Less old unused copper stripes burnt primary coil
O.H & Profit @10%
Transporting charge
Repaiirng and maintenace of 440V OH Line. (Inclusive of EPF/CMPF)
Dismantling of Rail Pole
Supply & Erection of 08 mtr Long PCC Pole
Transportation of 08 mtr Long PCC pole from store to worksite
Supply & eraction stay set complete with necessary require materials
Supply, fabrication and erection of MS brackets made of MS angel
Supply, fabrication and erection of MS clamp made of MS flat pati
Supply and fitting of shackel insulator with required hardware
Supply of ACSR Rabbit Conductor
Supply and fitting of Nuts, bolts and washer of different size
OH & Profit @10%
Fabrication, erection and installation of 3 nos Tower light at Khottadih OCP. (Inclusive of EPF/CMPF)
Material cost of ladder in 13 mtrs pole (For 3 nos Lighting Towers)
Material cost of top box for light fitting (For 3 nos Lighting Towers)
Cost of fabrication of ladder(For 3 nos Lighting Towers)
Cost of fabriction of top box(For 3 nos Lighting Towers)
Cost of painting double coat with red oxide(For 3 nos Lighting Towers)
Cost of painting double coat with silver coulers(For 3 nos Lighting Towers)
Cost of eraction of 16 mtrs tubuiar pole(For 3 nos Lighting Towers)
Cost of Transportation and handling for fabriction of workshop and transportation at per pole .(For 3 nos Lighting Towers)
Cost of 100w LED flood light 4 nos in each pole (For 3 nos Lighting Towers)
Cost of 50 mtrs of pvc lighting cable (For 3 nos Lighting Towers)
PF @10%(For 3 nos Lighting Towers)
Fabrication, erection and installation of 4 nos Tower light at Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Material cost of ladder in 13 mtrs pole (For 4 nos Lighting Towers)
Material cost of top box for light fitting (For 4 nos Lighting Towers)
Cost of fabrication of ladder(For 4 nos Lighting Towers)
Cost of fabriction of top box(For 4 nos Lighting Towers)
Cost of painting double coat with red oxide(For 4 nos Lighting Towers)
Cost of painting double coat with silver coulers(For 4 nos Lighting Towers)
Cost of eraction of 16 mtrs tubuiar pole(For 4 nos Lighting Towers)
Cost of Transportation and handling for fabriction of workshop and transportation at per pole .(For 4 nos Lighting Towers)
Cost of 100w LED flood light 4 nos in each pole (For 4 nos Lighting Towers)
Cost of 50 mtrs of pvc lighting cable (For 4 nos Lighting Towers)
PF @10%(For 4 nos Lighting Towers)
Fabrication, erection and installation of 6 nos Tower light at Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Material cost of ladder in 13 mtrs pole (For 6 nos Lighting Towers)
Material cost of top box for light fitting (For 6 nos Lighting Towers)
Cost of fabrication of ladder(For 6 nos Lighting Towers)
Cost of fabriction of top box(For 6 nos Lighting Towers)
Cost of painting double coat with red oxide(For 6 nos Lighting Towers)
Cost of painting double coat with silver coulers(For 6 nos Lighting Towers)
Cost of eraction of 16 mtrs tubuiar pole(For 6 nos Lighting Towers)
Cost of Transportation and handling for fabriction of workshop and transportation at per pole .(For 6 nos Lighting Towers)
Cost of 100w LED flood light (For 6 nos Lighting Towers)
Supply and fitting of different size nuts and bolts(For 6 nos Lighting Towers)
Cost of 50 mtrs of pvc lighting cable (For 6 nos Lighting Towers)
PF @10%(For 6 nos Lighting Towers)
Repaiirng and maintenace of 440V, 550v, OH Line. (Inclusive of EPF/CMPF)
Dismantling of pipe pole
Dismantling of Bracket
Dismantling of conductor
Dismantling of GI wire
Dismantling of Pin Insulator
Dismantling of Disc Insulator
Dismantling of Gang Operating switch
Dismantling of cradel Guard
Supply & erection of 08 MTR long PCC pole
Transporting of PCC pole to work site
Fitting of bracket & clamp
Supply & fitting of stay set with require hardware
Fitting of Pin Insulator
Fitting of Disc Insulator
Supply, fabrication and erection MS Bracket made of MS Angel
Supply, fabrication and erection MS clamp made of MS flat
Supply and fitting of polymer Pin Insulator
Supply and fitting of polymer Disc insulator
Supply & Drawing of GI wire
Supply & fitting of cradel guard
Supply & fitting of earth spike
Fitting of Gang Operating switch
Drawing of ACSR Conductor
Supply and fitting of different size nuts, bolts, and washer
Profit @10%
Repairng and rewinding of 315 kva, 3.3kv/415v Lighting Transformer at Dalurbandh Colliery (Inclusive of EPF/CMPF)
Dismantaning of core & winding from transformer tank
Supply of new electrolyte grade copper strips for primary coils
Cleaning of copper strips of secondry coils with removel of old insulation.
Re-insulation cost of primary & secondry coils with removal of old insulation.
Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc.
Re-formation of primary and secondry coils (borral type).
Supply of wooden forma for formation of primary and secondry coils
supply of F-class varnish
supply of thinner
Re-assembly of new coil with inter connetion with copper blazzing , backing /heating properly to improve IR value upto requires level.
Repairing of tap changer switch.
Testing charges of transformer
Filtratation of Transformer oil
Less old unused copper stripes burnt primary coil
O.H & Profit @10%
PF @12.72% on labour Cost
Transportation charge including Loading & Unloading
Repairing & rewinding of 250KVA 3.3KV/550v Iightening Transformer at Dalurbandh Colliery(Inclusive of EPF/CMPF)
Dismantling of core & winding from transformer tank
Cost of new electrolyte grade DPC copper wire for primARY COIL
Cleaning of copper strips of secondary coil for removal of old insulation & re-insulation coat of primary & secondry bare copper strip by double covewr no-mex paper of thickness 2 mile
Cost of HT grade insulating materilas
Cost of wooden forma for formation of primary & secondary coil
Supply & fixing of new tap changer switch complete
Cost of terminal bushing with insulator for secondary side
Supply and fitting of new gasket, missing nuts, bolts & washer
De-carbonizing cleaning & painting etc
De-hydration & filtration of transformer oil
Labour charge nfor complete repairing & rewinding the above transformer
Cost of testing the above transformer
Cost of new transformer tank as per original specification Rs. 20000.00 cost after deduction of old scrap 200kg@Rs. 25/- p. kg = - 5000/-
Less scrap value
OH & Profit @10%
[email protected]% on Labour cost
To & fro transportation, loading & unloading with handling charge
Repairing and rewinding of 315 KVA, 3.3kv/550v TSU at Dalurbandh Colliery. (Inclusive of EPF/CMPF)
Dismantaning of core & winding from transformer tank
Supply of new electrolyte grade copper strips for primary coils
Cleaning of copper strips of secondry coils with removel of old insulation.
Re-insulation cost of primary & secondry coils with removal of old insulation.
Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc.
Re-formation of primary and secondry coils (borral type).
Supply of wooden forma for formation of primary and secondry coils
Supply of F-class varnish
Supply of thinner
Re-assembly of new coil with inter connetion with copper blazzing , backing /heating properly to improve IR value upto requires level.
Repairing of tap changer switch.
Testing charges of transformer
Painting of inner side of transformer by red oxide anti corrosive red oxide (paint & 2coat of metallice paints (Gray )
Less old unused copper stripes burnt primary coil
OH & Profit @10%
Transportation & handling Charges
Repairing & rewinding of 120 HP, 550v, 3ph, 1470 RPM Induction Motor at Chattisgonda Pump house under Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Cost of copper superenamel wire(Part - A - Stator)
Cost of insulation require against copper (25% of copper cost)(Part - A - Stator)
Labour cost fro insulation (20% of copper cost)(Part - A - Stator)
Cost of striping motor damaged copper conductor (20% of copper Cost)(Part - A - Stator)
Cost of winding of motor (20% of copper cost)(Part - A - Stator)
Miscellaneous cost (15% of copper cost)(Part - A - Stator)
Supply & Fitting of Bearing N 319(Part - A - Stator)
Supply & Fitting of Bearing 6318(Part - A - Stator)
less scrap value(Part - A - Stator)
Removal of Rotor Bar From Slot(Part - B - Rotor)
Cost of Electrolyte copper bar (Part - B - Rotor)
Copper bar machning as per slot diamension(Part - B - Rotor)
Inserting new Copper bar into slot(Part - B - Rotor)
Repairing of bearing journal at rotor shaft(Part - B - Rotor)
Cost of repairing of rotor ring and its re-conection(Part - B - Rotor)
Less scrap value(Part - B - Rotor)
OH & Profit @10%
Transportation & handling Charges
Supply and fitting of MCCB at different places of Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Supply and Fitting of 315 Amp, 550v MCCB 4pole
Supply and Fitting of 600 Amp 4 pole 550V MCCB
Supply and Fitting of 800 Amp 4 pole 550V MCCB
Supply and fitting of Heat Shrinking Cable Joint in 09 nos of power supplying pole at Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Supply and Fitting of 11KV grade heat shrinking cable Joint (95 sqmm)
Supply and Fitting of 11KV grade heat shrinking type straight though cable Joint( 95 sqmm)
OH & Profit @ 10%
Total impact of GST for the purpose of CTC
RAJ ENTERPRISE (BID ID -1170697)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .