Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance 130 20 1 BAKHRAHAT ROAD HANSPUKUR GREEN PARK P O JOKA KOLKATA 700104 | 24 PARAGANAS SOUTH | WEST BENGAL | 700104 | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹15.0 L (6.02%)Admitted-Finance | ₹2.6 Cr+₹15.0 L (6.02%) | L2 | Admitted-Finance |
| 3 | L3₹2.8 Cr+₹27.4 L (11.0%)Admitted-Finance 00 ALAHLADPUR MAIRHI CHANDAULI CHANDAULI UTTAR PRADESH 232104 | CHANDAULI | UTTAR PRADESH | 232104 | ₹2.8 Cr+₹27.4 L (11.0%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 Cr+₹75.0 L (30.1%)Admitted-Finance | ₹3.2 Cr+₹75.0 L (30.1%) | L4 | Admitted-Finance |
| 5 | L5₹3.7 Cr+₹1.2 Cr (49.8%)Admitted-Finance PLOT NO 22 2580 A NEAR HIG 98 SAILESHREE VIHAR CHANDRASEKHARPUR BHUBANESWAR BHUBANESHWAR ORISSA 751021 | KHORDHA | ODISHA | 751021 | ₹3.7 Cr+₹1.2 Cr (49.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Swastik Enterprises L3 | WhiteShark Energy Private Limited L5 | Shyama Enterprises L4 | SUNPOWER ENERGY TECHNOLOGIES PVT LTD L1 | THE BUSINESS ENGINEERS INDIA L6 | M/S R.K. Electrical Equipment and Construction L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00150 kWp Grid Connected Solar Power Plant: | |||||||||
| 2.00 | Project Cost for Design, supply, installation & commissioning of 150 kWp Grid connected Solar Power Plant including 5 years Maintenance and Performance Warranty Contract (MPWC) and integration to Grid at New Police Head Quarter Building, Mantripukhri, Imphal East, Manipur. | 1 | Nos | 58,53,000 ₹58,53,000 | 75,61,282 ₹75,61,282 | 67,00,000 ₹67,00,000 | 53,00,000 ₹53,00,000 | 86,92,465 ₹86,92,465 | 52,00,000 ₹52,00,000 Lowest |
| 3.00 | Materials Cost forDesign, supply, installation & commissioning of 150 kWp Grid connected Solar Power Plant including 5 years Maintenance and Performance Warranty Contract (MPWC) and integration to Grid at New Police Head Quarter Building, Mantripukhri, Imphal East, Manipur. @ 70% of Sl. No. 2. | 1 | Nos | 40,97,100 ₹40,97,100 | 52,92,897.4 ₹52,92,897.4 | 46,90,000 ₹46,90,000 | 37,10,000 ₹37,10,000 | 60,84,725.5 ₹60,84,725.5 | 36,40,000 ₹36,40,000 Lowest |
| 4.00 | Installing and Commissioning Cost. @ 15% of Sl. No. 2. | 1 | Nos | 8,77,950 ₹8,77,950 | 11,34,192.3 ₹11,34,192.3 | 10,05,000 ₹10,05,000 | 7,95,000 ₹7,95,000 | 13,03,869.75 ₹13,03,869.75 | 7,80,000 ₹7,80,000 Lowest |
| 5.00 | MPWC Cost for 5 yrs. @ 15% of Sl. No. 2. | 1 | Nos | 8,77,950 ₹8,77,950 | 11,34,192.3 ₹11,34,192.3 | 10,05,000 ₹10,05,000 | 7,95,000 ₹7,95,000 | 13,03,869.75 ₹13,03,869.75 | 7,80,000 ₹7,80,000 Lowest |
| 6.00 | Transformer Cost (200 kVA minimum) | 1 | Nos | 4,25,000 ₹4,25,000 | 10,00,500 ₹10,00,500 | 7,00,000 ₹7,00,000 | 3,50,000 ₹3,50,000 Lowest | 14,33,055 ₹14,33,055 | 9,00,000 ₹9,00,000 |
| 7.00 | GST 12% on Sl. No. 3. | 1 | Nos | 4,91,652 ₹4,91,652 | 6,35,147.69 ₹6,35,147.69 | 5,62,800 ₹5,62,800 | 4,45,200 ₹4,45,200 | 7,30,167.06 ₹7,30,167.06 | 4,36,800 ₹4,36,800 Lowest |
| 8.00 | GST 18% on Sl. No. 4. | 1 | Nos | 1,58,031 ₹1,58,031 | 2,04,154.61 ₹2,04,154.61 | 1,80,900 ₹1,80,900 | 1,43,100 ₹1,43,100 | 2,34,696.56 ₹2,34,696.56 | 1,40,400 ₹1,40,400 Lowest |
| 9.00 | GST 18% on Sl. No. 5. | 1 | Nos | 1,58,031 ₹1,58,031 | 2,04,154.61 ₹2,04,154.61 | 1,80,900 ₹1,80,900 | 1,43,100 ₹1,43,100 | 2,34,696.56 ₹2,34,696.56 | 1,40,400 ₹1,40,400 Lowest |
| 10.00 | GST 18% on Sl No. 6 | 1 | Nos | 76,500 ₹76,500 | 1,80,090 ₹1,80,090 | 1,26,000 ₹1,26,000 | 63,000 ₹63,000 Lowest | 2,57,949.9 ₹2,57,949.9 | 1,62,000 ₹1,62,000 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
6 Aug 2025, 12:00 pmClosed
Director MANIREDA.
2nd Floor, South Block, Secured Office Complex, Near 2nd MR Gate, Imphal-Dimapur Road, Imphal-795001
Design, manufacture, supply, installation and commissioning including integration to Grid of 150 kWp Grid Connected Solar Power Plant.
2025_MNRE_2837_1
MANIREDA/SPP/RTS/NPHQ/2024-25
Open Tender
Miscellaneous Works
Turn-key
180 days
As Per Tender Document
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
A/c No. 504210110009560
₹1.6 L
Yes
11 Aug 2025
18 Jul 2025
6 Aug 2025
18 Jul 2025
6 Aug 2025
18 Jul 2025
Amount
150 kWp Grid Connected Solar Power Plant:
Project Cost for Design, supply, installation & commissioning of 150 kWp Grid connected Solar Power Plant including 5 years Maintenance and Performance Warranty Contract (MPWC) and integration to Grid at New Police Head Quarter Building, Mantripukhri, Imphal East, Manipur.
Materials Cost forDesign, supply, installation & commissioning of 150 kWp Grid connected Solar Power Plant including 5 years Maintenance and Performance Warranty Contract (MPWC) and integration to Grid at New Police Head Quarter Building, Mantripukhri, Imphal East, Manipur. @ 70% of Sl. No. 2.
Installing and Commissioning Cost. @ 15% of Sl. No. 2.
MPWC Cost for 5 yrs. @ 15% of Sl. No. 2.
Transformer Cost (200 kVA minimum)
GST 12% on Sl. No. 3.
GST 18% on Sl. No. 4.
GST 18% on Sl. No. 5.
GST 18% on Sl No. 6
Work Order Value to the Firm. Sl. Nos. (2+6+7+8 +9+10)
Labour Cess @1% on Sl. No. 4.
Contingency Charge @3% on Sl. No. 4.
Contingency Charge @3% on Sl. No.5.
Agency Charge @ 11.75% on Sl. No. 4.
Total Cost: Sl. Nos. (11+12+13+14+15)
M/S R.K. Electrical Equipment and Construction (BID ID -9612)
Swastik Enterprises (BID ID -9604)
Shyama Enterprises (BID ID -9608)
WhiteShark Energy Private Limited (BID ID -9586)
THE BUSINESS ENGINEERS INDIA (BID ID -9300)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .