Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹65.6 L |
Tender Value
₹79.7 L
Closing Date
6 Jun 2024, 3:00 pmClosed
DURGAPUR STEEL PLANT
Appointment of Consultant for preparing Feasibility Study Report and Detail Project Report for laying of Railway Track in connection with installation of New CHP Wagon Tippler # 4 of Durgapur Steel Plant
1096
0310400001
STNPE
Purchase
Shimla, Himachal Pradesh
• Not Required
• Not required
8 documents required · 8 mandatory
15 Jul 2024
23 May 2024
6 Jun 2024
23 May 2024
6 Jun 2024
23 May 2024
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
1715845843473_TS CHP TIPPLER TRACK (1).pdf
NIT • 2.07 MB
1716437769644_NIT_Consultant for Rail Track for CHP New WT-4.pdf
NIT • 0.46 MB
TS CHP TIPPLER TRACK (1).pdf
NIT • 2.07 MB
GCC governing works contracts.pdf
NIT • 0.18 MB
SAFETY Code for Contractors.pdf
NIT • 0.35 MB
Revised Penal Provison-R-1-01.01.2020.pdf
NIT • 0.60 MB
OEC Scheme.pdf
NIT • 0.58 MB
NIT_Consultant for Rail Track for CHP New WT-4.pdf
NIT • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .