| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹28.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹28.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹28.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹28.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹28.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹28.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹28.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹28.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹28.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹28.0 L
EMD Value
₹27,995
Closing Date
14 Aug 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, BALASORE
Construction of Approach road and CD works for Model 120 Seated ST girls Hostel Building at Mituani under Khaira Block in the District of Balasore for the year 2025-26- 42/6772
2026_CERWI_137881_1
E-TCN No.04 of 2026-27-59
Open Tender
Civil Works - Buildings
Percentage
60 days
Balasore
2 documents required · 2 mandatory
₹6,000
₹27,995
Yes
22 Aug 2026
3 Aug 2026
17 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
3 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil with all leads and lift including rough dressing breaking clods and leveling bed and epositing the excavated materials away from the working area etc. complete as direction of E.I.C. | - | Cum | 282.9 | - |
| 2 | Providing and filling manually with approved quality of sand in layers not exceeding 150mm thick including all labours, watering required for the work including cost, conveyance,royality and taxes T&P etc. for finished items of works etc. complete as direction of E.I.C. | - | Cum | 1,291.2 | - |
| 3 | Providing cement concrete (1:3:6) mix with 40mm nominal size C.B stone aggregate in foundations upto a depth of 1.50 m. below ground level and upto a height of 1.50m. above ground level / bed level including cost and conveyance of all materials to site complete as direction of E.I.C. | - | Cum | 6,674.6 | - |
| 4 | Construction of Un-reinforced,plain cement concrete pavement over a prepared sub-base with 43 grade cement @ 350 kg /cum coarse and fine aggregate confirming to IS:383,maximum size of coarse aggregate not exceeding 25 mm,mixed in aconcrete mixer of not lessthan .2cum capacity andappropriate batching and mixing plant as per approved mix design,transported to site,laid with a fixed form or slip form paver,spread,compacted and finished in a continous operation etc , curing compound ,finishing to lines and grades as per drawing and as per clause 602 of MoSRT&H Specifications for Road & Bridge works (4th. Revision) (Taking output = 75 Cum)(172.50t)(100x3.75x.20) | - | Cum | 6,238.8 | - |
| 5 | Earth work in hard soil from approved borrow area by mechanical means including loading into & transportation by transport vehicles & unladoing the same on Properly prepared surface including rough dressing & breaking clods etc. all complete. | - | Cum | 297.9 | - |
| 6 | Providing laying R.C.C. Hume pipe NP3 class for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection work, backfilling,concrete and masonry work in head walls and parapets clause 1106 of MORD specification for Rural roads and as per irection of Engineer-in charge. | - | Rm | 8,474.4 | - |
| 7 | Plain cement concrete M-15 grade in Foundation complete as per drawing and technical specification. | - | Cum | 7,675.5 | - |
| 8 | Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification. | - | Cum | 7,831.7 | - |
| 9 | Providing laying R.C.C. Hume pipe NP3 class for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection work, backfilling,concrete and masonry work in head walls and parapets clause 1106 of MORD specification for Rural | - | Rm | 4,222.8 | - |
stage.html
html • 0.11 MB
finance_604588.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 2.21 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_604588.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .