Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC | ₹18.8 L | L1 | Accepted-AOC AS PER APPROVED TCR |
| Sl No | Description | Qty | Unit | GURU PRASAD YADAV L1 |
|---|---|---|---|---|
| 1.00Item description | ||||
| 1.01 | Dismantling and removal of one no. Of old and damaged bunton in the shaft range in 02 shifts | 20 | nos. | 32,160 ₹6.4 L |
| 1.02 | Dismantling and removal of each pair of old and damaged back-stay stud with in the shaft range in 01 shift. | 20 | nos. | 5,400 ₹1.1 L |
| 1.03 | Fabrication of studs for back-stay each pair for the shaft range in 01 shift. | 20 | nos. | 5,400 ₹1.1 L |
| 1.04 | Lowering of the above fabricated stud for back stay in the shaft range to appropriate location and fixing with bunton and the shaft wall in the shaft range in 01 shift. | 20 | nos. | 8,965 ₹1.8 L |
| 1.05 | Lowering of the newly fabricated bunton for placing with proper alignment in 02 shifts. | 20 | nos. | 32,160 ₹6.4 L |
| 1.06 | D.A. | 10 | cylinder | 2,415 ₹24,150 |
| 1.07 | Oxygen | 20 | cylinder | 680 ₹13,600 |
| 1.08 | Welding rod | 20 | Packet | 1,290 ₹25,800 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | nos. | 3,14,145 ₹3.1 L |
Updated dates
Tender Value
₹18.8 L
EMD Value
₹23,500
Closing Date
25 Oct 2025, 1:00 pmClosed
GM SSA
GENERAL MANAGER, SATGRAM SRIPUR AREA
Fabrication and changing of 20 Nos. of newly made bunton in the shaft and removing of old and damaged bunton in the shaft of Pit no 3 JK Nagar colliery
2025_ECL_345373_1
ECL/SSA/GM/EnM/NS/25-26/93 DATE 08.10.25
Open Tender
Miscellaneous Works
120 days
Satgram Sripur area HQ
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,500
27 Dec 2025
11 Oct 2025
27 Oct 2025
11 Oct 2025
25 Oct 2025
11 Oct 2025
11 Oct 2025 - 15 Oct 2025
Amount
Item description
Dismantling and removal of one no. Of old and damaged bunton in the shaft range in 02 shifts
Dismantling and removal of each pair of old and damaged back-stay stud with in the shaft range in 01 shift.
Fabrication of studs for back-stay each pair for the shaft range in 01 shift.
Lowering of the above fabricated stud for back stay in the shaft range to appropriate location and fixing with bunton and the shaft wall in the shaft range in 01 shift.
Lowering of the newly fabricated bunton for placing with proper alignment in 02 shifts.
Oxygen
Welding rod
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 2.07 MB
BOQ_358038.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid