| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC | ₹26.7 L Quoted ₹28.0 L | L1 | Accepted-AOC Being lowest |
| 2 | L2₹29.8 L+₹1.8 L (6.29%)Rejected-Finance | ₹29.8 L+₹1.8 L (6.29%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹30.0 L+₹1.9 L (6.91%)Rejected-Finance | ₹30.0 L+₹1.9 L (6.91%) | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹31.7 L+₹3.6 L (12.9%)Rejected-Finance | ₹31.7 L+₹3.6 L (12.9%) | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹34.7 L+₹6.7 L (23.8%)Rejected-Finance | ₹34.7 L+₹6.7 L (23.8%) | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Balaji Associates L1 | M/S SHRINATH CONTRACTION L3 | M/S OMKAR SINGH YADAV L7 | VARDMAN ENTERPRISES L4 | M/s S.M. Construction L5 | M/S DEVENDRA KUMAR GUPTA L6 | BUILDTECH ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for cleaning of RCC over head tank of the capacities of tank 50000 gallons staging 15M to 21 M height by brooming the side wall /bottom and ceiling dome of tank, removing all fungus ,scales ,dust, sludge etc from inside of the tank and removing the materials to a distance exc 50 M n.exc 100 M washing tank from inside with water and dis-infection chemical such as bleaching powder etc. as directed, applying one coat of white wash on all internal surfaces of the tank, writing date of cleaning, CA No, Name of contractor etc with using synthetic enamel black/white paint, applying one coat of synthetic enamel black paint on all inlet, outlet, washout and overflow pipes including sluice valves complete all as specified & directed. by Engr-in-Charge | 15 | Each Job | 4,000 ₹60,000 | 3,500 ₹52,500 | 7,000 ₹1,05,000 | 3,000 ₹45,000 | 5,000 ₹75,000 | 1,990 ₹29,850 Lowest | 3,500 ₹52,500 |
| 2.00 | All as per item No. 1 above but capacity of tank 25000 gallons. | 1 | Each Job | 4,500 ₹4,500 | 4,200 ₹4,200 | 10,000 ₹10,000 | 3,000 ₹3,000 | 3,000 ₹3,000 | 1,990 ₹1,990 Lowest | 7,000 ₹7,000 |
| 3.00 | All as per item No. 1 above but capacity of tank 100000 gallons. | 13 | Each Job | 6,500 ₹84,500 | 4,500 ₹58,500 | 9,000 ₹1,17,000 | 3,000 ₹39,000 | 6,000 ₹78,000 | 2,290 ₹29,770 Lowest | 5,000 ₹65,000 |
| 4.00 | M&L for cleaning of under ground sump capacity of sump 10000 gallons by removing all fungus, scales, dust, sludge etc from inside the sump and removing the materials to a distance exc 50 M and n. exc 100 M including washing the walls, bottom of the sump with water and dis-infection chemical such as bleaching powder etc, writing date of cleaning , CA No, Name of contractor with using synthetic enamel black/white paint, applying one coat of synthetic enamel black paint on all inlet, outlet and overflow pipes including sluice/ gate valves up to pump complete all as specified & directed. by Engr-in-Charge | 5 | Each Job | 5,500 ₹27,500 | 5,000 ₹25,000 | 9,500 ₹47,500 | 4,000 ₹20,000 | 7,000 ₹35,000 | 2,690 ₹13,450 Lowest | 4,000 ₹20,000 |
| 5.00 | All as per item No.4 above but capacity of sump 20000/25000 gallons. | 5 | Each Job | 6,000 ₹30,000 | 6,000 ₹30,000 | 11,500 ₹57,500 | 5,000 ₹25,000 | 8,000 ₹40,000 | 3,290 ₹16,450 Lowest | 6,000 ₹30,000 |
| 6.00 | All as per item No. 4 above but capacity of sump 50000 to 70000 gallons. | 1 | Each Job | 6,000 ₹6,000 | 6,500 ₹6,500 | 12,100 ₹12,100 | 8,000 ₹8,000 | 10,000 ₹10,000 | 4,990 ₹4,990 Lowest | 5,500 ₹5,500 |
| 7.00 | All as per item No. 4 above but capacity of sump 100000 gallons. | 4 | Each Job | 8,000 ₹32,000 | 8,500 ₹34,000 | 13,500 ₹54,000 | 12,000 ₹48,000 | 12,000 ₹48,000 | 5,790 ₹23,160 Lowest | 6,000 ₹24,000 |
| 8.00 | All as per item No. 4 above but capacity of sump 200000 gallons. | 2 | Each Job | 12,000 ₹24,000 | 20,000 ₹40,000 | 1,600 ₹3,200 Lowest | 14,000 ₹28,000 | 14,000 ₹28,000 | 7,590 ₹15,180 | 6,500 ₹13,000 |
| 9.00 | All as per item No. 4 above but capacity of sump 350000 gallons. | 3 | Each Job | 15,000 ₹45,000 | 20,000 ₹60,000 | 19,500 ₹58,500 | 18,000 ₹54,000 | 15,000 ₹45,000 | 8,590 ₹25,770 | 6,600 ₹19,800 Lowest |
| 10.00 | All as per item No. 4 above but capacity of sump 400000 gallons. | 2 | Each Job | 20,000 ₹40,000 | 21,500 ₹43,000 | 27,500 ₹55,000 | 18,000 ₹36,000 | 1,600 ₹3,200 Lowest | 9,990 ₹19,980 | 6,600 ₹13,200 |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
11 May 2026, 6:00 pmClosed
Maj Dinoop Kumar
GE (W) Agra
CLEANING OF OVERHEAD TANK AND UNDER GROUND SUMP AND MISC MAINT OF INSTALLATIONS UNDER AGE E/M (WEST) OF GE (WEST) AGRA
2026_MES_761154_1
8012/1166/E8
Open Tender
Civil Works
Item Rate
180 days
GE (West) Agra
Please refer tender document
9 documents required · 9 mandatory
₹500
GE (West) Agra
₹80,000
25 Jun 2026
21 Apr 2026
18 May 2026
21 Apr 2026
11 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | M&L for cleaning of RCC over head tank of the capacities of tank 50000 gallons staging 15M to 21 M height by brooming the side wall /bottom and ceiling dome of tank, removing all fungus ,scales ,dust, sludge etc from inside of the tank and removing the materials to a distance exc 50 M n.exc 100 M washing tank from inside with water and dis-infection chemical such as bleaching powder etc. as directed, applying one coat of white wash on all internal surfaces of the tank, writing date of cleaning, CA No, Name of contractor etc with using synthetic enamel black/white paint, applying one coat of synthetic enamel black paint on all inlet, outlet, washout and overflow pipes including sluice valves complete all as specified & directed. by Engr-in-Charge | 15 | Each Job | - | - |
| - | All as per item No. 1 above but capacity of tank 25000 gallons. | 1 | Each Job | - | - |
| - | All as per item No. 1 above but capacity of tank 100000 gallons. | 13 | Each Job | - | - |
| - | M&L for cleaning of under ground sump capacity of sump 10000 gallons by removing all fungus, scales, dust, sludge etc from inside the sump and removing the materials to a distance exc 50 M and n. exc 100 M including washing the walls, bottom of the sump with water and dis-infection chemical such as bleaching powder etc, writing date of cleaning , CA No, Name of contractor with using synthetic enamel black/white paint, applying one coat of synthetic enamel black paint on all inlet, outlet and overflow pipes including sluice/ gate valves up to pump complete all as specified & directed. by Engr-in-Charge | 5 | Each Job | - | - |
| - | All as per item No.4 above but capacity of sump 20000/25000 gallons. | 5 | Each Job | - | - |
| - | All as per item No. 4 above but capacity of sump 50000 to 70000 gallons. | 1 | Each Job | - | - |
| - | All as per item No. 4 above but capacity of sump 100000 gallons. | 4 | Each Job | - | - |
| - | All as per item No. 4 above but capacity of sump 200000 gallons. | 2 | Each Job | - | - |
| - | All as per item No. 4 above but capacity of sump 350000 gallons. | 3 | Each Job | - | - |
| - | All as per item No. 4 above but capacity of sump 400000 gallons. | 2 | Each Job | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tender.pdf
Tender Documents • 0.70 MB
BOQ_852597.xls
BOQ • 4.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .