Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.0 L+₹18,585.90 (3.87%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | UDAYAPPA ENTERPRISES | MSC ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Providing scaffolding using 10cm to 13cm dia casurina posts, the distance between the two rows being 1.60m vertically and spacing of posts being 1.0mtr horizontally and the vertical cross bracings being 3.20mtr with 0.50mtr overlap on either side and providing platform with country wood planks of 40mm thick to ceiling of outfall structure for the entire width in complete form using coir and nails including cost of all materials, lead, lift, labour charges, consumables, complete. | 67 | M2 | 25,460 ₹30,042.8 | 24,522 ₹28,935.96 Lowest |
| 2.00 | Chipping and cleaning the ceiling surface and side walls of outfall structures rate including cost of all labour, lead, lift etc., complete | 337.5 | M2 | 3,375 ₹3,982.5 | 3,037.5 ₹3,584.25 Lowest |
| 3.00 | Providing two final coats of epoxite epoxy seal coat in the ceiling of outfall structure including cost of all materials, labour, lead, lift etc., complete | 229.6 | M2 | 1,81,384 ₹2,14,033.12 | 1,74,725.6 ₹2,06,176.21 Lowest |
| 4.00 | Plastering with CM 1:5, 20 mm thick with Nitobond AR mixed in cement mortar at 250 ml/ bag of cement including cost of all materials labour, lead, lift, curing, etc., complete. | 19.7 | M2 | 12,450.4 ₹14,691.47 | 11,977.6 ₹14,133.57 Lowest |
| 5.00 | Providing two coats of anticorrosive black paint to the plastered surface, rate including cost of all materials, labour, lead, lift etc., complete | 136.5 | M2 | 27,573 ₹32,536.14 | 26,617.5 ₹31,408.65 Lowest |
| 6.00 | Drilling the holes and providing non return brass nipple inside the tunnel rate includes for cost of all material, drilling, hire charges for drilling machine with all lead, lift, labour etc., complete. | 62 | Joints | 13,454 ₹15,875.72 | 12,958 ₹15,290.44 Lowest |
| 7.00 | Pressure grouting of polymer inject grout SS or M/s. Cerachem, rate including cost of materials, labour, hire charges for grouting pump with all lead, lift etc., complete. | 18.6 | Kg | 1,33,492.2 ₹1,57,520.8 | 1,28,600.4 ₹1,51,748.47 Lowest |
| 8.00 | Providing patch up in the inner surface of outfall including cleaning the surface by providing primer coat of epoxy compound and applying 10mm thick epoxite epoxy screeding using quartz sand and epoxy resin and hardener including cost of all materials, labours, leads, lifts, etc., complete. | 43.1 | M2 | 1,01,198.8 ₹1,19,414.58 | 97,362.9 ₹1,14,888.22 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,100
Closing Date
9 Jul 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE TTPS TTN 4
O o SE Civil TTPS TTN 4
Protective Maintenance Works in Hot Water Outfall Structures
2025_EB_572692_1
CE SE C TTPS Spec No.153 25 26
Open Tender
Civil Works - Others
Item Rate
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,100
Yes
11 Nov 2025
23 Jun 2025
10 Jul 2025
23 Jun 2025
9 Jul 2025
23 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .