| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAdmitted-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | ₹5.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 Cr+₹48.1 L (8.40%)Admitted-Finance | ₹6.2 Cr+₹48.1 L (8.40%) | L2 | Admitted-Finance |
| 3 | L3₹6.8 Cr+₹1.1 Cr (19.3%)Admitted-Finance | ₹6.8 Cr+₹1.1 Cr (19.3%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 Cr+₹1.5 Cr (25.6%)Admitted-Finance | ₹7.2 Cr+₹1.5 Cr (25.6%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Anil kumar singh L1 | M/S SHUKLA ENTERPRISES L3 | ARK ENGINEERING L2 | AMIT ENGINEERING CORPORATION L4 |
|---|---|---|---|---|---|---|---|
| 1.00Part A (Materials Provided by contractor) | |||||||
| 1.01 | ST Pole 9 m long | 156 | No | 13,000 ₹20,28,000 Lowest | 14,500 ₹22,62,000 | 14,000 ₹21,84,000 | 14,100 ₹21,99,600 |
| 1.02 | ST Pole 11 m long | 239 | No | 14,500 ₹34,65,500 Lowest | 16,500 ₹39,43,500 | 15,500 ₹37,04,500 | 19,350 ₹46,24,650 |
| 1.03 | ACSR weasel Conductor | 5,000 | Mtr | 27 ₹1,35,000 Lowest | 35 ₹1,75,000 | 30 ₹1,50,000 | 32 ₹1,60,000 |
| 1.04 | ACSR Dog Conductor | 400 | Mtr | 88.5 ₹35,400 Lowest | 115 ₹46,000 | 100 ₹40,000 | 92 ₹36,800 |
| 1.05 | 3x300 mm² ‘XLPE’ cable 33 KV | 10,200 | Mtr | 1,840 ₹1,87,68,000 Lowest | 2,100 ₹2,14,20,000 | 2,000 ₹2,04,00,000 | 2,170 ₹2,21,34,000 |
| 1.06 | 3x185 mm² ‘XLPE’ cable 11 KV | 18,099 | Mtr | 860 ₹1,55,65,140 Lowest | 1,100 ₹1,99,08,900 | 950 ₹1,71,94,050 | 1,100 ₹1,99,08,900 |
| 1.07 | 3x70 mm² ‘XLPE’ cable 11 KV | 440 | Mtr | 590 ₹2,59,600 Lowest | 630 ₹2,77,200 | 600 ₹2,64,000 | 640 ₹2,81,600 |
| 1.08 | 2x10 mm² LT cable | 1,250 | Mtr | 70 ₹87,500 Lowest | 80 ₹1,00,000 | 75 ₹93,750 | 87 ₹1,08,750 |
| 1.09 | 4x16 mm² LT cable | 210 | Mtr | 120 ₹25,200 Lowest | 150 ₹31,500 | 130 ₹27,300 | 140 ₹29,400 |
Tender Value
Refer Docs
EMD Value
₹7.1 L
Closing Date
26 Mar 2024, 4:00 pmClosed
SE EWC Gorakhpur
Srirampuram Colony, Mohaddipur, Gorakhpur.
Shifting of Cable, Pole and Transfromer Shahpur to Padari Bazar Gorakhpur.
2024_PVVNV_919295_1
43/EWC(G)/2023-24
Open Tender
Electrical Works
Turn-key
30 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SE EWC Gorakhpur
₹7.1 L
Yes
1 Apr 2024
19 Mar 2024
27 Mar 2024
19 Mar 2024
26 Mar 2024
19 Mar 2024
Amount
Part A (Materials Provided by contractor)
ST Pole 9 m long
ST Pole 11 m long
ACSR weasel Conductor
ACSR Dog Conductor
3x300 mm² ‘XLPE’ cable 33 KV
3x185 mm² ‘XLPE’ cable 11 KV
3x70 mm² ‘XLPE’ cable 11 KV
2x10 mm² LT cable
4x16 mm² LT cable
3x120+1x95+1x16 mm² LT AB Cable
3.5x240 mm² LT Cable
3.5x70 mm² LT Cable
1x240 mm² LT Cable
1x400 mm² LT Cable
3.5x150 mm² LT Cable
33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor
33 KV ‘XLPE’ C/J Kit 3x300 mm² St. through
11 KV ‘XLPE’ C/J Kit 3x185mm² Outdoor
11 KV ‘XLPE’ C/J Kit 3x185mm² St. Through
11 KV ‘XLPE’ C/J Kit 3x70 mm² Outdoor
11 KV ‘XLPE’ C/J Kit 3x70 mm² St. Through
Number Plate with Clamp
Danger Board with Clamp
Barbed wire
Bolts, Nuts, & Washers
LT Schakle Insulator
MS Earthing Rod 20x2500 mm
GI wire 5 mm
LT AB Cable clamp with nut & bolt
I Hook
I clamp
Suspension clamp
Neutral PRC
Al. Paint
Red oxide Paint
11 KV Polymer Pin Insulator
11 KV Top channel 100x50x2240 mm
11 KV Cross Bracing Angle
11 KV Top channel/Bracing angle clamp with nut bolt for ST Pole with nut bolt by 50x8 mm MS flat Iron make
Extra angle for cable support
Clamp for extra angle support
11 KV Polymer Disc Insulator
11 KV Polymer Disc fitting
PG clamp for weasel
11 KV Stay Rod 16x1800 mm
11 KV Stay clamp for ST Pole with Nut and Bolt by 50x8 mm MS Flat Iron make.
Stay wire 7/10 SWG
Different size al. lug as per requirement
Stud ST pole clamp
New 100 KVA T/F
E bracket for 11 KV
MS channel T-off 125x65x1300 mm
Clamp for T off
11 KV TPMO
LT incoming pannel with metering equipment
Copper L piece 62x225x12 mm (LS)
MS channel Dropper for fuse set 100x50x2028 mm
T/F Base angle 75x75x6x2028 mm
Copper Z clamp
Iron Jaali for T/F safety
Distribution Box (with pearsing connector, A clamp and other require materials)
Holding clamp for TPMO & fuse set and other.
33 KV Al. binding wire
33&11 KV cable hanging clamp for temporary line
33 KV X arm with clamp for temporary line as per site requirement
33 KV Top channel 125X65X3200 mm with clamp
33 KV M.S. Angle Iron 65x65x6mm bracing with clamps
33 KV Top channel with clamp for temporary line as per site requirement
33 KV Polymer Disc Insulator B&S type
33 KV Polymer Disc Fitting
PG clamp for Dog conductor
33 KV Stay Rod (20x1800MM)
33 KV Stay clamp
Stay wire 7/8 SWG
PART - B- WORK
Erection of Single pole structure on 9 mtr ST Pole for LT AB Cable including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (LT clamps with bolt and nut danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete).
Erection of Single pole structure on 11 mtr ST Pole for LT AB Cable including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (LT AB cable clamps with bolt and nut danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete).
Erection of Double pole structure on 9 mtr ST Pole for 11 KV cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 100 x 50 x 2240 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Erection of Double pole structure on 11 mtr ST Pole for 11 KV one side overhead and one side cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 100 x 50 x 2240 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete).
Erection of Single pole as stud pole structure on 11mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for Single circuit (clamps with bolt and nut, Aluminium paint, red oxide paint etc. complete).
Erection of Double pole structure on 11 mtr ST Pole for 33 KV one side O/H and one side cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Erection of Double pole structure on 9 mtr ST Pole for 33 KV only cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories for (M.S. angle iron bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Installation of distribution Box
Labour charges for Hanging of LT AB Cable on new erected pole with LT AB Cable clamp complete with existing AB cable
Laying, spreading, lifting and final sagging of 3 phases 4 wire (5 wire) of ACSRweasel/ Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of Clamp as per requirement in 05 Nos. conductor in parallel.
Laying, spreading, lifting and final sagging of 1 wire of ACSR weasel Conductor in accordance parallel with AB Cable as a neutral wire. fixing of Clamp as per requirement.
Laying/ hanging of LT Cable 2x10 mm2, 4x16 mm2 for consumer supply in the path of line shifting as per site requirement.
Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) in Cable trench (Cable trench constructed by PWD with hanger). with proper laying on cable trey/channel and filling sand if required as per site.
Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size (1.2M depth x1M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand/HDD Method as per site required.
Extra cost for drilling horizontal hole 2 Mtr below the road & inserting 6” dia. HDPE Pipe PN-6 as per RESSPO for passing of 33 KV XLPE cable 3x300 mm² for Road /Pulliya Crossing at different places in the path of Laying of cable. (Complete work with Materials provided by contractor)
Laying of 11 KV 3x70/185 mm² ‘XLPE’ cable(D/C) in Cable trench (Cable trench constructed by PWD with hanger). with proper laying on cable trey/channel and filling sand if required as per site.
Laying of 11 KV 3x70/185 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size (1.2M depth x1M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand/HDD Method as per site required.
Extra cost for drilling horizontal hole 2 Mtr below the road & inserting 6” dia. HDPE Pipe PN-6 as per RESSPO for passing of 11 KV XLPE cable 3x185 mm² for Road /Pulliya Crossing at different places in the path of Laying of cable. (Complete work with Materials provided by contractor)
Laying of LT cable of different size in Cable trench (Cable trench constructed by PWD with hanger) with proper laying on cable trey/channel and filling sand.
Laying of LT cable different size by digging pit & making trench in Proper size (1M depth x0.6M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks / Hanging on poles as per site required. as per site requirement HDD mathod can be used.
Rising of 33 KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work.
Rising of 11 KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work.
Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor & Straight Through.
jointing charges of 11 KV XLPE C/J Kit Outdoor/Straight through.
special Pipe Earthing Complete for Cable jointing Kit with materials provided by contractor.
Disconnection and Reconnection of Existing LT cable connection in the path of Shifting of line as per follwoing details.
L.T. and Domestic Consumer connection cable.
Commercial and Power Consumer Connection cable.
Shifting, loading, Carriage and re-installation of Existing 400/250 kVA T/F From Existing place to Shifted Place with installation related all materials i.e. erection of pole and installation of fitting and equipment. as per site requirement and instruction of supervision authority. (including T/F plinth, installation of iron jaali and earthing)
Providing and installation of New 100 KVA T/F 11/0.4 KV For Avoid Road crossing with installation related all materials i.e. erection of pole and installation of fitting and equipment. as per site requirement and instruction of supervision authority.
Shifting, loading, Carriage and re-installation of Existing 160/100 kVA T/F From Existing place to Shifted Place with installation related all materials i.e. erection of pole and installation of fitting and equipment. as per site requirement and instruction of supervision authority. (include earthing)
Shifting, loading, Carriage and re-installation of Existing 63/25 kVA T/F From Existing place to Shifted Place with installation related all materials i.e. erection of pole and installation of fitting and equipment. as per site requirement and instruction of supervision authority. (include earthing)
Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension.
Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension.
Dismentling charges of existing Single pole on 9 mtr. Long Rail Pole complete.
Dismentling charges of existing Single pole on 9 mtr. Long ST Pole complete.
Dismentling charges of existing Single pole on 11 mtr. Long ST Pole complete.
Dismentling charges of existing Doube pole on 11 mtr. Long ST Pole complete.
Dismentling charges of existing Single pole on 11 mtr. Long Rail Pole complete.
Dismentling charges of existing Double pole on 11 mtr. Long Rail Pole complete.
Dismentling charges of existing Four pole on 11 mtr. Long Rail Pole complete.
Dismentaling of old ACSR DOG conductor and rolling in pieces.
Dismentaling of old ACSR Weasel conductor and rolling in pieces.
Dismentaling of old 11 KV AB Cable scrap rolling in pieces.
Dismentaling of old 33 KV Aluminium Cable scrap rolling in pieces.
Shifting, Loading, Carriage & Unloading of old and damaged 33/11 KV/LT Line materials from work site to Store centre Gorkahpur Distt. Gorakhpur.
Temporary line shifting work
Erection of Single pole on ST Pole 11 Mtr with all fitting.
Hanging of 3x300mm² XLPE 33 KV cable
Hanging of 3x185mm² XLPE 11 KV cable
Hanging of 3x70mm² XLPE 11 KV cable
Cable jointing charges of 33 KV XLPE Cable Outdoor/Straight through.
Cable jointing charges of 11 KV XLPE Cable Outdoor/Straight through.
Dismentling of temporary HT/LT Lines with all materials & fitting, Shifting, Loading Carriage & Unloading of from Work site Store to store centre Gorakhpur at the end of final shifting.
ARK ENGINEERING
M/S SHUKLA ENTERPRISES
AMIT ENGINEERING CORPORATION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .