| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.8 CrAdmitted-Finance | -10.77% | ₹22.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹25.9 Cr+₹3.1 Cr (13.7%)Admitted-Finance | +1.49% | ₹25.9 Cr+₹3.1 Cr (13.7%) | L2 | Admitted-Finance |
| 3 | L3₹26.0 Cr+₹3.2 Cr (14.2%)Admitted-Finance | +1.91% | ₹26.0 Cr+₹3.2 Cr (14.2%) | L3 | Admitted-Finance |
| 4 | L4₹27.0 Cr+₹4.3 Cr (18.7%)Admitted-Finance | +5.94% | ₹27.0 Cr+₹4.3 Cr (18.7%) | L4 | Admitted-Finance |
| 5 | L5₹29.7 Cr+₹6.9 Cr (30.3%)Admitted-Finance | +16.31% | ₹29.7 Cr+₹6.9 Cr (30.3%) | L5 | Admitted-Finance |
Tender Value
₹25.5 Cr
EMD Value
₹51.0 L
Closing Date
15 Apr 2025, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Construction of high level bridge over Dharganga river between Ghatoli to Kelkhoyra road in district Jhalawar
2025_CEPWD_454013_1
ACE PWD ZONE KOTA NITNO-21/2024-25
Open Tender
Civil Works
Percentage
450 days
JHALAWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
20000 EE PWD DIV. AKLERA
₹51.0 L
Yes
ACE PWD ZONE KOTA
28 Apr 2025
24 Mar 2025
17 Apr 2025
24 Mar 2025
15 Apr 2025
24 Mar 2025
4 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layer, ramming, watering and disposal of surplus soil within a lead of 1000 meters, as per drawing and technical Earth in excavation for foundation of specification. [MoRTH Specification : Clause 304]. In ordinary soil [MoRTH Specification : clause 301] BY MECHANICAL MEANS Depth upto 3m | 7,316.62 | Cum | 72 | ₹5,26,796.64 |
| 2 | Earthwork in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layer, ramming, watering and disposal of surplus soil within a lead of 1000 meters, as per drawing and technical Earth in excavation for foundation of specification. [MoRTH Specification : Clause 304]. In Ordinary/Soft rock (not requiring blasting) [MoRTH Specification : Clause 301] BY MECHANICAL MEANS | 776.58 | Cum | 108 | ₹83,870.64 |
| 3 | Earthwork in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layer, ramming, watering and disposal of surplus soil within a lead of 1000 meters, as per drawing and technical Earth in excavation for foundation of specification. [MoRTH Specification : Clause 304]. In Hard Rock [MoRTH Specification : Clause 301, 302, 303]. Requiring Blasting | 517.72 | Cum | 419 | ₹2,16,924.68 |
| 4 | Structural cement concrete (Design Mix) in open foundations, with form work, at any level. Cement concrete for plain/reinforced concrete in open foundations as per drawing and technical specification. [MoRTH Specification : Section 1700 & 1500]. With 20mm nominal size aggregate P.C.C. M-15 grade | 263.55 | Cum | 4,295 | ₹11,31,947.25 |
| 5 | Structural cement concrete (Design Mix) in open foundations, with form work, at any level. Cement concrete for plain/reinforced concrete in open foundations as per drawing and technical specification. [MoRTH Specification : Section 1700 & 1500]. With 20mm nominal size aggregate R.C.C. M-35 grade With Batching Plant, Transit Mixer and Conrete Pump | 2,899.2 | Cum | 4,794 | ₹1,38,98,764.8 |
| 6 | Providing and laying steel reinforcement at any level in foundation complete as per drawing and technical specification. [MoRTH Specification : Section 1600]. HYSD bar reinforcement | 425.21 | Tonne | 88,817 | ₹3,77,65,876.57 |
| 7 | Reinforced cement concrete in pile cap complete at all levels with steel form work etc. as per drawing and technical specification [MoRTH specification : 1100, 1500, 1700] Structural Concrete M-35 grade By using batching plant | 362.88 | Cum | 4,924 | ₹17,86,821.12 |
| 8 | Bored Cast in situ RCC piles excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lead and lift upto 100 mtrs. [MoRTH specification : Section 1100, 1600 & 1700] 1200mm dia pile (excluding reinforcement) Concrete M-35 in R.C.C. (Design mix) | 390 | Mtr. | 11,540 | ₹45,00,600 |
| 9 | Pile Load test on single vertical pile in accordance with IS-2911 (Part-IV) [MoRTH specification : 1100]. Initial and routine load test | 2,400 | Tonne load | 150 | ₹3,60,000 |
| 10 | Pile Load test on single vertical pile in accordance with IS-2911 (Part-IV) [MoRTH specification : 1100]. For lateral load test | 1 | Each pile | 12,000 | ₹12,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_814983.xls
BOQ • 0.32 MB
166637212.pdf
Tender Documents • 1.89 MB
166637213.pdf
Tender Documents • 1.40 MB
166637214.pdf
Tender Documents • 15.65 MB
166637216.html
Tender Documents • 0.07 MB
CERTIFICATE-AKLERA.pdf
Tender Documents • 0.24 MB
POST-QUALIFICATION-02.pdf
Tender Documents • 3.86 MB
RATE-ANALYSIS-AKLERA.rar
Tender Documents • 10.51 MB
TENDER-DOCUMENT-02.pdf
Tender Documents • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .