| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | L1 | Accepted-AOC reject | |
| 2 | L2₹16.6 L+₹626 (0.04%)Accepted-AOC ERODE COIMBATORE 641302 | ERODE | TAMIL NADU | 641302 | L2 | Accepted-AOC aoc |
| Sl No | Description | Qty | Unit | Indhumathi Infra Projects L2 | Vetri constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 114 | M3 | 265 ₹30,210 Lowest | 270 ₹30,780 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 11 | M3 | 5,600 ₹61,600 | 5,541 ₹60,951 Lowest |
| 3.00Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete. | |||||
| 3.01 | A)Footing | 47 | M2 | 500 ₹23,500 | 499 ₹23,453 Lowest |
| 3.02 | B) Plinth beam | 84 | M2 | 525 ₹44,100 Lowest | 536 ₹45,024 |
| 3.03 | C) Columns | 153 | M2 | 1,300 ₹1,98,900 Lowest | 1,329 ₹2,03,337 |
| 4.00 | Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 3,100 | Kg | 100 ₹3,10,000 | 94 ₹2,91,400 Lowest |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-25 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 350Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone sand (M- Sand) but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. | 31 | M3 | 8,600 ₹2,66,600 | 8,599 ₹2,66,569 Lowest |
| 6.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications | 30 | M3 | 7,500 ₹2,25,000 Lowest | 7,640 ₹2,29,200 |
| 7.00 | Supplying and fixing of M.S.grill of approved design for doors. Windows and ventilators using necessary mild steel flats for inner and outermembers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications. | 2,858 | Kg | 109 ₹3,11,522 Lowest | 110 ₹3,14,380 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
31 Oct 2025, 3:00 pmClosed
Executive Officer
Panchayat Office Street Sulur
15th Finance Million Cities Construction of Compound wall at Ward no.6 SLV Nagar OHT in Sulur Town Panchayat
2025_DTP_617261_1
765/2025
Open Tender
Civil Works
Works
180 days
Sulur Town Panchayat
as per norms
1 document required · 1 mandatory
₹0
₹20,000
17 Nov 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
25 Oct 2025 - 29 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_737652.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .