Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹27.9 L+₹1.1 L (4.04%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | L3₹28.5 L+₹1.7 L (6.19%)Rejected-AOC | L3 | Rejected-AOC Accepted | |
| 4 | L4₹29.3 L+₹2.5 L (9.18%)Rejected-AOC | L4 | Rejected-AOC Accepted |
Tender Value
₹33 L
EMD Value
₹66,000
Closing Date
12 Nov 2018, 11:00 amClosed
EE MGCCD-7
EE MGCCD-7 Bijnor
Constraction of canal from km 8.400 to km 8.440 and V.R.B. at km 8.425 of panwasa Dy
2018_UPIDC_269394_4
01/EE/2018-19
Open Tender
Civil Works - Canal
Item Wise
90 days
Panwasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
EE MGCCD-7
₹66,000
Yes
14 Jan 2020
2 Nov 2018
12 Nov 2018
2 Nov 2018
12 Nov 2018
2 Nov 2018
Amount
Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required levels and slopes also including carriage 600 M up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:6:12 including all cost of material, labour , T&P etc. for completion of work .
Cement concrete in 1:3:6 including all cost of material, labour , T&P etc. for completion of work .
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work. Per cum
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work..
For C.C. Work
For R.C.C. Work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work .
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work .
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work.
Supply and laying Tarfelt sheet in two layers on Bed Block including all cost of material, labour and T&P etc. complete.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete. Per No..
Earth work in filling in Ramp and diversion including ramming and dressing the surface to be required level and slope also including carriage 600 M up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Dry brick on edge soling laid dry filling joints including all cost of material, labour and T&P etc. all complete.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete.
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete.
Removal of diversion including 1.50 m lift and up to 100 m lead.
M/S YASHVIR SINGH THEKEDAR
M/S VIPIN KUMAR CONTRACTOR
M/s Virendra Kumar Contractor and Supplier
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .