| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 CrRejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹2.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 CrRejected-Finance | ₹2.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.4 CrRejected-Finance | ₹2.4 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹2.4 CrRejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.4 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L5 | BHAMAR SINGH L1 | VINAY KUMAR SINGH L4 | NIKHIL CONSTRUCTION L2 | S.B. ENTERPRISES L3 | M/S PRATAP NIRMAN SANSTHAN L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc. | 3,696.38 | M3 | 70 ₹2,58,746.6 | 50 ₹1,84,819 | 92 ₹3,40,066.96 | 65 ₹2,40,264.7 | 86 ₹3,17,888.68 | 70 ₹2,58,746.6 |
| 2.00 | Laying LDPE film 200 Micron below in stone lining C.C. foundation including cost of all materials, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 7,305 | M2 | 35 ₹2,55,675 | 35 ₹2,55,675 | 33.5 ₹2,44,717.5 | 22 ₹1,60,710 | 36 ₹2,62,980 | 25 ₹1,82,625 |
| 3.00 | Laying.C.C. 1:3:6 (1 Part O.P.C.Cement 53 Grade,3 Part coarse sand above 2 FM and 3 part 20 mm to 40 mm well graded stone ballast ) in foundation & floor , mixing and compaction by machenical including cost of all materials labours T&P etc.required for proper completion of work as per direction of Engineer-in-charge. | 1,070.06 | M3 | 4,400 ₹47,08,264 | 4,000 ₹42,80,240 | 4,000 ₹42,80,240 | 4,450 ₹47,61,767 | 3,286 ₹35,16,217.16 | 4,200 ₹44,94,252 |
| 4.00 | C.R.S. Masonary with 1:3 (1 Part O.P.C.Cement 53 Grade,3 Part coarse sand above 2 FM and 200 x200x150 mm cut stone all faces are dressed )including cost of all material labour and T&P etc.required for proper completion of work as per direction of Engineer-in-charge. | 2,001.8 | M3 | 4,500 ₹90,08,100 | 4,000 ₹80,07,200 | 4,400 ₹88,07,920 | 4,400 ₹88,07,920 | 4,686 ₹93,80,434.8 | 4,400 ₹88,07,920 |
| 5.00 | Deep struck cement pointing on stone masonary with 1:2 (1 Part O.P.C.Cement 53 Grade,2 Part coarse sand above 2 FM ) including cost of all material labours and T&P etc.required for proper completion of work as per direction of Engineer-in-charge. | 9,957.92 | M2 | 120 ₹11,94,950.4 | 100 ₹9,95,792 | 120 ₹11,94,950.4 | 32 ₹3,18,653.44 | 116 ₹11,55,118.72 | 135 ₹13,44,319.2 |
| 6.00 | Dismantling of old pointing and racking out joint on stone masonry including cost of labour T&P etc.required for proper completion of work as per direction of Engineer-in-charge. | 1,862.29 | M2 | 20 ₹37,245.8 | 25 ₹46,557.25 | 28 ₹52,144.12 | 16 ₹29,796.64 | 26 ₹48,419.54 | 28 ₹52,144.12 |
| 7.00 | Laying C.C. 1:2:4(1 Part O.P.C.Cement 53 Grade,2 Part coarse sand above 2 FM and 4 part 10 mm to 20 mm well graded Dala stone grit ) in bed floor and coaping including cost of all materials, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 759.72 | M3 | 6,500 ₹49,38,180 | 5,400 ₹41,02,488 | 7,355 ₹55,87,740.6 | 6,300 ₹47,86,236 | 6,086 ₹46,23,655.92 | 6,800 ₹51,66,096 |
| 8.00 | Casting and Fixing of R.C.C.Pre cast wheel guard inclding cost of all materials labours T&P etc.required for proper completion of work as per direction of Engineer-in-charge. | 12 | Each | 500 ₹6,000 | 550 ₹6,600 | 680 ₹8,160 | 500 ₹6,000 | 586 ₹7,032 | 600 ₹7,200 |
| 9.00 | Finishing wall Colour Washing in two coats with water proofing cement paint of premium quality such as snowcem,Durocem,Supercem, of required shade on new wall surface over one coat of white cement primer to give an even shade after including curing and cost of all materials labours T&P etc.required for proper completion of work as per direction of Engineer-in-Charge. | 369.74 | M2 | 90 ₹33,276.6 | 110 ₹40,671.4 | 115 ₹42,520.1 | 56 ₹20,705.44 | 86 ₹31,797.64 | 118 ₹43,629.32 |
| 10.00 | Earth work in correcting internal section of canal by hydraulic excavator (Poclain/JCB) in all type of soil mixed including all lead, lift and dressing, etc.required for proper completion of work as per direction of Engineer-in-charge. | 5,492.15 | M3 | 60 ₹3,29,529 | 50 ₹2,74,607.5 | 65 ₹3,56,989.75 | 47 ₹2,58,131.05 | 66 ₹3,62,481.9 | 65 ₹3,56,989.75 |
Tender Value
₹2.9 Cr
EMD Value
₹5.7 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE
SE, IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration of the Meja branch canal from km 0.000 to km 3.800 including its Pucca work and demarcation of canal land.
2026_UPIDC_1113784_2
05/SE/2025-26
Open Tender
Civil Works
540 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.7 L
24 Mar 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
E/W excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc.
Laying LDPE film 200 Micron below in stone lining C.C. foundation including cost of all materials, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Laying.C.C. 1:3:6 (1 Part O.P.C.Cement 53 Grade,3 Part coarse sand above 2 FM and 3 part 20 mm to 40 mm well graded stone ballast ) in foundation & floor , mixing and compaction by machenical including cost of all materials labours T&P etc.required for proper completion of work as per direction of Engineer-in-charge.
C.R.S. Masonary with 1:3 (1 Part O.P.C.Cement 53 Grade,3 Part coarse sand above 2 FM and 200 x200x150 mm cut stone all faces are dressed )including cost of all material labour and T&P etc.required for proper completion of work as per direction of Engineer-in-charge.
Deep struck cement pointing on stone masonary with 1:2 (1 Part O.P.C.Cement 53 Grade,2 Part coarse sand above 2 FM ) including cost of all material labours and T&P etc.required for proper completion of work as per direction of Engineer-in-charge.
Dismantling of old pointing and racking out joint on stone masonry including cost of labour T&P etc.required for proper completion of work as per direction of Engineer-in-charge.
Laying C.C. 1:2:4(1 Part O.P.C.Cement 53 Grade,2 Part coarse sand above 2 FM and 4 part 10 mm to 20 mm well graded Dala stone grit ) in bed floor and coaping including cost of all materials, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
Casting and Fixing of R.C.C.Pre cast wheel guard inclding cost of all materials labours T&P etc.required for proper completion of work as per direction of Engineer-in-charge.
Finishing wall Colour Washing in two coats with water proofing cement paint of premium quality such as snowcem,Durocem,Supercem, of required shade on new wall surface over one coat of white cement primer to give an even shade after including curing and cost of all materials labours T&P etc.required for proper completion of work as per direction of Engineer-in-Charge.
Earth work in correcting internal section of canal by hydraulic excavator (Poclain/JCB) in all type of soil mixed including all lead, lift and dressing, etc.required for proper completion of work as per direction of Engineer-in-charge.
E/W in correcting internal section of canal by pick axe / stone breaker in rocks including all lead and lift as per site requirement and direction of Engineer-in-charge.
Earth work in embankment for restoration of canal section by borrowing earth lead up to 1.000 km in all type of soil mixed including all lift and dressing, etc.required for proper completion of work as per direction of Engineer-in-charge.
Making, Fixing, Painting and writting of Pre-Cast R.C.C. boundry Pillar @ 200 mtr c/c both side of Meja branch including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
DOC_Belan.pdf
Tender Documents • 2.59 MB
BOQ_2063765.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid