| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹69.2 LAccepted-AOC | ₹69.2 L Quoted ₹71.1 L | L2 | Accepted-AOC L1 |
| 2 | L1₹69.2 LRejected-AOC | ₹69.2 L | L1 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualify |
Tender Value
₹72.6 L
EMD Value
₹1.4 L
Closing Date
28 Apr 2026, 3:00 pmClosed
General Manager Zone-3 UPPCL Lucknow
Office of the General Manager Zone-3 UPPCL Lucknow
CONSTRUCTION OF PLACEMENT CELL AT GOVT. I.T.I. SULTANPUR DISTRICT SULTANPUR (U.P.)
2026_UPPRC_1139402_1
08/GM-3/UPPCL/2026-27 DATE-17.04.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Sultanpur
As per bid documents
2 documents required · 2 mandatory
₹11,800
₹1.4 L
Yes
9 Jun 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | CUM | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | CUM | - | - |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | - | CUM | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | CUM | - | - |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | - | - |
| 6 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the coloumn pitswall tench basement excavation top surface if plinth filling junction of wall and floor along the external perimer of binding expansion joints,surrounding of pipes and conduits etc.complete(plinth area of the building at ground floor only shall be measured as per I.S.6313(Part ll 1981) aldrine emulsifiable concrete or any other approved material such as hepthachlor or chlordance will be used.The rate of application of chemical emulsion shall be as follows:-
(1)treatment for masonary & foundation 5 litres per sq.m.
(2)back fill in immediate contract with foundation 7.5 litre per sq.m
(3)treatment of top surface of plinth filling 5 liters per sq.m.
(4)treatment of soil along external parameter of building 7.50 lire per sqm.
(5)Treatment of soil along External Perimeter 5 litres per sqm. (For payment plinth area to be measured as per IS Code). | - | SQM | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | CUM | - | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | CUM | - | - |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | CUM | - | - |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.20 MB
BOQ_2127306.xls
BOQ • 0.64 MB
BID_DOC.pdf
Tender Documents • 14.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].