Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
5 Sept 2026, 11:00 am
EE(BR V)
22 SURYA SEN STREET KOL-12
REPAIRING AND RESTORATION OF FOOTPATH AT B.B.GANGULY ST., TARA CHAND DUTTA ST. AND RABINDRA SARANI, ETC IN WARD NO. 44.
2026_KMC_1038981_1
KMC/EE(C)/Br-V/44/4/26-27/D/2N
Open Tender
CIVIL WORKS
Percentage
60 days
WARD-44
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹6,000
22 Aug 2026
22 Aug 2026
7 Sept 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) | 62.39 | M3 | 89.9 | ₹5,608.86 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019) | 24.96 | %M3 | 1,317.14 | ₹32,875.81 |
| 3 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 249.55 | SQM | 24 | ₹5,989.2 |
| 4 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 18.72 | M3 | 5,672 | ₹1,06,179.84 |
| 5 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with Concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick (ii) Coloured Decorative (12th Corrigenda & addenda dated14.10.2020) | 37.43 | SQM | 875 | ₹32,751.25 |
| 6 | TAKING-OUT AND RE-LAYING OF EXISTING INTERLOCKING PAVER BLOCKS IN FOOT-PATH OR PASSAGE ETC. OVER 20-40MM THICK MEDIUM YELLOW SAND BED WITH TRUE TO LINE, LEVELLING, PROPER COMPACTION WITH VIBRATER ETC. WITH JOINTING WITH KERB / EDGE TO BE MADE WITH CEMENT CONCRETE (1:2:4) ETC. AS PER THE DIRECTION OF THE ENGINEER-IN-CHARGE. INCLUDING COST OF TAKING OUT AND USING 20% NEW SAND AND ALL MATERIALS, LABOUR ETC. COMPLETE. | 298.8 | SQM | 108 | ₹32,270.4 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 139 | MTR | 8.17 | ₹1,135.63 |
| 8 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 69.5 | MTR | 8.17 | ₹567.81 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) | 3.64 | M3 | 4,761 | ₹17,344.19 |
| 10 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 69.5 | MTR | 21.34 | ₹1,483.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.82 MB
BOQ_2551968.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].