| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.5 LAccepted-AOC KILKRISHNAPURAM THIPPASAMUTHIRAM POST PALLIKONDA VIA VELLORE DISTRICT 635 809 | VELLORE | TAMIL NADU | 635809 | L1 | Accepted-AOC L1 quoted less than tender value | |
| 2 | L2₹78.0 L+₹1.5 L (1.94%)Rejected-AOC | L2 | Rejected-AOC L1 quoted less than tender value |
| Sl No | Description | Qty | Unit | Thiru.K.Babu L1 | Thirumalai Construction L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the Road A.P.Road to Nagarajankottai Road in RAMANAYANIKUPPAM Panchayat (R - 420) Km 0/0 - 0/700 at Anaicut Block | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete | 1,008 | sqm | 6.36 ₹6,410.88 Lowest | 6.48 ₹6,531.84 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete | 700 | sqm | 23.35 ₹16,345 Lowest | 23.8 ₹16,660 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 126 | cum | 339.64 ₹42,794.64 Lowest | 346.23 ₹43,624.98 |
| 5.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 189 | cum | 140.28 ₹26,512.92 Lowest | 143 ₹27,027 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | 262.5 | cum | 2,650.68 ₹6,95,803.5 Lowest | 2,702.13 ₹7,09,309.13 |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete | 2,100 | sqm | 84.8 ₹1,78,080 Lowest | 86.44 ₹1,81,524 |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete | 2,100 | sqm | 19.62 ₹41,202 Lowest | 20 ₹42,000 |
| 9.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 52.5 | cum | 11,562.96 ₹6,07,055.4 Lowest | 11,787.39 ₹6,18,837.98 |
| 10.00 | Providing and fixing sign board | 4 | nos | 4,996.5 ₹19,986 Lowest | 5,093.48 ₹20,373.92 |
Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
8 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director,DRDA Vellore.
The Project Director,DRDA Vellore.
Vellore District Strengthening of 4 roads in Anaicut Block under MGSMT phase III 2025-26 scheme, package no 05
2025_RDTN_593971_1
DIPR/4437/TENDER/2025
Open Tender
Civil Works
Item Rate
180 days
The Project Director, DRDA Vellore.
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹84,000
13 Oct 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
Amount
Strengthening the Road A.P.Road to Nagarajankottai Road in RAMANAYANIKUPPAM Panchayat (R - 420) Km 0/0 - 0/700 at Anaicut Block
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and fixing sign board
Provision for H.M. stone
Road Marker /Road stud with lens Reflector
Strengthening the Road A.P. Road to R.N.Kuppam Road in Ramanayanikuppam Panchayat R -429 Km 0/0 - 0/710 at Anaicut Block
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing CC Pavement
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc complete
Construction of un-reinforced dowel jointed at expansion and Construction joint only plain Cement Concrete pavement thickness as per design over a prepared sub bade with 43grade cement or any other as per Clause 1501.2.2 M30 (Grade) Coarse for etc Complete
Cost and Supply of Bituminous Pad for Expansion joint including all cost and Conveyence etc complete
Providing and fixing sign board
Provision for H.M. stone
Road Marker /Road stud with lens Reflector
Strengthening the Road A.P.Road to Nedumaipalayam in RAMANAYANIKUPPAM Panchayat R - 58 Km 0/0 - 0/480 at Anaicut Block
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and fixing sign board
Provision for H.M. stone
Road Marker /Road stud with lens Reflector
Strengthening the Road A.P.Road to Veerakoil Road in ASANAMPET Panchayat R - 92 Km 0/0 - 0/650 at Anaicut Block
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and fixing sign board
Provision for H.M. stone
Road Marker /Road stud with lens Reflector
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Thirumalai Construction (BID ID -1446525)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .