Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance NEAR GOVT GIRLS SCHOOL VILLAGE DINOD TEHSIL AND DISTRICT BHIWANI 127111 | BHIWANI | BHIWANI | HARYANA | 127111 | -1.41% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹490.48 (0.29%)Admitted-Finance 21 B ARJUN NAGAR AMBALA CANTT | -1.12% | ₹1.7 L+₹490.48 (0.29%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 L+₹2,367.86 (1.42%)Admitted-Finance 139 GOBIND NAGAR AMBALA CANTT | -0.01% | ₹1.7 L+₹2,367.86 (1.42%) | L3 | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
19 Sept 2026, 3:00 pmClosed
Kailash Chander Kala ravi kumar and Vivek Sharma
DIV Ambala
A Mtc of EPHS in Sector 3 Urban Estate Kurukshetra Repair and rising of sewer manhole complete in all respect
2026_HBC_547072_1
2026281738D3 8735 4D25 A5B1 43FFD68FAF94239HSV
Open Tender
Civil Works
Works
30 days
Kurukshetra
2 documents required · 2 mandatory
₹250
₹3,380
Yes
21 Sept 2026
12 Sept 2026
21 Sept 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) | 20.81 | Sqm | 147 | ₹3,059.07 |
| 2 | [21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | 15 | Each | 1,058 | ₹15,870 |
| 3 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 4 | cum | 6,113 | ₹24,452 |
| 4 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 21.7 | Sqm | 208 | ₹4,513.6 |
| 5 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars | 380 | Kg. | 68 | ₹25,840 |
| 6 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 4.79 | cum | 4,128 | ₹19,773.12 |
| 7 | Cleaning of silt from deep manhole with average silt 0.60m to 0.90m and above the silt to be cleared by bucket type sewer cleaning machine including cost of diesel lubricants sewer cleaning machine, operator and disposal of silt malba from the site to suitable place as per the direction of Engineer-in-Charges | 55 | Each | 1,375 | ₹75,625 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_626721.xls
BOQ • 0.33 MB
corringendum18092026.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .