Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
27 Jun 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE SouthTANGEDCO
EE South TANGEDCO
Works Contract for Veerapandi Section of South Division
2023_EB_328475_1
EE/South/WC.009/2023-24
Open Tender
Electrical Works
Works
365 days
Veerapandi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
1 Jul 2023
16 Jun 2023
28 Jun 2023
17 Jun 2023
27 Jun 2023
17 Jun 2023
Amount
Excavation of pole pit upto 27"(8.0 m) Poleby using JCB/ Manual
Excavation of Stay pit 4.5' to 5' depthby using JCB/ Manual
Excavation of pole pit upto 9.14/9.00 Mtr Pole by using JCB/ Manual
Erection of RCC poles/Metal poles upto 8.00m. (27' )by using crane/ Manual
Erection of RCC pole 9.14mtr,PSC pole9.00mtr ( 300kg ) and square pole 9.0mtr by using crane / Manual
Erection of stay set complete
Dismantling of stay set complete
Erection of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Dismantling of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Erection of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 4 1/2
Erection of LT 3 phase cross arms angle and channel
Dismantling of LT 3 phase cross arms angle and channel
Erection of LT Single phase cross arms angle and channel
Dismantling of LT Single phase cross arms angle and channel
Erection of HT/LT TI Fittings
Dismantling of HT/LT TI Fittings
Fixing of HT pin Insulators(22KV)
Dismantling of HT pin Insulators(22KV)
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT Shackle
Dismantling of LT Shackle
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Earthing of pole with pit including burying looping and binding.
Paving of Conductor, stringing, binding Jumpering etc., complete with ACSR for both HT/LT lines - ACSR 7/4.09 mm
Paving of Conductor, stringing, binding Jumpering etc., complete with ACSR for both HT/LT lines - ACSR 7/3.35 mm / AAAC 7/3.15 mm
Dismantling of HT/LT Lines -- ACSR 7/3.35 mm / AAAC 7/3.15 mm
Paving of Conductor, stringing, binding Jumpering etc., complete with ACSR for both HT/LT lines - ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm
Dismantling of HT/LT Lines - ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm
Resagging of ACSR7/2.59mm AAAC2.50 & Weasal and ACSR 7/2.11 mm conductor
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel , belting angle (Except erection of transformer)
Erection of Single Pole Mounted Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel , belting angle (Except erection of transformer)
Erection of DP Structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles.
HT Guarding
Transport of Materials/ conductors and other materials( excluding loading and unloading charges.) - Upto 8 Kms.
Loading of poles upto 27'-0"
Unloading of polesupto 27'-0"
Loading of poles upto 30"
Unloading of poles upto 30"
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual upto 100m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100m
Loading / unloading of Transformer upto 100KVA
Loading / unloading of Transformer upto 200KVA
Loading / unloading of Transformer above 200KVA
Erection of New Transformer
Loading / Unloading of HT Metering set (New)
Erection of HT Metering set
Erection of street light including fixure fittings
Agricultural service fixing / service
Releasing of grills from RCC Poles
Releasing of single phase service and refixing
Releasing of Three phase service and (upto 50 KW)refixing
Mass Concreting including materials (Cement+Sand+/Blue metal and watering)
Earthing of pole with pit including burying looping and binding.
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of Angle
Cutting of other tree branches
Feeder arrangements with open type fuse unit for 2 feeders
Dismantling of PSC/RCC/Metal Pole upto8mts
Dismantling of PSC/RCC/Metal Pole Above 8mts
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .