Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-AOC BALIGADIA PO PS JANKIA DIST KHORDHA | JANKIA | KHORDHA | ODISHA | ₹5.9 Cr | L1 | Accepted-AOC Agreement done |
| 2 | L1₹5.9 CrRejected-Finance | ₹5.9 Cr | L1 | Rejected-Finance Other than lottery bidder |
| 3 | L1₹5.9 CrRejected-Finance PLOT NO 1182 3294 SHANTI VIHAR ITER SQUARE PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA 751030 | BHUBANESWAR | KHORDHA | ODISHA | 751030 | ₹5.9 Cr | L1 | Rejected-Finance Other than lottery bidder |
| 4 | L1₹5.9 CrRejected-Finance | ₹5.9 Cr | L1 | Rejected-Finance Other than lottery bidder |
| 5 | L1₹5.9 CrRejected-Finance | ₹5.9 Cr | L1 | Rejected-Finance Other than lottery bidder |
Tender Value
₹5.9 Cr
EMD Value
₹5.9 L
Closing Date
12 Feb 2026, 5:00 pmClosed
CCE Khordha RandB Circle Khordha
O/o the Chief Construction Engineer Khordha R and B Circle Khordha
Improvement such as widening and strengthening of Road leading from N.H-224 to N.H-5 through New Bus stand Khordha from 0/000 km to 2/397 km (except from 1/680km to 1/720km)
2026_EICCL_125224_1
CCE KHORDHA Rand B CIRCLE 11 2025-26
Open Tender
Civil Works - Roads
Percentage
270 days
Khordha
3 documents required · 3 mandatory
₹10,000
₹5.9 L
Yes
18 Sept 2026
30 Jan 2026
13 Feb 2026
30 Jan 2026
12 Feb 2026
30 Jan 2026
30 Jan 2026 - 12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 2,965.1 | sqm | 8.45 | ₹25,055.09 |
| 2 | Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 36,713 | sqm | 6.03 | ₹2,21,379.39 |
| 3 | Reworking the scarified bituminous surface suitably after supplementing the base materials with sand and compacting finished surface as per approved drawing and technical specifications as per Section 900, Clause 501.8.3.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge. | 36,713 | sqm | 16.95 | ₹6,22,285.35 |
| 4 | Excavation for road way in ordinary rock with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved Drawing & Technical Specifications and as per Clause - 301 of MoSRT&H Specifications for Road & Bridge works (Latest Revision). | 2,447.76 | cum | 74.79 | ₹1,83,067.97 |
| 5 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of frist layer of eanbankment, scarified to a deapth of 150mm, mixed with water at OMC and then compacted by rolling so as to archive minimum dry density as given in table 300-2 for embankment construction as per Clause -305.3.4 of MoRT&H Specificaion for Road & Bridge work (5th Revision) | 750 | cum | 36.05 | ₹27,037.5 |
| 6 | Providing granular sub-base by providing Granular subbase Grading-VI material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works(5th Revision). | 382.5 | cum | 2,037.27 | ₹7,79,255.78 |
| 7 | Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 6,208.69 | cum | 2,366.22 | ₹1,46,91,124.09 |
| 8 | Providing and applying primer coat with medium setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 39,691.26 | sqm | 36.35 | ₹14,42,777.3 |
| 9 | Providing and applying tack coat with medium setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 39,691.26 | sqm | 12.72 | ₹5,04,872.83 |
| 10 | Providing & laying Dence greded Bituminous Macadam (Grading- II) using 60/70 grade Bitumen with Hot Mix Plant,trensported to site laid over the a previousaly prepared surface with paver finisher to the requared grade level and alignment and rolled to archive the desired compaction as per clause 501 and 505 of MoRTH Specification for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 2,183.02 | cum | 8,238.66 | ₹1,79,85,159.55 |
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.73 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_578333.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .