Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -31.00% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 L+₹8,190.95 (4.20%)Admitted-Fee/PreQual/Technical/Finance | -28.10% | ₹2.0 L+₹8,190.95 (4.20%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.2 L+₹24,318.65 (12.5%)Admitted-Fee/PreQual/Technical/Finance | -22.39% | ₹2.2 L+₹24,318.65 (12.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.3 L+₹30,504.23 (15.7%)Admitted-Fee/PreQual/Technical/Finance | -20.20% | ₹2.3 L+₹30,504.23 (15.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.8 L
EMD Value
₹2,824
Closing Date
21 May 2026, 5:00 pmClosed
Superintending Engineer
O/o the S.E, RandB Division, Nayagarh
Repair and Renovation of Forest Check gate to Sai Mandir Road for the year 2026-27 (Such as Existing CC Drain cover slab from 1/197km to 1/258 km)
2026_EICCL_129231_2
eTCN03 of 2026-2027
Open Tender
Civil Works - Roads
Percentage
30 days
Nayagarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹2,824
Yes
29 May 2026
14 May 2026
22 May 2026
14 May 2026
21 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | P.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. | 1 | cum | 6,082.67 | ₹6,076.59 |
| 2 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. | 1 | cum | 6,957.06 | ₹6,950.1 |
| 3 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | 1 | qntl | 9,542.72 | ₹9,533.18 |
| 4 | 12mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | - | cum | 191.69 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_591266.xls
BOQ • 0.32 MB
DTCN0302.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .