| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.9 LRejected-Finance | ₹2.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 LRejected-Finance | ₹3.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹2.9 L
EMD Value
₹2,874
Closing Date
24 Feb 2026, 11:00 amClosed
Upsarpanch and GP Adhikari Gp Kasaba sangaon Kagal
Kasaba Sangaon Tal-Kagal Dist-Kolhapur
Repairs to P.W.S.S At Kasaba Sangaon Tal-Kagal Dist-Kolhapur Kumbhar Colony to Mali Vasahat
2026_KOLHA_1279032_1
E Tender 1/2025-26
Open Tender
Civil Works
120 days
Kasaba Sangaon Tal-Kagal Dist-Kolhapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹2,874
26 Feb 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
Excavation for foundation/pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.
Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M Beyond the area and lifts as below. stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.
Excavation for foundation/pipe trenches in soll rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below. stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling. ete. complete
Excavation for foundation/pipe trenches in hard rock and concrete road by chiselling, wedging. linė drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding back tilling. ete, complete by all means.
Filling in plinth ad floors murum beddig in trenches with approved murum from excavated materials from foundation 15 em, to 20 em. layers including watering ad compaction complete.
Providing and supplying in standard lengths Polyethelene Pipes, confirming to 15 4984/14151 12786/13488 with nesessary jointing material like mechanical connector i, e. thread/ insert joint quick release coupler joint/compression fitting joint or flanged joint excluding coupler/specials. including transportation and freight charges. inspection charges, loading unloading charges. conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by Gl & GOM in all respect etc. complete
Providing & Supply of electro Fusion Fittings in accordance with BS EN12201: Part-3 suitable for drinking water with in black/ blue colour manufactured from compounded PE80 PE100 virgin polymer and compatible with PESO PE100 pipes, in pressure rating SDR11 with min PN12.5 rated for water application and shall be inclusive of all cost such as testing. inspection charges, transportation up to store. transit insurance, loading, unloading, stacking excluding GST levied by GOI & GOM in all respect, ete, complete. Couplers 90
Couplers110
Reducing Tee 110 x 110 x 90 mm
Providing double flange sluice valve confirming for 18- 148-46 including worn gear arrangements as per test pressure, stainless steel spindle, caps. including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect ete. complete. 1 100 mm dia SV PN 1
Lowering. Laying and Jointing 11.D.P.E./ M. D. P. 1. pipes in proper position including all specials by compression fitting/electrofesion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp ete, and all laboprs as directed by engineer in charge as per IS-763-4 Part 1 HOPE 90 mm 4 Kg pipes
Lowering, laying and jointing in position following C.LD F Reflex valves. Butterfly valves and Sluice valves including cost of all labour nointing material, including nut bolts and giving satisfactory hydraulic testing ete, complete. tRate for all class of valves.) including hydraulic testing 100 mm dia SV PN 1
Refilling the trenches with available excavated stull with soft material first over pipe lie and then hard material 1 15 cm. layers with all leads and lifts including consolidation, surcharging, etc. complete.
Add 18 % for GSt Non-Dsr Item Additional Specifications : The work shall be carried out as per the instructions of Engineer in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
SBD.pdf
Tender Documents • 2.19 MB
BOQ_2200421.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid