| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | ₹8.4 L | L1 | Accepted-Finance LESS |
| 2 | L2₹8.4 L+₹8,205.50 (0.98%)Rejected-Finance | ₹8.4 L+₹8,205.50 (0.98%) | L2 | Rejected-Finance MORE |
| Sl No | Description | Qty | Unit | thirumoorthiconstructions L1 | N S P ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all types of soils including ali initial lead and lift etc complete | 102 | M3 | 106 ₹10,811.47 Lowest | 110 ₹11,219.45 |
| 2.00 | Conveyance of excavated earth from site to 15 km far away to permitted low level areas including all cost etc complete | 82 | M3 | 163 ₹13,365.35 Lowest | 170 ₹13,939.32 |
| 3.00 | Providing, laying spreading and compacting Wet Mix Macadam with clean, crushed, graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the engineer. | 68 | M3 | 2,149 ₹1,46,132 Lowest | 2,150 ₹1,46,200 |
| 4.00 | Providing, and laying of prime coat using emulsion bitumen at the rate 7 Kg per 10 Sqm over the WMM surface preparatory to another construction over it. | 678 | M3 | 77 ₹52,206 Lowest | 78 ₹52,884 |
| 5.00 | Providing and laying of tack coat using emulsion bitumen at the rate of 2.5Kg per 10 Sqm over the WMM primed surface | 678 | M2 | 19 ₹12,882 Lowest | 25 ₹16,950 |
| 6.00 | Providing and laying of 50mm compacted bituminous macadam using 0.42m3 of 26.5-11.2mm graded metal and 0.10 m3 of 11.2 to 2.8mm graded metal and 0.18 m3 of 2.8mm and below with 38 kgs of bitumen of grade 80/100 for premixing per 10 m2 including cost and conveyance of all materials to CMP site heating the bitumen and aggregates to required temperature and mixing them in required in central hot mix plant 20-30 tonnes capcity conveying the mix by tipper trucks to power site
spreading the mix in required temperature for uniform thickness of 50mm with mechancial paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire chrages and fuel charges for 20-30 T CMP with two bitumen boiler, tipper trucks, power finisher power rollers and all other tools and plant required including all other incidental charges etc., completed as per specification using cmp clause 504 of MOST specification. | 33.99 | m3 | 10,660 ₹3,62,386.7 Lowest | 10,700 ₹3,63,746.5 |
| 7.00 | Providing and laying Plastic bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.27 kgs of VG30/ VG70 bitumen,5.03 Kg of plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 21 | m3 | 11,350 ₹2,38,293.25 Lowest | 11,400 ₹2,39,343 |
| 8.00Add :- GST @ 18% | |||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
16 Nov 2023, 3:00 pmClosed
The Assistant Commissioner, East Zone
The Assistant Commissioner, East Zone,Coimbatore City Municipal Corporation, Singanallur, Coimbatore 641 005
Providing BT Patches at Irugur Ittery Road in ward no.56 East zone.
2023_MAWS_386834_5
E8/EASTZONE/2023
Open Tender
Civil Works - Roads
Works
90 days
The Assistant Commissioner, East Zone
As per the tender condition attached.
3 documents required · 3 mandatory
₹0
₹10,000
9 May 2026
9 Nov 2023
16 Nov 2023
9 Nov 2023
16 Nov 2023
9 Nov 2023
Amount
Earthwork excavation in all types of soils including ali initial lead and lift etc complete
Conveyance of excavated earth from site to 15 km far away to permitted low level areas including all cost etc complete
Providing, laying spreading and compacting Wet Mix Macadam with clean, crushed, graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the engineer.
Providing, and laying of prime coat using emulsion bitumen at the rate 7 Kg per 10 Sqm over the WMM surface preparatory to another construction over it.
Providing and laying of tack coat using emulsion bitumen at the rate of 2.5Kg per 10 Sqm over the WMM primed surface
Providing and laying of 50mm compacted bituminous macadam using 0.42m3 of 26.5-11.2mm graded metal and 0.10 m3 of 11.2 to 2.8mm graded metal and 0.18 m3 of 2.8mm and below with 38 kgs of bitumen of grade 80/100 for premixing per 10 m2 including cost and conveyance of all materials to CMP site heating the bitumen and aggregates to required temperature and mixing them in required in central hot mix plant 20-30 tonnes capcity conveying the mix by tipper trucks to power site spreading the mix in required temperature for uniform thickness of 50mm with mechancial paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire chrages and fuel charges for 20-30 T CMP with two bitumen boiler, tipper trucks, power finisher power rollers and all other tools and plant required including all other incidental charges etc., completed as per specification using cmp clause 504 of MOST specification.
Providing and laying Plastic bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.27 kgs of VG30/ VG70 bitumen,5.03 Kg of plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Add :- GST @ 18%
N S P ASSOCIATES
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
ITB.pdf
Additional Documents • 0.06 MB
BOQ_461509.xls
BOQ • 0.28 MB
ez-e8-Roads.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .