Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Improvement Works to 90 W Road West side Drain in between 175 S Road to 70 S Road and Providing Culvert in 70 S Road at TTPS
2026_EB_673216_1
CE SE C TTPS Spec.No. 409 25 26
Open Tender
Civil Works - Others
Item Rate
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,400
Yes
11 Mar 2026
11 Mar 2026
27 Mar 2026
11 Mar 2026
26 Mar 2026
11 Mar 2026
Dismantling the existing Brick work/ stone masonry for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete.
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in sand, silt or other loose soil wet sand or silt not under water light block cotton soil sandy loan and ordinary soil including excavated earth.
Providing PCC 1:4:8 cement concrete using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Brick work in CM 1:5 using Class II Bricks including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with CM 1:5, 20mm thick for brick wall surface including cost of all materials, labour, lead, lift, curing etc., complete.
Providing and fixing well point system for dewatering for emptying water from underground storm water drain (or) otherwise as instructed for 2 Nos 10HP vacuum dewatering pumps and a spare pump with 30 filters, operator cost of 3 shifts for 2Nos 10HP and maintenance cost etc., complete.
Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of labours, lead, lift, etc. complete.
R.R Masonry in C.M.1:5 including cost of all materials, labours, lead, lift, curing, etc. complete.
Pointing with C.M 1:5, flush pointing for R.R. Masonry including cost of all materials, labour, lead, lift, curing, etc. complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_809171.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .