Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹20.0 L | L1 | Accepted-Finance AS BSR SO ACEEPTS |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
4 May 2026, 10:00 amClosed
BDO PANCHAYT SAMITI LOONKARANSAR
BDO PANCHAYT SAMTI LOONAKARNSAR
RAJKEYE UCHH MADYMIK VIDHYALEYE DHANI CHIPLAYE ME 02 CLASS ROOM NIRMAN KARYE SABANEYA LUNKARNSAR
2026_PRD_554591_3
22-24DATED23-04-2026PSLKS
Open Tender
Civil Works
Percentage
90 days
SABANEYA
AS TENDER DOCOEMNT
2 documents required · 2 mandatory
₹500
BDO PANCHAYT SAMITI LOONAKRNSAR
₹40,000
Yes
12 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork in foundation excavation up to1.5m, ramming bressing both sides backfilling and dosposal of surplus soil within lead of 50m | - | Cum | 178.46 | - |
| 1.02 | Cement concrete in foundation and plinth with stone ballast size 40 mm including curing and compaction etc in 1:4:8 mix | 9.47 | Cum | 3,629.72 | ₹34,373.45 |
| 1.03 | Brick work in foundation and plinth using brick of class designation 75 in CM 1:6 | - | Cum | 4,346.06 | - |
| 1.04 | DPC with RCC 1:1:5:3 mix | 4.9 | Cum | 5,823.04 | ₹28,532.9 |
| 1.05 | Brick work in Superstructure using brick of class designation 75 in CM 1:6 | 1 | Cum | 4,594.67 | ₹4,590.08 |
| 1.06 | reinforced cement concrete work including curing compaction , finishing with rendering in cement sand martar 1:3 and making goods and joints excluding cost of centering shutiering and reinforcement in 1:1:5:3 | - | Cum | 5,823.04 | - |
| 1.07 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundationand super structure up to 4.5m height aboveplinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786) bars | 1 | Kg | 97.94 | ₹97.84 |
| 1.08 | Centering and shuttering with plywood or steelsheets including strutting, propping, bracingboth ways with wooden members andremoval of from work | - | Sqm | 319.04 | - |
| 1.09 | p&l cement concrete on roof | 1 | Sqm | 861.17 | ₹860.31 |
| 1.1 | Mosaic Tiles on roofing | 1 | Sqm | 848.85 | ₹848 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
22242.pdf
Tender Documents • 7.36 MB
BOQ_987796.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .