Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1 Cr
Closing Date
2 Dec 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
JGM (DC CS)
TCIL Bhawan, GK-1,ND-48
Selection of execution partner for Development (Creation, Upgradation and Operation and Maintenance) of Middle mile network of BharatNet in the States of Meghalaya, Mizoram and Tripura
2026_TCIL_297060_1
TCIL/ITTIV/152/2025/PART-2
Open Tender
OFC Laying Works
EOI
3652 days
New Delhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Payable To
₹1 Cr
Yes
2 Dec 2026
5 Nov 2026
2 Dec 2026
5 Nov 2026
2 Dec 2026
5 Nov 2026
5 Nov 2026 - 6 Nov 2026
120 days
HOTO Details as on date
Sl No State HOTO Scope As per ABP Portal HOTO Completed GPS as per ABP Portal Percentage Achieved till Date
1 Meghalaya 122 122 100%
2 Mizoram 40 40 100%
Note:- HOTO format filled 599 GPs in Tripura. 1 GP permanently closed by State Government and 4 GPs do not have GPON and Optical fiber. Need to remove these 05 GPs from HOTO scope.
DTP DPR as on date
State DTP Scope Target 6th JAN’27 DTP Submitted Approved in ABP Portal Pending with IE to Forward BSNL for Final Approval Pending with BSNL to Update in ABP Portal Balance Blocks to be Submitted
Block GP Block GP Block GP Block GP Block GP Block GP
Note:- 01 block comprises 46 GPs currently on hold due to some GPs falls under municipal area as per State Government. The revised scope needs to be finalized.
Physical Survey & BoQ Progress as on date
State Survey Scope Target 6th Jan’27 Physical Survey Completed BoQ Submitted BoQ Approved in ABP Portal BoQ Pending with IE to Forward BSNL for Final Approval Pending with BSNL to Update in ABP Portal Balance Block to be Submitted
Block GP Block GP Block GP Block GP Block GP Block GP Block GP
Rectification of HOTO completed GPs as on date
STATE HOTO COMPLTETD GPs UP As PER HOTO DATE UP As on DATE Down As on Date DOWN REASONS
Due to OLT Down Due to GPON Faulty Due to RailTel Fiber Due to SSA BSNL Fiber Due to ETR BSNL Fiber Due to BBNL Fiber Others
Status on EB Connections as on date
STATE TOTAL GPs DETAILS & STATUS Remarks
MEGHALAYA 1899 •Demand Note Received for ₹2,18,87,874/- on 22-07-2026 & is being processed for payment. Payment made for 1224 GPS as per the directions of the BSNL BN Head on 21-08-2026. List of 195 GPs provided to MePDCL to install EB meter. Meters Installed at 18 Locations till now.
MIZORAM 771 •Demand Note Received for ₹65,69,690/- on 17-07-2026 & is being processed for payment. Payment made for 269 GPS as per the directions of the BSNL BN Head on 21-08-2026. List of 82 GPs provided to P&E department to install EB meter. Meters Installed at 11 Locations till now.
TRIPURA 1118 •Demand Note Received for ₹45,26,502/- on 01-07-2026 & payment has already been Made. Coordination with DISCOM is underway for facilitating EB connections at BharatNet sites to support timely commissioning and service activation. 05 GP EB connections already established. List of 38 GPs provided to TSECL to install EB meter.
ROW Applied Status (in KMs) as on date
STATE BLOCK COUNT PWD GP ROAD ASIAN HIGHWAY NATIONAL HIGHWAY EB POLES TOTAL KM APPLIED APPROVED
S.No. Item Name Item supplied/to be supplied by PIA UoM Quantity Recomanded date by IE BSNL Approval Date Remarks
Name of OEM Model No.
A NOC IT Components
1 NOC Router Nokia Nokia 7250 IXR-R6d No. 2 07.07.2026 11.08.2026 Not Installed Complete Installation only after delivery of Smart Rack/ Stable Power requirment
2 Core Switch Nokia Nokia 7250 IXR-Xs No. 2 07.07.2026 11.08.2026 Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
3 Access Switch Nokia Nokia 7210 SAS-Sx No. 4 07.07.2026 11.08.2026 Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
4 Aggregation Switch Nokia Nokia 7250 IXR-Xs No. 2 07.07.2026 11.08.2026 Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
5 SAN Storage NetApp AFF A70 Set 1 TTP cert Pending from OEM side Pending 1 out of 2 install on the temporary rack. TTP Certficate Pending from OEM Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
6 SAN Switch Cisco MDS-C9706 No. 2 23.10.2026 Pending Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
7 Secondary Storage (As per requirement, to be assessed by PIA) NetApp FAS 70, SG5812 Set 1 TTP cert Pending from OEM side Pending TTP Certficate Pending from OEM. Equipment not installed. Complete Installation dependent on Smart Rack
8 Blade Chassis/Rack Servers (Including AAA) (As per requirement, to be assessed by PIA) Tyrone Camarero Series Set 1 07.07.2026 29.08.2026 Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
9 Workstation Computers HP HP No. 12 12.08.2026 29.08.2026 Installed and configured.
10 IP Phones STL NEOX- N303 No. 10 Recommended for OEM change from CISCO To STL Pending Pending approval from BSNL. STL testing completed.
11 IPPBX No. 1 12.08.2026 29.08.2026 Installed and configured. Integration in progress. Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
12 Video wall Display, Controller, Video wall Management Software & Accessories Delta DVS 708RS Set 1 16.06.2026 19.08.2026 Installed and working
13 Backup and Archival Solution Veeam Veeam Lot 1 12.08.2026 29.08.2026 Not installed. Complete Installation dependent on Smart Rack and Net APP Seondary Storage
14 NMS/OSS Solution Echleon Edge Echleon Edge NMS Lot 1 16.06.2026 19.08.2026 Installed. Complete Installation dependent on Smart Rack
15 HelpDesk Solution H8 H8-helpdesk Lot 1 15.07.2026 29.08.2026 Installed and integration in progress Complete Installation dependent on Smart Rack
16 End Point Protection Software Trend Micro Trend Micro Apex One Lot 1 16.06.2026 19.08.2026 Not installed. Complete Installation dependent on Smart Rack
17 Cetralized Access Control System Software for AAA Server Advantal Advantal - AAA Lot 1 07.07.2026 29.08.2026 Installed and integration in progress Complete Installation dependent on Smart Rack
18 Firewall (1+1) Palo Alto PA-5430 Lot 1 12.08.2026 29.08.2026 Installed and configured on Temporary Rack Complete Installation dependent on Smart Rack
19 NIPS (1+1) Trend Micro Tipping Point 9200 Tx Lot 1 16.06.2026 19.08.2026 Not installed. Complete Installation dependent on Smart Rack
20 Network color laser printer Canon Canon No. 1 12.08.2026 29.08.2026 Installed and working
B NOC-NON-IT Components
1 Civil works including site preparation and partitioning works , false flooring, false ceiling, etc. Lot. 1 Lot 1 NA NA Completed
2 Electrical works including light fixtures, cabling, panels + earthing etc. No. 7 NA NA Completed
3 Silent DG set with AMF panel and required foundation and civil structure Mahindra M160DR No. 1 01.08.2026 02.09.2026 Installed and working
4 Air conditioning for NOC, UPS, BMS, Meeting, electrical rooms, etc. LG LG No. 14 27.07.2026 29.07.2026 Installed and working
5 40 kVA online UPS (with SNMP) with 60 minutes battery backup and battery enclosure (in 1+1 configuration) Delta DPH 80 Set 1 27.07.2026 29.07.2026 Installed and working
6 Access Control System (RFID + Biometric, smart cards) to manage NOC Matrix ARGO-FACEE No. 4 27.07.2026 29.07.2026 Installed and integration in progress
7 Supply and Installation of Racks (Integrated Air conditioning and climate monitoring system covering entire Racks/suite/Isle/Data Centre only) Vertiv Vertiv Smart Row Set 1 Recommended for OEM change from Delta to Vertiv by IE Pending Recommended by I.E for OEM change from Delta to Vertiv. Approval Pending from BSNL
8 IP camera with intelligent monitoring system including software & internal storage CP Plus CP Plus No. 7 27.07.2026 29.07.2026 Installed and integration in progress
9 70" LED TV Samsung Samsung No. 2 27.07.2026 29.07.2026 Installed and working
10 Structured cabling (OFC and Cat6) Lot 1 NA NA Installed
11 Workstation furniture and fixtures including chairs Lot 1 NA NA Supplied and installed
12 Fire Detection System Agni Agni No. 17 27.07.2026 29.07.2026 Installed and working
SECTION-VI: PRICE BID SCHEDULE
Sr. No. Item Description Unit Est. Unit Cost (excl. tax) (₹) Quantity Total Est. Cost (excl. tax) (₹) CGST Rate SGST Rate Total GST (₹) Total Est. Cost (incl. GST) (₹) HSN / SAC Code Bidder Quoted Premium / Discount (%) Quoted Value / Line Item Total (₹) (Including GST)
1a Supply of 24F OFC, Duct and Accessories including all the services, as described at Serial No.-1 in the Table: VII. (4). RKM ₹398,116.26 5,032 ₹2,003,321,020.32 9.0% 9.0% ₹360,597,783.66 ₹2,363,918,803.98 995423 0.00% ₹2,363,918,803.98
1b Supply of 48F OFC, Duct and Accessories including all the services, as described at Serial No.-2 in the Table: VII. (4). RKM ₹437,928.63 0 ₹0.00 9.0% 9.0% ₹0.00 ₹0.00 995423 0.00% ₹0.00
1c Supply of 24F ADSS OFC and Accessories including all the services (using existing power Poles), as described at Serial No.-3 in the Table: VII. (4). RKM ₹92,641.02 5,296 ₹490,626,841.92 9.0% 9.0% ₹88,312,831.55 ₹578,939,673.47 995423 0.00% ₹578,939,673.47
1d Supply of 24F ADSS OFC and Accessories including all the services (including supply of Poles), as described at Serial No.-4 in the Table: VII. (4). RKM ₹231,533.73 5,295 ₹1,225,971,100.35 9.0% 9.0% ₹220,674,798.06 ₹1,446,645,898.41 995423 0.00% ₹1,446,645,898.41
2 Fibre Distribution Management System Type1 at Block location Nos ₹56,637.00 130 ₹7,362,810.00 9.0% 9.0% ₹1,325,305.80 ₹8,688,115.80 995423 0.00% ₹8,688,115.80
3a IP-MPLS Router at GP location Supply of router at GP locations with accessories including installation, integration, testing and commissioning (as per Section (IV C), Annexure-B, II & III) Nos ₹132,937.92 3,817 ₹507,424,040.64 9.0% 9.0% ₹91,336,327.32 ₹598,760,367.96 995423 0.00% ₹598,760,367.96
3b IP-MPLS Router at Block location Supply of router at Block locations with accessories including installation, integration, testing and commissioning (as per Section (IV C), Annexure-B, II & III) Nos ₹398,813.76 130 ₹51,845,788.80 9.0% 9.0% ₹9,332,241.98 ₹61,178,030.78 995423 0.00% ₹61,178,030.78
6b EMS for Block routers (including H/W, S/W & licenses) No. of per NE ₹1,384.77 65 ₹90,010.05 9.0% 9.0% ₹16,201.81 ₹106,211.86 995423 0.00% ₹106,211.86
6c EMS additional license including H/W and S/W upgradation for GP router No. of NE ₹1,384.77 1,908 ₹2,642,141.16 9.0% 9.0% ₹475,585.41 ₹3,117,726.57 995423 0.00% ₹3,117,726.57
6d EMS additional license including H/W and S/W upgradation for Block router No. of per NE ₹1,384.77 65 ₹90,010.05 9.0% 9.0% ₹16,201.81 ₹106,211.86 995423 0.00% ₹106,211.86
7b Rack at Block locations (as per Section (IV C), Annexure-B, VI) Nos ₹41,543.10 130 ₹5,400,603.00 9.0% 9.0% ₹972,108.54 ₹6,372,711.54 995423 0.00% ₹6,372,711.54
8 Remote Fibre Monitoring System (RFMS) system including necessary hardware and software with accessories including installation, integration, testing and commissioning (as per Section (IV C), Annexure-B, V) Nos ₹900,100.50 130 ₹117,013,065.00 9.0% 9.0% ₹21,062,351.70 ₹138,075,416.70 995423 0.00% ₹138,075,416.70
9b EMS additional license including H/W and S/W upgradation for RFMS No. of RTUs ₹2,077.62 65 ₹135,045.30 9.0% 9.0% ₹24,308.15 ₹159,353.45 995423 0.00% ₹159,353.45
10 State NOC as per details and specification given at Section (IV C), Annexure-B, IV) Nos ₹387,735,600.00 0 ₹0.00 9.0% 9.0% ₹0.00 ₹0.00 995423 0.00% ₹0.00
11a Power System with backup provisions at GP locations with accessories including installation, integration, testing and commissioning with provision of MPPT Card including solar panels (as per Section (IV C), Annexure-B, VIII) Nos ₹110,781.60 1,909 ₹211,482,074.40 9.0% 9.0% ₹38,066,773.39 ₹249,548,847.79 995423 0.00% ₹249,548,847.79
11b Power System with backup provisions at GP locations with accessories including installation, integration, testing and commissioning with provision of slot for MPPT Card BUT excluding MPPT Card & solar panels (as per Section (IV C), Annexure-B, VIII) Nos ₹76,162.35 1,908 ₹145,317,763.80 9.0% 9.0% ₹26,157,197.48 ₹171,474,961.28 995423 0.00% ₹171,474,961.28
11c MPPT solar module of 1 KW (as per sub section VIII of Annexure B of Section IV C) Nos ₹11,078.16 764 ₹8,463,714.24 9.0% 9.0% ₹1,523,468.56 ₹9,987,182.80 995423 0.00% ₹9,987,182.80
12 Supply of 6F Aerial drop OFC including services for last mile connectivity as per TEC GR as described at Serial No. 5 at Table : VII -17 Km ₹34,619.25 13,156 ₹455,450,853.00 9.0% 9.0% ₹81,981,153.54 ₹537,432,006.54 995423 0.00% ₹537,432,006.54
13 Supply, installation including services of RCC Poles – 7/8 meter working load of 115 Kgs for last mile connectivity Nos ₹6,944.31 26,312 ₹182,718,684.72 9.0% 9.0% ₹32,889,363.25 ₹215,608,047.97 995423 0.00% ₹215,608,047.97
14 Supply and installation of Joint Chamber as per E.I. for restoration of existing network (As per Clause 3.2.9 k) of Section – IV B) Nos ₹5,677.65 1,398 ₹7,937,354.70 9.0% 9.0% ₹1,428,723.85 ₹9,366,078.55 995423 0.00% ₹9,366,078.55
15 Supply, installation of Joint Closure, testing and splicing 24 F for Dark Fibre Provisioning and/or attending OFC fault for the first time in a joint as per TEC GR/ E.I. for restoration of existing network (As per Clause 3.2.9 k) of Section – IV B) Per splicing location ₹2,562.15 1,398 ₹3,581,885.70 9.0% 9.0% ₹644,739.43 ₹4,226,625.13 995423 0.00% ₹4,226,625.13
B. OPEX (New Network)
Year 1 2 3 4 5 6 7 8 9 10 Total Cost (₹) (Including GST)
OPEX to be paid as % of the EST. CAPEX 5.5 5.5 5.5 5.5 5.5 6.5 6.5 6.5 6.5 6.5
Bidder Quote At Par/Premium / Discount (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Notional CAPEX - Existing Network
Sr. No. Item Description Unit Unit cost (INR) (excl. GST) Quantity Total Cost (INR) (Excl. GST) Rate of CGST Rate of SGST Rate of IGST Total GST (in INR) Total cost (Inclusive Of GST) (in INR)
A B C=A*B D E F G=C*[(D+E) or F] H=C+G
1a Supply of 24F OFC, Duct and Accessories including all the services, as described at Serial No.-1 in the Table: VII. (4). RKM 398,116.26 1,398.00 556,566,531.48 9% 9% 100,181,975.67 X1 ₹656,748,507.15
C. OPEX (Existing Network)
Year 1 2 3 4 5 6 7 8 9 10 Total (Including GST) (₹)
OPEX to be paid as % of the notional CAPEX 5.5 5.5 5.5 5.5 5.5 6.5 6.5 6.5 6.5 6.5
Bidder Quote At Par/Premium / Discount (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Total Quoted Bid Vlaue
Sr. No. Section Quoted Value (Including GST)
2 B. OPEX (New Network) ₹4,010,768,145.57
3 C. OPEX (Existing Network) ₹394,049,104.29
Total Fianacial Bid Value (Including GST) ₹11,089,430,825.81
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Client Tender_Annexure F_Status of Execution.xlsx
Tender Documents • 0.02 MB
Client Tender_Annexure G_SNOC BOQ & Status.xlsx
Tender Documents • 0.06 MB
Client Tender_Annexure-E_OEM List.docx
Tender Documents • 0.15 MB
Client Tender_Client tender.pdf
Tender Documents • 6.65 MB
Client Tender_Section VI_Price Bid Schedule.xlsx
Tender Documents • 0.02 MB
Corrigendum7.pdf
PDF • 0.32 MB
Corrigendum6.pdf
PDF • 0.18 MB
Corrigendum5.pdf
PDF • 0.18 MB
Corrigendum4.pdf
PDF • 0.18 MB
PreBidQueryClarification.pdf
PDF • 0.41 MB
Corrigendum3.pdf
PDF • 0.27 MB
Corrigendum2_Corrigendum2.pdf
PDF • 0.36 MB
Corrigendum2_Section VI_Price Bid Schedule_V2.xlsx
PDF • 0.02 MB
Corrigendum_1_Annexure F_Status of Execution (1).xlsx
PDF • 0.02 MB
Corrigendum_1_Annexure G_SNOC BOQ & Status (1).xlsx
PDF • 0.06 MB
Corrigendum_1_Annexure-E_OEM List.pdf
PDF • 0.15 MB
Corrigendum_1_Corrigendum1.pdf
PDF • 0.15 MB
Corrigendum_1_Revised NIT_07.11.2026.pdf
PDF • 1.22 MB
Corrigendum_1_Section VI_Price Bid Schedule_V1.xlsx
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .