| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 CrAccepted-AOC | ₹17.7 Cr | L1 | Accepted-AOC 176859000.00 AOC |
| 2 | L2₹19.0 CrRejected-Finance | ₹19.0 Cr | L2 | Rejected-Finance Price Rejected L2 |
| 3 | L3₹19.2 CrRejected-Finance | ₹19.2 Cr | L3 | Rejected-Finance Price Rejected L3 |
| 4 | L4₹19.6 CrRejected-Finance | ₹19.6 Cr | L4 | Rejected-Finance Price Rejected L4 |
| 5 | L5₹20.1 CrRejected-Finance | ₹20.1 Cr | L5 | Rejected-Finance Price Rejected L2 |
| Sl No | Description | Qty | Unit | Prithipal Singh And Co L6 | OMKAR PRASAD BARYA L4 | VL Infraprojects Private Limited L1 | JNB CONSTRUCTION L3 | KESHAV KRUPA CONSTRUCTION PVT LTD. L2 | INTERGEN ENERGY LTD L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Work Name - Work of Augmentation of Water Supply System of KEOLARI town under AMRUT 2.0 | |||||||||
| 2.00 | Survey, Soil investigation, Design and Construction of
a. Supply, installation, testing and commissioning of Raw water pumping sets coupled with motor including electrical control panel , cabling all complete. 3 Nos 30.8LPS @ 35m head.25 HP
a. Raw water main pipes : 300 mm Dia DI K7 pipe including fittings and fixing, support, anchor blocks , thrust block all complete.L-1.1 km
b. Basic units of 3.0 MLD (24 hrs operation) Water Treatment plant comprising of Cascade Aerator, Flash Mixer, Clarifloculator, Rapid Gravity Filter, Raw Water & Clarified water carrying channel, inter-connecting pipes, valves, Chemical Dosing facility, Chlorine dosing facility including Clear Water Reservoir.
c. Construction of Zonal elevated service reservoir: 9 NOS
d. IPS: 50 KL, 2 Nos
e. DI Pipe (K 9) network for Pumping Main Length-48.45 km (For Proposed & Existing WTP)
f. Providing, laying, jointing, testing, commissioning of Distribution network having length of HDPE PN-6 pipe 27.15 Km of dia 90mm to 200mm from OHR to Households including excavation, refilling road cutting/dismantling, restoration, providing valves, specials and fittings all complete.
g. Clear Water Pumping sets: Proposed WTP, IPS-I, IPS-II & Existing WTP
h. House Connection: 3682 Nos
i. Cost of drawing electrical power line including the cost of transformer for Raw water pumping sets, Water Treatment plants & sub-station, including HT 11 KV, LT panels, cabling, posts all complete as required in all installations.
j. Provision for Automation and SCADA | 1 | Job | 22,82,00,000 ₹22.8 Cr | 19,56,00,000 ₹19.6 Cr | 17,68,59,000 ₹17.7 Cr | 19,22,00,000 ₹19.2 Cr | 19,00,70,000 ₹19.0 Cr | 20,10,53,966 ₹20.1 Cr |
Tender Value
₹18.4 Cr
EMD Value
₹9.2 L
Closing Date
15 Feb 2025, 5:30 pmClosed
C.M.O. Nagar Parishad, KEOLARI Dist. SEONI
C.M.O. Nagar Parishad, KEOLARI Dist. SEONI
Work of Augmentation of Water Supply System of KEOLARI town under AMRUT 2.0
2025_UAD_393593_1
971/PWD/NP/2025
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
730 days
Work
AS PER NIT AND TENDER DOC
5 documents required · 5 mandatory
₹30,000
₹9.2 L
C.M.O. Nagar Parishad, KEOLARI Dist. SEONI
12 Feb 2026
7 Jan 2025
17 Feb 2025
7 Jan 2025
15 Feb 2025
7 Jan 2025
20 Jan 2025
Amount
Work Name - Work of Augmentation of Water Supply System of KEOLARI town under AMRUT 2.0
Survey, Soil investigation, Design and Construction of a. Supply, installation, testing and commissioning of Raw water pumping sets coupled with motor including electrical control panel , cabling all complete. 3 Nos 30.8LPS @ 35m head.25 HP a. Raw water main pipes : 300 mm Dia DI K7 pipe including fittings and fixing, support, anchor blocks , thrust block all complete.L-1.1 km b. Basic units of 3.0 MLD (24 hrs operation) Water Treatment plant comprising of Cascade Aerator, Flash Mixer, Clarifloculator, Rapid Gravity Filter, Raw Water & Clarified water carrying channel, inter-connecting pipes, valves, Chemical Dosing facility, Chlorine dosing facility including Clear Water Reservoir. c. Construction of Zonal elevated service reservoir: 9 NOS d. IPS: 50 KL, 2 Nos e. DI Pipe (K 9) network for Pumping Main Length-48.45 km (For Proposed & Existing WTP) f. Providing, laying, jointing, testing, commissioning of Distribution network having length of HDPE PN-6 pipe 27.15 Km of dia 90mm to 200mm from OHR to Households including excavation, refilling road cutting/dismantling, restoration, providing valves, specials and fittings all complete. g. Clear Water Pumping sets: Proposed WTP, IPS-I, IPS-II & Existing WTP h. House Connection: 3682 Nos i. Cost of drawing electrical power line including the cost of transformer for Raw water pumping sets, Water Treatment plants & sub-station, including HT 11 KV, LT panels, cabling, posts all complete as required in all installations. j. Provision for Automation and SCADA
KESHAV KRUPA CONSTRUCTION PVT LTD. (BID ID -1197077)
JNB CONSTRUCTION (BID ID -1198309)
OMKAR PRASAD BARYA (BID ID -1198364)
INTERGEN ENERGY LTD (BID ID -1198040)
Prithipal Singh And Co (BID ID -1189335)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid