Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.0 L+₹1.8 L (7.13%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹28.9 L+₹3.7 L (14.6%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical 0 | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹38.7 L
EMD Value
₹78,000
Closing Date
4 Dec 2023, 1:00 pmClosed
SE IWC, SRE
OFFICE OF THE SE IWC, SRE
Distt. Saharanpur me Purvi Yamuna Canal ke km. 14.000 se km. 16.000 ke Madhye Katav Sathal par Wair Crate Laing and km. 14.773 par Inlate ki Punarsathapna ka karya
2023_UPIDC_863160_13
06/SE/SRE/2023-24
Open Tender
Civil Works
Item Rate
30 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹78,000
2 Mar 2024
20 Nov 2023
4 Dec 2023
20 Nov 2023
4 Dec 2023
20 Nov 2023
Amount
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer- in-Charge.
Centering & Shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work.
Laying C.C. in 1:3:6 ratio i/c i/c all cost of material, labour, t&P etc for proper completion of work.
Ist Class Brick work in 1:4 cement mortar i/c all cost of material, labour, t&P etc for proper completion of work.
Centering & Shuttering for R.C.C. work i/c all cost of material, labour, t&P etc for proper completion of work.
Supply & laying Steel Reinforcement in Bed Block i/c cutting, binding & bending, Placing in position i/c all cost of material, labour, t&P etc for proper completion of work.
Laying R.C.C. in 1:1.5:3 ratio i/c i/c all cost of material, labour, t&P etc for proper completion of work..
Laying Cement Pointing (Struc Deep) over Brick Masonery i/c all cost of material, labour T&P etc comp.
Supplying of 8 SWG G.I. wire crates size 3.00 x 1.50 x 1.00 m with 15 x 15 cm square mesh with double knotted I/C cost of G.I. wire at site etc.
Laying & packing boulder 20 to 40 Kg. wt. in wire crates with tying excluding cost of boulder etc complete (Labour only).
Supply & laying of Dry Boulder 20 to 40 k.g. i/c all cost of material, labour, t&P etc for proper completion of work.
ARUN SINGH
MOHD RIZWAN CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .