Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC Quoted rate is 9.50 percent Above |
| 2 | Rejected-Technical | - | - | Rejected-Technical unsuccessful not being lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical unsuccessful not being lowest bidder |
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
10 Aug 2026, 11:00 amClosed
Staff Officer (Civil), PPR Area
GM OFFICE PPR AREA
Distempering, painting and sanitation of community place in LMV section and excavation workshop callback area on special occasion in Piparwar unit of Ashok OCP, Piparwar Area.
2026_CCL_362776_1
GM(PPR)/Civil/Etender26-27/892
Open Tender
Civil Works - Others
Percentage
30 days
LMV section and excavation workshop callback area
AS PER NIT
3 documents required · 3 mandatory
₹2,300
3 Sept 2026
30 Jul 2026
11 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
31 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 1 | Sqm | 40.25 | ₹40.21 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand aggregate 20 mm nominal size). | 1 | Sqm | 74.05 | ₹73.98 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand aggregate 20 mm nominal size) | 1 | Sqm | 73.4 | ₹73.33 |
| 1.04 | Reinforced cement concrete work in walls including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 952.45 | - |
| 1.05 | Reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. | - | Cum | 239.57 | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts. | - | Sqm | 10.55 | - |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for
mass concrete. | - | Sqm | 230.6 | - |
| 1.08 | Carriage of material by mechanical transporting including loading, unloading and stacking earth upto 01 KM lead. | - | cum | 7,988.95 | - |
| 1.09 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_375678.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.78 MB
BOQ_375678.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .