Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42,999Accepted-Finance BHAGWATI NAGAR JAMMU | L1 | Accepted-Finance lowest | |
| 2 | L2₹45,000+₹2,001 (4.65%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L2 | Rejected-Finance not lowest | |
| 3 | L3₹49,500+₹6,501 (15.1%)Rejected-Finance GOLE GUJRAL JAMMU JAMMU | L3 | Rejected-Finance not lowest | |
| 4 | L4₹53,550+₹10,551 (24.5%)Rejected-Finance BHAGWATI NAGAR JAMMU | L4 | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | PERFECT ELECTRICAL WORKS L1 | BEE AAR ENTERPRISES L4 | Shivam enterprises L2 | M/S GOPAL ELECTRICAL L3 |
|---|---|---|---|---|---|---|---|
| 1.00Repair to 63 KVA electric Transformer installed at LIS Chung. | |||||||
| 1.01 | Disconnecting the 63 KVA electric transformer from the input and output connections, loading the electric transformer using manual labour & crane/chain pulley block in a vehicle and then shifting it to workshop for repairs. Dismantling of the 63 KVA transformer at workshop by way of extracting out the damaged HV coils & LV coils, LT bushes-04 no., HT bushes-03 no., damaged insulator, rubber gasket, copper nuts and bolts. Complete rewinding of HV coils and LV coils (i.e. 03 no. leg coil assembly) with a specified wire of appropriate gauge. Keeping the leg coil assembly in the Oven for heat treatment to make it moisture free, complete insulation and lowering of the leg coils assembly in the sump of the transformer after cleaning the sump tank with appropriate chemical agent. Providing and fitting of LT and HT bush rod sets, new insulator, rubber gasket, new copper nuts and bolts. Refitting of the top cover with new nut & bolts along with washers. Providing/ filling of new 110 ltrs T-oil approximately in sump for topping up of transformer. Testing the continuity of each phase and securing all connections and checking for meager value. Shifting the repaired electric transformer back to site, unloading and installing at hoisting channel/bed with the help of crane/chain pulley block and skilled manual labour, connecting of HT and LT cable by P/F the new thimbles of appropriate rating/size then testing the transformer on full load at site. The job includes the cost of material, labour charges, loading & unloading, to & fro carriage, testing and installation and hire charges of the crane used during the execution of job. Complete job includes rebate on old parts. | 1 | Job | 42,999 ₹42,999 Lowest | 53,550 ₹53,550 | 45,000 ₹45,000 | 49,500 ₹49,500 |
| 1.02 | Rebate on Old Parts | 1 | Job | -1,290 ₹-1,290 | -1,607 ₹-1,607 | -1,350 ₹-1,350 | -990 ₹-990 |
Tender Value
₹63,000
EMD Value
₹1,260
Closing Date
7 Oct 2025, 12:00 pmClosed
XEN MID JAMMU
MID JAMMU
Repair to 63 KVA electric Transformer installed at LIS Chung.
2025_IFC_289981_1
MID/J/e-NIT/2025-26/85
Open Tender
Repair and Maintenance Works
Item Wise
10 days
chung
as per tender notice
8 documents required · 8 mandatory
₹200
Executive Engineer MID JAMMU
₹1,260
18 Nov 2025
27 Sept 2025
7 Oct 2025
27 Sept 2025
7 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .