| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.9 LAccepted-AOC | 1 | Accepted-AOC The lowest rate quoted by the contractor M.VEERARAGAVAN | |
| 2 | 2₹38.4 L+₹52,671.10 (1.39%)Rejected-Finance | 2 | Rejected-Finance Admitted | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Willing to Withdraw |
| Sl No | Description | Qty | Unit | M.VEERARAGAVAN L1 | KCP PRAKASH CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub - soils with initial lead and lift on per SS 20B for narrow foundation etc., complete. | 204 | cum | 263 ₹53,652 Lowest | 285 ₹58,140 |
| 2.00 | Supply and filling with M.sand including cost and conveyance of all materials,labour charges etc…completed | 10.2 | cum | 1,736 ₹17,707.2 Lowest | 1,736.9 ₹17,716.38 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 40.7 | cum | 5,344 ₹2,17,500.8 Lowest | 5,344.8 ₹2,17,533.36 |
| 4.00Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete. | |||||
| 5.00 | Up to Ground Level | 330 | sqm | 547 ₹1,80,510 Lowest | 547.5 ₹1,80,675 |
| 6.00 | Above Ground Level | 290.93 | sqm | 1,095 ₹3,18,568.35 Lowest | 1,095 ₹3,18,568.35 Lowest |
| 7.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 265.82 | cum | 6,635 ₹17,63,715.7 Lowest | 6,635.8 ₹17,63,928.36 |
| 8.00 | Supply and fixing of 0.90M dia pipe NP3 including all labour charges etc.,complete | 42 | Rm | 4,336 ₹1,82,112 | 4,335 ₹1,82,070 Lowest |
| 9.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 1,032.38 | cum | 386 ₹3,98,498.68 Lowest | 410 ₹4,23,275.8 |
| 10.00 | Cost and Supply of GI Pipe of size 50 mm dia including cost and conveyance of all materials to site including all labour charges etc.complete, | 64.8 | Rm | 473 ₹30,650.4 Lowest | 473 ₹30,650.4 Lowest |
Tender Value
₹38.3 L
EMD Value
₹38,250
Closing Date
9 Feb 2026, 3:00 pmClosed
Block Development Officer BP Acharapakkam
Block Development Office BP Acharapakkam
Construction of Retaining wall to e-Vehicle Charging station at Kadamalaiputhur In Acharapakkam Union in Chengalpattu District having Pkg
2026_RDTN_650625_1
DIPR/225/A12/2026
Open Tender
Civil Works
Item Rate
90 days
Kadamalaiputhur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹38,250
Yes
7 Mar 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
Earth work excavation in all soils and sub - soils with initial lead and lift on per SS 20B for narrow foundation etc., complete.
Supply and filling with M.sand including cost and conveyance of all materials,labour charges etc…completed
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Up to Ground Level
Above Ground Level
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and fixing of 0.90M dia pipe NP3 including all labour charges etc.,complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cost and Supply of GI Pipe of size 50 mm dia including cost and conveyance of all materials to site including all labour charges etc.complete,
Supplying, fabricating and placing in position of Chainlinked fencing wire mesh including cost of binding wire and labour charges etc. complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_780088.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_780088.xls
BOQ • 0.31 MB
Technical.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .