Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹96,572.60Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹97,057.89+₹485.29 (0.50%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L2₹97,057.89+₹485.29 (0.50%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
5 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
nit
2026_RDPR_315907_17
e-NIT No. 43 REW UDHAMPUR of 2026-27 Dated 14-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
boq
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹1,940
14 Aug 2026
15 Jul 2026
6 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | arth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil | 38.69 | sqm | 91.75 | ₹3,549.81 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 37.04 | cum | 479.3 | ₹17,753.27 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.72 | cum | 4,826.5 | ₹8,301.58 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6.73 | cum | 4,774.46 | ₹32,132.12 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work | 44.96 | sqm | 286.35 | ₹12,874.3 |
| 6 | Providing and laying Soling Stone dressed laid horizontally | 4.85 | cum | 1,235.55 | ₹5,992.42 |
| 7 | Carriage of Cement 18 Km Mt &100 Mtr A.t | 1.67 | mt | 474.34 | ₹792.15 |
| 8 | Carriage of Sand 90 Km Mt &100 Mtr A.t | 3.28 | cum | 1,427.1 | ₹4,680.89 |
| 9 | Carriage of agg 22 Km Mt &100 Mtr A.t | 7.59 | cum | 676.38 | ₹5,133.72 |
| 10 | Carriage Of Stone 350 Mt.At/Hl | 5.23 | cum | 544.48 | ₹2,847.63 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1027035.xls
BOQ • 0.31 MB
Extension.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .