Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-AOC | ₹4.8 L | 1 | Accepted-AOC Awarded to L1 |
| 2 | 2₹5.7 L+₹86,994 (18.0%)Rejected-Finance | ₹5.7 L+₹86,994 (18.0%) | 2 | Rejected-Finance L1 Awarded |
| 3 | 3₹6.2 L+₹1.4 L (28.0%)Rejected-Finance AT OLD KARO P O BERMO P S BERMO DIST BOKARO JHARKHAND 829104 | BOKARO | JHARKHAND | 829104 | ₹6.2 L+₹1.4 L (28.0%) | 3 | Rejected-Finance L1 Awarded |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible as per NIT |
Tender Value
₹5.2 L
EMD Value
₹6,540
Closing Date
15 Sept 2022, 4:00 pmClosed
Staff Officer (PnP)
GM Office BnK Area Kargali PO-Bermo, Dist-Bokaro
Plantation of 500 nos. plants saplings in Karo Expansion OCP with bamboo gabion
2022_CCL_255577_2
GM(BnK)/ SO(PnP)/Env/E -Tender/22-23/45
Open Tender
Miscellaneous Works
Item Rate
913 days
Karo Expansion OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,540
3 Nov 2022
7 Sept 2022
16 Sept 2022
8 Sept 2022
15 Sept 2022
8 Sept 2022
8 Sept 2022 - 15 Sept 2022
Amount
Item Description/ Heading
A. Advance Work and First year Plantation
Survey, demarcation & mapping of Plantation alongwith Initial Cleaning of plantation area by cutting jungle & bushes as where necessary.
Bamboo tree guard with square cross section (size 4 feet height, 2 ft 6 inch width) with 2 ft 6 inch cross mesh with bamboo, 4nos of 5 ft. bamboo support with wire for holding support. The bamboo should be fixed 30 cm. below ground level.
Supplying and stacking of the plants at site of height 120-150 cm in big polybags of size 25 cm.
Soil Work in Digging, Planting and Filling of planting pits, Size of (0.3mx 0.3 m x.60m) with soil and cow dung in 4:1 ratio. Including supply of cow dung by the bidder.Planting of saplings in pits including carriage of plants up to the site .
Providing of irrigation water through water tanker(capacity 5000 ltrs) of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work. At a time watering 20.00 liter/plant with one labour to be done i/c cost of water, filling of tanker, wartering at site with all leads and lifts. Watering shall be done to the plants 24 times/yr{Summer(April to July)- 4 times/month, Winter(Dec. to March)- 2 times/month,Nil for Monsoons months(Aug to Nov.)}
Howing, Deweeding and supplying Fertilizers/Chemicals, etc. (per plant 50gm DAP, 14gm Urea) twice in a year
Protection of Plants (Prahari), one labour(maali) watching over the plantation regularly.
SignBoard ( Dimension iron sheet 2 feet height , 3 feet width and 4 feet iron angle legs for support)
B. Second Year work
Howing, Deweeding and supplying Fertilizers/Chemicals, etc. (per plant 50gm DAP, 14gm Urea) twice in a year
Protection of Plants (Prahari), one labour(maali) watching over the plantation regularly.
Providing of irrigation water through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work. At a time watering 20.00 liter/plant with one labour to be done i/c cost of water, filling of tanker, wartering at site with all leads and lifts. Watering shall be done to the plants 24 times/yr{Summer(April to July)- 4 times/month, Winter(Dec. to March)- 2 times/month, Nil for Monsoons months(Aug to Nov.)}
Supplying, stacking of the plants at site of height 120-150 cm in big polybags of size 25 cm and digging and planting of saplings against replacement of dead plants (@10%)
Removal of damaged parts and Supply and Installation of Bamboo tree guard with square cross section (size 4 feet height, 2 ft 6 inch width) with 2 ft 6 inch cross mesh with bamboo, 4 nos of 5 ft. bamboo support with wire for holding support. The bamboo should be fixed 30 cm. below ground level.(@10% )
C. Third Year work
Howing, Deweeding and supplying Fertilizers/Chemicals, etc. (per plant 50gm DAP, 14gm Urea) twice in a year
Protection of Plants (Prahari), one labour(maali) watching over the plantation regularly.
Providing of irrigation water through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the site of work. At a time watering 20.00 liter/plant with one labour to be done i/c cost of water, filling of tanker, wartering at site with all leads and lifts. Watering shall be done to the plants 24 times/yr{Summer(April to July)- 4 times/month, Winter(Dec. to March)- 2 times/month, Nil for Monsoons months(Aug to Nov.)}
Supplying, stacking of the plants at site of height 120-150 cm in big polybags of size 25 cm and digging and planting of saplings against replacement of dead plants (@10%)
Removal of damaged parts and Supply and Installation of Bamboo tree guard with square cross section (size 4 feet height, 2 ft 6 inch width) with 2 ft 6 inch cross mesh with bamboo, 4 nos of 5 ft. bamboo support with wire for holding support. The bamboo should be fixed 30 cm. below ground level.(@10% )
Total impact of GST for the purpose of CTC
TEKLAL MAHTO
AKASH KUMAR MAHTO
JITENDRA KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .