Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
12 Jun 2023, 12:00 pmClosed
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Replacement of damaged 05MVA TF at 33/11KV Sub-Station Rampur Road, Hapur in EDD-I Hapur
2023_PVVNL_808476_1
22(W)/EDCH/2023-24
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹1,500
12 Jun 2023
2 Jun 2023
12 Jun 2023
2 Jun 2023
12 Jun 2023
2 Jun 2023
Amount
FOR REMOVAL OF DAMAGED 05MVA POWER TRANSFORMERS AT 33/11KV SUB-STATION-RAMPUR ROAD HAPUR, IN THE JURISDICTION OF EDD-I HAPUR, UNDER EDC, HAPUR.
Dragging/Shifting of 05MVA Power T/F at 33/11KV Sub-Stations-Noorpur Road Muradnagar (EDD-Muradnagar) with the help of Crane and Manual labour and lowering towards ground level tuning the T/F and putting out side of switchyard.
Carriage of 05MVA Power Transformers in Trailler from 33/11KV Sub-Stations-Noorpur Road Muradnagar (EDD-Muradnagar) to site of work 33/11KV Sub-Station-Rampur Road Hapur, with loading & unloading by crane at both ends. (Distance near about one side 50 KM).
cutting the earthing strips at different places and neutral point of 05MVA damaged T/F at above 33/11KV Sub-Stations.
Removal of 11KV XLPE Cable connections from 05MVA damaged T/F at above 33/11KV Sub-Stations.
Removal of Jumpering of HV/LV side of 05MVA damaged T/F at above 33/11KV Sub-Stations.
Dragging/Shifting of damaged 05MVA T/F at above 33/11KV Sub-Stations with the help of Crane and Manual labour and lowering towards ground level tuning the T/F and putting out side of switchyard.
Dragging/Shifting of 05MVA Power T/F from dump site to inside switchyard on foundation, with the help of Crane and Manual labour, at above 33/11KV Sub-Stations
Connecting the earthing strips at different places and neutral point of the Power T/F with proper cutting, jointing and welding at site as per requirment and specification given in construction manual issued by RESPO Norms Lucknow.
Making the connection of 11KV XLPE Cable with 05 MVA Power T/F including the cost of required Lugs & PVC Tape etc. at 33/11KV Sub-Stations.
Connecting all jumpers on HV/LV side and 11KV cable with providing cotton tap & empire Tape etc.
Earthing of neutral & body of Transformers By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 120 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
OM CONSTRUCTION COMPANY
D S CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .