Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹586.8 CrAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹586.8 Cr | 1 | Accepted-AOC Approved by Government |
| 2 | 2₹587.2 CrRejected-Finance 7TH FLOOR KALPATARU SYNERGY OPP GRAND HYATT SANTACRUZ EAST MUMBAI 400055 MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400055 | ₹587.2 Cr | 2 | Rejected-Finance Not approved by Government |
| 3 | 3₹665.2 CrRejected-Finance S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | ₹665.2 Cr | 3 | Rejected-Finance Not approved by Government |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not approved by Govt. |
Tender Value
Refer Docs
EMD Value
₹6.4 Cr
Closing Date
10 Jul 2023, 5:00 pmClosed
CHIEF ENGINEER, MEGALIFT
PLOT NO.A-8/2BHOI NAGAR,BHUBANESWAR-751022
MEGALIFT PROJECTS
2023_CEMLP_89215_1
6ML/2023-24
Open Tender
Civil Works - Lift Irrigation Schemes
1080 days
ANGUL, DHENKANAL
Please refer Tender documents.
5 documents required · 5 mandatory
₹50,000
EXECUTIVE ENGINEER,MEGALIFT PROJECT DIVISION,ANGUL
₹6.4 Cr
Yes
O/o CHIEF ENGINEER, MEGALIFT,BHUBANESWAR
13 Nov 2023
23 May 2023
14 Jul 2023
23 May 2023
10 Jul 2023
23 May 2023
23 May 2023 - 5 Jun 2023
7 Jun 2023
Execution of 13 nos. of Lift Irrigation Schemes with intake points on Manjore reservoir, Brahmani river, Rengali Left Main canal and Rengali Right Main Canal having Command area between 500Ha. to 2000 Ha. in Cluster No. XXII in the districts of Angul and Dhenkanal including its distribution network, up to 1 Ha Chak having total planned Culturable Command Area of 19242 Ha. on “EPC –Turn Key” basis comprising work of Detailed Survey, Planning, Design, Drawing, Estimation, Preparation of Land Acquisition Cases, Preparation of cases for forest land if any, Installation of electrical system connectivity from the Local/Identified Grid Substations, and commissioning of all the LI schemes.
Operation & maintenance of 13 schemes of the cluster including local substations for 15(fifteen) years or fifteen Khariff water supply seasons whichever is more, after completion as per relevant clauses of the agreement.
Kalpataru Projects International Limited
MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid