| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.4 L+₹2.5 L (17.1%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SMU ENTERPRISES | K.THANGAMANI CONTRACTOR |
|---|---|---|---|---|---|
| 1.00 | Insulation work for the areas where approach platform is available and height of working area in ‘O’ mtr to 5 mtr from the ground from the approach including re- insulation and covering with G.I sheet. | 200 | M2 | 72,000 ₹84,960 Lowest | 80,000 ₹94,400 |
| 2.00 | Scaffolding for insulation work for the area where the work area is above 5 mtr from the ground o from the approach platform. | 5 | Nos | 12,500 ₹14,750 Lowest | 14,500 ₹17,110 |
| 3.00 | Dismantling of Insulation in above 5 Mtr | 250 | M2 | 90,000 ₹1,06,200 Lowest | 1,00,000 ₹1,18,000 |
| 4.00 | Reinsulation in above 5 mtr | 250 | M2 | 1,25,000 ₹1,47,500 Lowest | 1,50,000 ₹1,77,000 |
| 5.00 | Cost of materials:
(Tenders scope: LRB wool mattress insulation fixing materials and G I sheet of 0.63 mm thickness | 450 | M2 | 9,90,000 ₹11,68,200 Lowest | 11,70,000 ₹13,80,600 |
| 6.00 | Charges for removal of ash and debris from the ground floor area below hot air gates and dampers of mills, clearing and transporting them to a specified area within TTPS. | 8 | Days | 1,40,000 ₹1,65,200 Lowest | 1,62,000 ₹1,91,160 |
| 7.00 | Charges for removal of Ash and debris from around the hot and cold air ducts of mills A to F clearing and transporting them to a specified area within TTPS. | 3 | Days | 53,400 ₹63,012 Lowest | 60,000 ₹70,800 |
Tender Value
Refer Docs
EMD Value
₹11,900
Closing Date
9 Jul 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM I Unit III Removal of all the damaged insulation in the Hot Primary Air ducts from Air preheaters to mills and insulating the ducts with LRB wool mattresses and cladding with G.I sheet of 0.63mm thickness and removal of ash
2025_EB_573251_1
CE/SE/O/TTPS/Spec.No.141/25-26
Open Tender
Miscellaneous Works
Item Rate
30 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹11,900
Yes
15 Sept 2025
24 Jun 2025
10 Jul 2025
24 Jun 2025
9 Jul 2025
24 Jun 2025
Insulation work for the areas where approach platform is available and height of working area in ‘O’ mtr to 5 mtr from the ground from the approach including re- insulation and covering with G.I sheet.
Scaffolding for insulation work for the area where the work area is above 5 mtr from the ground o from the approach platform.
Dismantling of Insulation in above 5 Mtr
Reinsulation in above 5 mtr
Cost of materials: (Tenders scope: LRB wool mattress insulation fixing materials and G I sheet of 0.63 mm thickness
Charges for removal of ash and debris from the ground floor area below hot air gates and dampers of mills, clearing and transporting them to a specified area within TTPS.
Charges for removal of Ash and debris from around the hot and cold air ducts of mills A to F clearing and transporting them to a specified area within TTPS.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .